Ic Ictas Insaat SanayI Ve Ticaret AS (Istanbul, leader) and Rotary Constructii Mentenanta (Bucarest) secured the EUR 454.91 million (RON2.31 bn) contract, excluding VAT, for the design and rehabilitation works for Lot 4 Drobeta Turnu Severin (Cap X) - Cap X Baile Herculane, km 362+632 -km 404+250, of the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of theOrient/East-Mediterranean corridor. The contract includes the following 7 tunnels Motu (150m), Baba (83 m), Vir (93 m), Virciorova (92 m), Bahna (115 m), Alion (199 m) and Tufari (399 m) to be modernizated. Contact Compania Nationala de Cai Ferate CFR SA, attn Mariana Ilie, Bucarest, tel +40 372843233, fax +40 213192401, email iulian.stanescu@cfr.ro. Visit https://ted.europa.eu/en/notice/-/detail/411164-2025. Ref.n. 17.A/1/608/20.05.2024. 26/25.