Porr Construct Srl from Bucarest secured the EUR422,15 million (RON2.14 bn), excluding VAT, for the design and rehabilitation works for Lot 5 of the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of theOrient/East-Mediterranean corridor. The Lot 5, Cap X Baile Herculane - Cap X Po Nou Poarta, km 404+250- km 436+887, includes the Rachitoberg tunnel (496 m) to be modernizated and the new cut&cover Poarta I tunnel (1279 m). Contact Compania Nationala de Cai Ferate CFR SA, attn Mariana Ilie, Bucarest, tel +40 372843233, fax +40 213192401, email iulian.stanescu@cfr.ro. Visit https://ted.europa.eu/en/notice/-/detail/564118-2025. Ref.n. 17.A/1/608/20.05.2024. 35/25.