Norway,
More & Romsdal
- no/65
Road
Open invitation to tender, deadline 26th April, 2004 for lengthening of the Vike tunnel on county road 191 in Nesset municipality. Approximately 1.2 km, width 7.5 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=043208-2004, OJ S 50, or contact Statens vegvesen, Molde, fax +47 71274101. E-mail firmapost-midt@vegvesen.no 13/04.Open call for bids, deadline 9th June, 2005 for construction of the approx. 1,463 m Alnes tunnel and connecting roads (1,217 m) on county road 127. The tunnel is to be constructed in accordance with tunnel class A with an expanded T5.5 profile with a cross section of approx. 55 sq m (one lane and pedestrian/cycle path). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=073762-2005, OJ S 76, or contact Statens vegvesen, Molde, fax +47 71274101 or 70175076. E-mail firmapost-midt@vegvesen.no 17/05.Skanska secured a NOK72 million contract to build section Godoy-Alnes (2,680 m) on county road Fv 217, including the 1,463 m Alnes tunnel. The tunnel is to be constructed in accordance with tunnel class A with an expanded T5.5 profile with a cross section of approx. 55 sq m (one lane and pedestrian/cycle path). Visit www.skanska.no 31-32/05.Open call for tenders, deadline 21st December, 2005 for construction of the 2,250 m Skrøo tunnel and connecting roads on road 062 from Fressvika to Jordalsgrenda in Nesset/Sunndal municipality. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=219589-2005, OJ S 222, or contact Statens vegvesen Region central, Molde, fax +47 71274101. E-mail firmapost-midt@vegvesen.no 48/05.NCC Construction received a NOK90 million contract to build the 2,250 m-long Skrøo tunnel and connecting roads on road Rv62 from Fressvika to Jordalsgrenda in Nesset/Sunndal municipality. Work starts immediately for completion on 29th August, 2007. Visit www.ncc.info 14/06.
Invitation to tender, deadline 04.01.2013, for delivery and installation of electrotechnical equipment and night lighting at new 7.5 km-long Oppdolstranda tunnel and 400 m-long escape tunnel and adjoining areas on National road 70. Contract commences 17.10.2013 for completion 18.06.2014. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=272738. Further information, specs and docs from Odd Arild Lindseth at Statens vegvesen Region midt in Molde, tel +47 91346383, e-mail odd.lindseth@vegvesen.no to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=362876-2012. 46/12.
Norway,
Akershus
- no/63
Motorway
Open call for bids, deadline 6th February, 2004 for construction plans, tender documents, work drawings, etc. for the new E16 from Wøyen to Bjørum in Bærum municipality, Akershus county. Length is 5.1 km, whereof 2.5 km in tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=215637-2003, OJ S 242, or contact Statens vegvesen Region east, Oslo, fax +47 23054001. E-mail wencaa@vegvesen.no 02/04.Preinformation notice for construction of the E16 motorway Woyen-Bjorum (3,740 m), section Woyen-Isi, including two 2-lane tunnels. The 2 x 1,100 m Brenne tunnel includes 940 m of rock tunnel and 160 m of false tunnel. The 2 x 1,440 m Berghoff tunnel includes 1,310 m of rock tunnel and 130 m of false tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=122986-2005, OJ S 124, or contact Statens vegvesen Region east, Lillehammer, fax +47 97135193. E-mail endreh@vegvesen.no 27/05.Open call for bids, deadline 21st October, 2005 for construction of the new E16 from Woyen to Bjorum, section Woyen-Isi in Bærum municipality. It is a 3.9 km 4-lane road including two tunnels of 2.5 km altogether. