Austria: Achberg and Lärchberg road tunnels safety systems installation, B178 Loferer Strasse
Client / Awarding Authority
State of Salzburg (Land Salzburg), Salzburg, Austria
Winning Contractor(s)
Not yet awarded – open procedure tender
Project Scope
The State of Salzburg has launched an open procedure for the installation of operational and safety technical systems in two road tunnels on the B178 Loferer Strasse, an important regional road corridor in the Salzburg region connecting Austria with Germany via the Lofer area.
The contract covers the supply, installation and commissioning of tunnel operational and safety systems in the Achberg and Lärchberg tunnels. Works are expected to include integration of electromechanical and control systems required for safe tunnel operation, including power supply, monitoring and control equipment, and safety infrastructure typically associated with modern road tunnel operation.
Tender documentation and submission of bids:
https://landsalzburg.vergabeportal.at/Detail/234757
Further information:
https://ted.europa.eu/en/notice/-/detail/158895-2026, OJ S 046
Tunnel Characteristics
- Achberg Tunnel – road tunnel, 1,500 m
- Lärchberg Tunnel – road tunnel, 1,850 m
- Located on the B178 Loferer Strasse
- Works relate to installation of operational and safety technical systems
Contract Value
Not stated
Duration
10 months
Location
Salzburg region, Austria
Tender deadline
07 April 2026
Contact
State of Salzburg
Tel: +43 662 8042 4711
Fax: +43 662 8042 4160
Email: landesbaudirektion@salzburg.gv.at
Ref. No. 20608-A/222/309-2026. 10/26.