North America: United States – Hudson Tunnel Project, 10th Avenue Tunnel and A Yard (Package P2A)

Client / awarding authority
Gateway Development Commission (GDC), United States

Winning contractor(s)
Not yet awarded – Request for Qualifications (RFQ) stage

Project scope
RFQ for Package 2A (P2A): 10th Avenue Tunnel and A Yard, part of the Hudson Tunnel Project connecting New Jersey and New York as part of the Gateway Program rail corridor improvements.

The contract covers heavy civil works to connect the new Hudson River rail tunnel to the existing track network at New York Penn Station. The works extend the rail corridor beneath the Hudson Yards district and include realignment of the approach tracks in the A Yard to match the elevation and alignment of the new Hudson Tunnel.

Key elements include:

  • Construction of the 10th Avenue Tunnel using cut-and-cover methods beneath 10th Avenue in Manhattan.
  • Lowering and realignment of existing access tracks in the A Yard to integrate with the new tunnel approach.
  • Underpinning of the existing 450 West 33rd Street building, including relocation of structural columns to accommodate rail infrastructure works.
  • Construction of the structural framing for the A Yard Fan Plant, part of the tunnel ventilation system for the Hudson Tunnel.

The procurement follows a two-stage best-value process, with up to five teams shortlisted following the RFQ stage before invitation to submit detailed proposals.

Further information:
https://gatewayprogram.bonfirehub.com/portal/?tab=openOpportunities

Tunnel characteristics

  • 10th Avenue Tunnel – approximately 30 m (100 ft) long
  • Cut-and-cover railway tunnel forming part of the Hudson Tunnel Project approach structures
  • Includes integration with fan plant ventilation infrastructure and track realignment works within the A Yard rail facility

Contract value
Not stated

Duration
Notice to Proceed targeted Q1 2027 with completion expected Q4 2030

Location
Manhattan, New York, United States, connecting to the Hudson Tunnel Project corridor between New York and New Jersey

Reference: P2A. 11/26.



Permalink