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=171223-2005, OJ S 172, or contact Statens vegvesen, Oslo, fax +47 24058101. E-mail endreh@vegvesen.no 37/05.The lowest bidder for section Wøyen-Isi of the E16 from Wøyen to Bjørum in Bærum municipality is Veidekke with NOK450,666,168. The other bidders are Mesta (NOK466,264,311), Skanska (NOK498,337,649), NCC Construction (NOK505,274,553) and Leonard Nilsen & Sønner (NOK511,746,240). This 3.9 km 4-lane road stretch includes two twin bored tunnels: Brenne (2 x 1,100 m, whereof 940 m in rock and 160 m in cut-and-cover) and Berghoff (2 x 1,440 m, whereof 1,310 m in rock and 130 in cut-and-cover). Visit www.vegvesen.no/region_ost/prosjekter/e16/woyen_bjorum.stm 46/05.Veidekke announced on 23rd November that it had received a NOK450.7 million road contract from the Norwegian road administration to build the new Woyen-Bjorum section of the E16 trunk road outside Oslo. In addition to the construction of a 3.9 km four-lane road the contract also includes two tunnels, slip roads and local roads. Click no/63. Visit www.veidekke.no 49/05.Open call for tenders, deadline 12th February, 2007 for control engineering for the Wøyen-Bjørum section of the E16. The contract comprises construction of a 5 km four-lane road in Bærum municipality. Half of the section is in tunnel. The main assignment for the consultant is to follow up contractors for road and tunnel works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258275-2006, OJ S 241, or contact Statens vegvesen, Lillehammer, fax +47 24058001. E-mail knutgl@vegvesen.no or kundesenter.oslo@vegvesen.no 01-02/07.Hifab concluded a NOK1.2 million deal for control engineering for the Wøyen-Bjørum section of the E16. The contract comprises construction of a 5 km four-lane road in Bærum municipality. Half of the section is in tunnel. The main assignment for the consultant is to follow-up contractors for road and tunnel works. Visit www.hifab.no 42/07.Open invitation to tender, deadline 1st August, 2008 for delivery and assembly of ITV/AID in the Brenne and Skui tunnels. The contract comprises of approx. 85 cameras, approx. 48 fibre modems and approx. 22,000 m of cables of varied types. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158791-2008, OJ S 119, or contact Statens vegvesen Region east, Lillehammer, tel. +47 24058726 or 91831574. E-mail torbre@vegvesen.no 26/08.
Open invitation to tender, deadline 17.10.2011, for construction plan and follow-up for 3.5 km-long section of E 16 Sandvika-Woyen including 2 km-long complex twin tunnel of which 0.6 km will be built using concrete. Contract duration 01.12.2011 to 01.08.2019. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=234289. Further information, specs and docs from Tom Heldal Larsen at Statens vegvesen Region ost in Lillehammer, tel +47 97522474, e-mail tom.larsen@vegvesen.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278847-2011. 36/11.
Dr.Ing. A.Aas-Jakobsen As (Oslo) secured the EUR10.5 million contract, VAT not included, for construction plan and follow-up for 3.5 km-long section of E16 Sandvika-Woyen including 2 km-long complex twin tunnel of which 0.6 km will be built using concrete. Contact Tom Heldal Larsen at Statens vegvesen Region ost in Lillehammer, tel +47 97522474, e-mail tom.larsen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=256952-2012 and www.aaj.no. 33/12.
Open invitation to tender, deadline 12.08.2014, for building inspection and vibration measurement in connection with blasting works during construction of 2.3 km-long Bjornegard rock tunnel, twin tube with two lanes each way on E16 Sandvika-Woyen. Contract duration 24.09.2014 to 01.02.2018. Further information, specs and docs from Jorgen Stenerud at Statens vegvesen Region oest in Lillehammer, tel +47 47623571, e-mail jorgen.stenerud@vegvesen.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=199758-2014.
Ref.n. 2014/058182. 25/14.
Open invitation to tender, deadline 03.12.2015, for the supply of lighting for the twin tube, double laned 2.3 km-long Bjornegard rock tunnel on the E16 Sandvika-Woyen. Contract duration 03.12.2015 to 14.04.2017. Contact Statens vegvesen Region East, att.n Odd Kleiven, Lillehammer, tel +47 90899345, e-mail odd.kleiven@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=364991-2015. Ref.n. 2015122182. 42/15.
