Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Rogaland - no/78

Road and Motorway

The Joint Venture Implenia Norge AS/ Stangeland Maskin AS have secured the EUR524.73 million (NOK5.98 bn), excluding VAT,   for the middle part of the Boknafjord tunnel and completion of the Kvitsoy tunnel on the E39 (Contract E02). The Kvitsoy tunnel is built with one carriageway with a cross section T10. The Kvitsoy tunnel has been blasted, protected from rock, and built with a permanent superstructure, water and sewage installations in carriageway 18 in contract E15, and is to be completed in E02 with water-frost protection, equipping basins and technical buildings. The crossing between these two tunnels is designed as a rock fly-over with two roundabouts. The project will be model-based, contact Norwegian Public Roads Administration, att.n Kristine Hamre, Moss, email kristine.hamre@vegvesen.no. Visit https://kommunikasjon.ntb.no/. Ref.n. 23/19829. 22/24. 



Permalink