Russia

Russia, Moscow - ru/22

Highway

  2 x 1,505 m Silver forest tunnel under construction in Moscow by Mosmetrostroy using the Herrenknecht TBM previously used for the Lefortovo tunnel. It is a 2,600 t, 63 m-long mixshield, outer diameter 14.2 m, total installed main drive power of 3,200 kW + 315 kW for central cutter wheel, total installed power of 5,196 kVA and maximum thrust force of 120,000 kN. Geology is sand (nearly 600 m), then shifting to clay with inclusions of limestone and rocks up to 1 m. Concrete lining rings consisting of eight segments plus key, each ring is 2,000 m in width. Separation plant and slurry pipes by MS of France. Length of tunnel already excavated to date is 1,238 m with expected breakthrough date on first tunnel scheduled for 15th March. Visit www.herrenknecht.com, www.m-s.fr and www.metrostroy.ru 07/05.



Permalink

Russia, Omsk - ru/20

Gas Pipeline

Mostovik will bore 2.1 km-long x 2.67 m-diameter tube to contain Blue Stream pipeline to Black Sea coast in mixed ground comprising 170 Mpa sandstone of UCS 140, marl, gravel conglomerate, and soft argillites using new Lovat RMP105SE with arm type erector. Segments 1 m long x 200 mm thick with outer diameter of 2.54 m. Delivery this month for start early-2001. Visit www.lovat.com December 2000.



Permalink

Russia, Cheliabinsk - ru/19

Metro

Plans for first metro include 6 km of deep, 5.5 m-diameter twin-tube running tunnels and nine underground stations. Alignment is from the north-west of the city, through the historic centre, to the eastern districts. The line will pass deep below the water table through heterogenous formations of porphyrites and across a 1.25 km-long fault with unconsolidated, fractured rock with forecast water flows of 2,000 cu m/h. Pregrouting has been carried out from surface over the faulted area under the direction of the Urals State Mining Academy, details from Professor Lushnikova, fax +7 3432 519533. The tunnelling operation is awaiting federal funding. April 2000.



Permalink

Russia, Moscow - ru/18

Lefortovo Motorway

  3.2 km three-lane motorway tunnel to be constructed using 14.2 m-diameter Herrenknecht Mixshield from recently-completed fourth Elbe tunnel in Germany. More from www.herrenknecht.com March 2000. Ceresola has stripped and refurbished the Elbetunnel concrete segment production line and installed it for Transstroy Corporation at its Leforto motorway site. Rings of 13.75 m o.d. erected by Herrenknecht EPB will comprise 8+1 segments of thickness 700 mm, length 2 m, and with maximum weight 18t. Visit www.ceresola.com and www.herrenknecht.com Sept 2000.  



Permalink

Russia, Kazan - ru/17

Metro

  Lovat 5.63 m-diameter EPB will be used to construct 11 km of twin-tube metro in silt, loam, clay and sand at depths to 28 m and water pressures of up to 1.9 bar. Precast concrete lining comprises seven segments and key with inner diameter 5.1 m and ring width of 1 m. November 1999.Kazmetrostroy, in charge of building Kazan's metro, has ordered a second hand TBM from NFM Technologies. This machine will work with the first TBM already at work under the city, to bore a twin-tube tunnel as part of the first metro line. Kazan, capital of the Tatarstan province and located 800 km east of Moscow, is the eleventh city in Russia to build a metro. The network will be 42.4 km-long with three lines to be completed around 2025. The city of Kazan intends to inaugurate part of the first line for its century celebration in 2005.The EPB TBM from NFM Technologies will bore 1,790 m creating the bi-tube tunnel of the first metro line already under construction. The soil is mostly composed of sand and clay with a ground pressure less than 3 bar.In its plant in Le Creusot, France NFM Technologies is modifying one of the two EPB TBMs with foam injection previously used to bore the Copenhagen metro. The machine will be adapted to the working conditions of Kazan's project. This EPB was first built by NFM Technologies. The machine will be equipped with a new cutterhead with a diameter of 5.89 m. The first cutterhead was 5.71 m in diameter. The machine weighs about 650 tonnes. Visit www.nfm-technologies.com 44/03.A refurbished 5.89 m-diameter Lovat TBM RME232SE Series 14600, which recently completed the mini metro project in Moscow, is now boring 1,896 m of tunnel on the first line between Sukonnaya Sloboda and Ametievo stations. Her sister, a Lovat TBM RME226SE Series 17500, is driving a parallel tunnel. Visit www.lovat.com 22/04.



Permalink

Russia, Sakhalin - ru/16

Heavy Rail

Government indicated support for subsea tunnel to link island’s oil industry and ice-free ports into the trans-Siberian railway. Feasibility study underway to be presented in mid-2001. Sept 1999.  



Permalink

Russia, Nizhny Novgorod - ru/15

Metro



Permalink

Russia, Yekaterinburg - ru/14

Metro



Permalink

Russia, Moscow - ru/13

Heavy Metro

 



Permalink

Russia, St Petersburg - ru/12

Metro



Permalink