Open invitation to tender, deadline 01.02.2016, for the procurement of directional fans for the 2.3 km-long Bjornegard tunnel on the E16 Sandvika-Woyen. Contract duration is from 01.02.2016 to 07.08.2017. Contact Statens vegvesen Region East, att.n Odd Kleiven, Lillehammer, tel +47 90899345, e-mail odd.kleiven@vegvesen.no. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/138261. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=418879-2015. Ref.n. 15/235715. 49/15.
Open invitation to tender,
deadline 07.07.2016, for the delivery and execution of SRO installations for
twin tube Bjornegard tunnel, including the portal areas and for the E16 that
are in the open air. This is for the stretch from Kjorbokkrysset in the south
to Voyenenga in the north, a total of 3.6 km. The contract duration is from the
10.10.2016 to 13.12.2019. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/144096. Contact the Norwegian Public Roads Administration,
Eastern Region, att.n Odd Kleiven, Lillehammer, tel +47 91502030, e-mail odd.kleiven@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=169979-2016. Ref.n. 16/25894. 20/16.
Norway,
Nordland
- no/59
Road
Open call for bids, deadline 30th June, 2003 for construction of 14.4 km road section Gullersfjordbotn-Austerstraumen, including the 6.4 km Sørdals tunnel. It is a 8.5 m-wide single-tube tunnel to be blasted in gneiss. Rockbolts and shotcrete will be implemented for the support and dumper trucks will be used for muck removal. Cost: NOK320 million approximately, financed by the national public roads administration. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=096200-2003, OJ S 107, or contact Statens Vegvesen Region nord, Bodø, fax +47 75552951. E-mail firmapost-nord@vegvesen.no and einar.karlsen@vegvesen.no 24/03.The three bidders for the construction of the Gullersfjordbotn-Austerstraumen road section including the 6.4 km Sørdals tunnel through the BrynjulfslÃÂ¥ttheia mountain are Scandinavian Rock Group (lowest bidder with NOK212.7 million), Leonhard Nilsen & Sønner (NOK224.7 million) and Mesta AS (NOK 233.4 million). 29/03.Scandinavian Rock Group (SRG) will build road section Gullersfjordbotn-Austerstraumen, including the 6.4 km-long 8.5 m-wide Sørdals tunnel, a single bore to be blasted in gneiss. Contract value NOK212.7 million. Visit www.srg.no 36/03.Open invitation to tender, deadline 7th November, 2005 for the delivery of directional control fans for four tunnels: Soerdals (6,370 m), Ingelsfjord tunnel (1,240 m), Raftsund (1,530 m) and Fjoesdal (1,600 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=177580-2005, OJ S 179, or contact Statens vegvesen, Bodoe, fax +47 75586501. E-mail robjak@vegvesen.no 38/05.
