Germany, Schleswig-Holstein - de/167

Railway and Motorway

Closing Date: 09.04.2026

Tendering Authority - DB InfraGO AG
Frankfurt am Main, Germany

Procedure Type

Negotiated procedure with prior call for competition

The contract is divided into 13 lots.

Scope of Works

Provision of construction supervision services during the implementation phase of the new Fehmarnsund Crossing project.

The supervision services relate to the execution of works for:

  • An immersed tube tunnel accommodating both rail and road traffic;
  • Associated land-side infrastructure and connections on the mainland and the island of Fehmarn;
  • Road and railway alignments extending:
    • To Grossenbrode (mainland, eastern Holstein);
    • To the north of Strukkamp (island of Fehmarn).

The project forms part of Germany’s hinterland connection to the Fehmarnbelt Fixed Link between Germany and Denmark.

Tunnel Details

Project: Fehmarnsund Tunnel (Fehmarn Sound Tunnel)

  • Tunnel Type: Immersed tube tunnel
  • Function: Combined road and railway crossing
  • Length of immersed section: Approximately 1.7 km – 2.2 km
  • Overall land-side connections:
    • Road infrastructure: approximately 7.8 km
    • Railway infrastructure: approximately 6.3 km
  • Configuration:
    • Four road lanes arranged in two separate road tubes
    • Two electrified railway tracks arranged in two separate rail tubes
    • Total of four structurally independent tunnel tubes
  • Approximate cross-sectional dimensions:
    • Width: approx. 50 m
    • Height: approx. 10 m
  • Alignment: Crossing of the Fehmarnsund to the west of the existing Fehmarnsund Bridge

The existing 1963 Fehmarnsund Bridge will be retained and refurbished for pedestrian, cyclist and local traffic use but will no longer carry rail services or heavy vehicular traffic.

Contract Value

Not specified in the contract notice.

Duration

Estimated contract duration:
01 August 2026 – 31 March 2033

Project Status

  • Major design and construction contracts were signed in November 2025.
  • The tunnel is currently planned to enter service in 2032.
  • The project is jointly realised by DB InfraGO AG and DEGES.

Deadline for Submission

09 April 2026

Contact Details

DB InfraGO AG
Frankfurt am Main, Germany

Tel: +49 3613006253
Fax: +49 69260913773
Email: Dana.Tscharnke@deutschebahn.com

Official publication:
Reference: de/167 – OJ S 036 / 120792-2026 – Ref. No. 25FEI84132

TED – OJ S 036, Notice 120792-2026
Available at: https://ted.europa.eu/en/notice/-/detail/120792-2026. 09/26.