Open invitation to tender, deadline 27/10/2025, for the design and rehabilitation works of the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of the East/East-Mediterranean corridor, Lot 3 Igiroasa (Cap Y) – Drobeta Turnu Severin (Cap X), km 331 +000- km 362+632. The lot includes the new twin-tube Balota tunnel, length 6189 m to be built by TBM. Click here for the tender documents. Value of the contract will be EUR1.21 billion (RON6.15 bn), excluding VAT. Duration of contract is 135 months. Contact Compania Nationala de Cai Ferate CFR SA, attn Sonia Neacsu, Bucarest, tel +40 372843221, fax +40 213192401, email sonia.neacsu@cfr.ro. Visit the European Tenders website by clicking here, here and here