Norway,
Oslo
- no/56
Highway
Open call for bids, deadline 2nd June, 2003 for construction plans, tender documents and follow-up during construction for a new 700 m immersed tunnel under the Oslo harbour at Bjørvika between the Festnings tunnel and the Ekeberg tunnel on road E18, including connections with the existing road/street network. The works consist of engineering design services for big concrete constructions, complicated foundation works and rock tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=063650-2003, OJ S 72, or contact Norwegian national road administration, Oslo, fax +47 23054158 or 4001. E-mail svein.roed@vegvesen.no. Visit www.vegvesen.no/oslo/bjorvika/bjorvika.stm 16/03.Open procedure, deadline 20th May, 2005 for construction of the Bjoervika immersed tunnel under Oslo Harbour. It is a 675 m tunnel connecting the existing Festning and Ekeberg tunnels. The tunnel has 2 x 3 lanes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031938-2005, OJ S 33, or contact Statens vegvesen Region east, Lillehammer, fax +47 61257480 or 24058774. E-mail firmapost@vegvesen.no or sveroe@vegvesen.no. Subscribe to E-News Weekly 4/2005. 08/05.The Norwegian public roads administration announced its intention to award the Sjoedel contract to Skanska, Bam Civiel and Volker Stevin, who submit an offer of NOK968 million for the immersed tunnel piece in the Bjoervika project at Oslo harbour. The project consists of a 670 m-long 35 to 40 m-wide 6-element immersed tube at 112 m under the sea level. The contract is expected to be signed at the beginning of August with work on site starting at the beginning of September when the necessary detailed plans/documentation have been approved. Completion is expected in 2010. Another contract for this project has also been signed. Subscribe to E-News Weekly 28/2005 & 23/2005 and read E-News Weekly 4/2005. Visit www.skanska.no 28/05.Open call for tenders, deadline 5th November, 2007 for delivery of booster fans for the Bjørvika tunnels in Oslo including a 675 m-long immersed tunnel under the harbour and its ramps, 503 m of cut-and-cover tunnels and ramps totalling 1.2 km with a rectangular shape for one, two or three lanes at Sørenga, a new 420 m-long 9.5 m-wide rock tunnel in Mosseveien/Grønlia and 620 m of enlarged existing tunnels and the ramps. Read E-News Weekly 39/2007, 40/2005, 28/2005, 26/2005, 23/2005, 4/2005, 18/2002 & 10/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=223948-2007, OJ S 183, or contact Statens vegvesen Region east, Lillehammer, tel. +47 81522000 or 24058759. E-mail mari.barstad@vegvesen.no. Also visit www.vegvesen.no/bjorvika 40/07.Open call for tenders, deadline 22nd May, 2008 for fire protection of the Bjørvika tunnel in Oslo. The contract includes delivery and installation of fire protection on the roof and walls (approx. 39,400 sq m and approx. 10,850 sq m, respectively), delivery and installation of fireproof seals in structure joints (approx. 350 m of element joints in the immersed tunnel section, approx. 1,300 m of segment joints in the immersed tunnel section and approx. 3,300 m, of section joints in the cast-on-site section of the tunnel), engineering design/detailed planning of fire protection/fireproof seals as described above. Read E-News Weekly 39/2007, 40/2005, 28/2005, 26/2005, 23/2005, 4/2005, 18/2002 & 10/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=279483-2007, OJ S 229, or contact Statens vegvesen region east, Lillehammer, tel. +47 81 522000 or fax +47 24058774. E-mail kjell.furre@vegvesen.no 49/07.Vifter & Miljø received a NOK5 million contract for delivery of booster fans for the Bjørvika tunnels in Oslo including a 675 m-long immersed tunnel under the harbour and its ramps, 503 m of cut-and-cover tunnels and ramps totalling 1.2 km with a rectangular shape for one, two or three lanes at Sørenga, a new 420 m-long 9.5 m-wide rock tunnel in Mosseveien/Grønlia and 620 m of enlarged existing tunnels and the ramps. Visit www.vifter.no 12/08.Invitation to tender for delivery and installation of shaft fans and associated equipment at four ventilation towers at Bjorvika tunnels on highway E18 in Oslo. http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=268483-2008 OJ S202 Tender deadline 27.11.2008 for commencement of works on 19.01.2009 and completion by 01.11.2009. Contact e-mail kjetil.flotre@vegvesen.no tel +47 81 52 20 00. 43/08.
Open invitation to tender, deadline 11.05.2009, for delivery of 23 controllable barriers with foundations for newly established closing points in Festning, Bjorvika and Ekeberg tunnels and other associated places on E18 highway. Contract to start 08.06.2009 for completion 01.03.2011. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091065-2009Open invitation to tender, deadline 12.05.2009, for 12 LED variable information boards and road signs for Bjorvika tunnel on E18 highway. Contract to start 09.06.2009 for completion 15.02.2010. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091066-2009More information, including specs and docs for both bids, from Kjetil Flotre at Statens vegvesen in Lillehammer, tel +47 8152 2000, e-mail kjetil.flotre@vegvesen.no. 14/09.
