Road

Open call for tenders, deadline 13th July, 2006 for geological engineering for the 5.7 km Finnfast tunnel on road Rv 519 between Rennesoy and Finnoy. The tunnel will feature a Norwegian profile T8. Drilling and blasting, with rockbolting and shotcreting for support. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104202-2006, OJ S 97, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986 or 51536829. E-mail anne-merete.gilje@vegvesen.no 22/06.AF Spesialprosjekt is the low bidder for the 5,685 m Finnfast subsea tunnel on road Rv 519, with an offer of NOK536,146,709. The other bidders are: Mika (NOK538,951,117), NCC (NOK541,037,237), Skanska (NOK553,072,170), Kruse Smith (NOK605,500,066) and Veidekke (NOK607,178,331). Tunnelling will commence in August and be completed in 2009. Visit www.afgruppen.no 24/06.It is NCC Construction that has finally signed a contract with the Norwegian Public Roads Administration for construction on the Finnfast project. The order value is about SEK570 million and includes a subsea tunnel between the islands of Rennesoy and Finnoy on road Rv 519 and a connecting tunnel to the island of Talgje. The project consists primarily of construction of a 5,684 m tunnel under the ocean between Hanasand on Rennesoy and Ladstein on Finnoy. A connecting tunnel of 1,500 m will also be built to the island of Telgje, also in Finnoy municipality. In addition, new roadways will be built, including a traffic roundabout at Hanasand and roads in Ladstein and on Talgje. Civil engineering work will begin in August. Through the project, the islands of Finnoy and Talgje in the county of Ryfylke will gain a permanent road connection to Stavanger on the mainland before the end of 2009. Visit www.ncc.info 31-32/06.Open call for tenders, deadline 13th November, 2006 for geological engineering consultancy for the construction management in connection with the Finnfast tunnel. It is a 5.7 km-long tunnel with a 1.5 km-long section to Talgje. The tunnel is located approx. 30 km north of Stavanger. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200646-2006, OJ S 189, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986. E-mail anne-merete.gilje@vegvesen.no 41/06.



Permalink