Contract for concrete elements for fireproofing walls of concrete tunnels in the Havnelageret, Sjodelen and Sorenga areas of Bjorvika project awarded to BetongPartner AS, Teglversveien 18, Andalsnes, Norway, value EUR3,467,613 excluding VAT. Typical dimensions of the concrete elements, which are to be tiled on the side facing traffic, are 12-15 cm thickness, 3.5 m height, and 3.3 m length, and a total area of 21,200 sq m is required. See tunnelbuilder archive no/56 for project history. More from BetongPartner, tel +47 712277-40, fax -41, e-mail kontor@betong-partner.no. Further project details from Kjell Furre at Statens vegvesen in Lillehammer, tel +47 81522000, e-mail kjell.furre@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098031-2009 15/09.
Open invitation to tender, deadline 10.06.2009, for delivery and installation of pumps with associated equipment at the pumping station in the Gronlia tunnel of the E18 Bjorvika project. Contract to commence 10.07.2009 for completion 20.11.2009. Specs and docs from Kjetil Flotre at Statens vegvesen in Oslo, tel +47 81522000, e-mail kjetil.flotre@vegvesen.no to whom tenders or requests to participate should be sent. 19/09. Site inspection scheduled for 11.05.2009 at 12.00. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124622-2009. 19/09.
Open invitation to tender, deadline 24.02.2017, for the renovation of Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, the eastern part of the Opera tunnel. The VALUE Range of the contract is EUR44 - 60.49 million, excluding VAT.
For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/150443. Tenders must be sent to the Norwegian Public Roads Administration, Eastern Region, attn Kjetil Flotre, Oslo, tel +47 91139522, e-mail kjetil.flotre@vegvesen.no. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer, tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=456612-2016. Ref.n. 16/73369. 52/16.
Skanska has signed the EUR54.56 million contract for the renovation of the Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, Norway. The project consists mainly of electrical work, fire protection and improved cleaning solutions for the tunnels. In addition, new technical buildings will be built, evacuation routes will be upgraded, a new layer of asphalt will be added and all signs will be replaced. The work will begin in the summer of 2017 and will be completed before summer 2019. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer, tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://group.skanska.com/media/203108/Skanska-renovates-tunnels-in-Oslo%2c-Norway%2c-for-NOK-516M%2c-about-SEK-550M. Ref.n. 16/73369. 19/17.
Skanska Norge AS from Oslo secured the contract for the renovation of the Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, which is the eastern part of the Opera tunnel. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer, tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318393-2017. Ref.n. 16/73369. 32/17.
Competitive procedure with negotiation, deadline 04.02.2019,
for the renovation of the Festning tunnel on the E18 highway in Oslo, also the
western part of the Opera tunnel and the pump station at Bygdoylokket. The value
of the contract is EUR19.42 million, excluding VAT, and the duration of the contract
is 17 months. For bid documents and further information http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=225727&B=VEGVESEN
where offers must be sent. Contact Norwegian Public Roads Administration in
Oslo, attn Bjorn Oystein Kroken, tel +47 47272268, email bjorn.kroken@vegvesen.no.Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=004419-2019.
Ref.n. 18/222374. 02/19.
Skanska Norge AS from Oslo secured the EUR27.59 million
(NOK267.19 million) contract, excluding VAT, for the renovation of the Festning
tunnel on the E18 highway in Oslo, also the western part of the Opera tunnel
and the pump station at Bygdoylokket. Contact Norwegian Public Roads
Administration in Oslo, attn Bjorn Oystein Kroken, tel +47 47272268, email bjorn.kroken@vegvesen.no.Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285725-2019.
Ref.n. 18/222374. 26/19.