Open invitation to tender, deadline 14/10/2024, for the design and rehabilitation works for Lot 4 and Lot 5 of the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of theOrient/East-Mediterranean corridor. Value of contract EUR1.17bn (RON5.80 bn), excluding VAT.
- Lot 4, Drobeta Turnu Severin (Cap X) - Cap X Baile Herculane, km 362+632 -km 404+250, including the following 7 tunnels Motu (150m), Baba (83 m), Vir (93 m), Virciorova (92 m), Bahna (115 m), Alion (199 m) and Tufari (399 m) to be modernizated. Duration of contract 135 months.
- Lot 5, Cap X Baile Herculane - Cap X Po Nou Poarta, km 404+250- km 436+887, including the Rachitoberg tunnel (496 m) to be modernizated and the new cut&cover Poarta I tunnel (1279 m). Duration of contract 123 months.
Romania
Oltenia & Banat - ro/24
Railway
Closing date: 30/09/2024
Open invitation to tender, deadline 30/09/2024, for the design and rehabilitation works for the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of the Orient/East-Mediterranean Corridor,
Lot 6 Cap X Po Nou Poarta - Caransebes, km 436 +887- km 474+046,53. The lot includes the 2 new cut&cover tunnels Poarta II (550 m) and Poarta III (305 m) and the refurbishment of the Fenes (271 m) and Tampa (268 m) tunnels. Click here
https://e-licitatie.ro/pub/notices/c-notice/v2/view/100180348 for the tender documents. Value of the contract is EUR528.29 million (RON2.63bn), excluding VAT. Duration of the contract will be 135 months. Contact Compania Nationala de Cai Ferate CFR SA, attn Oana Otilia Mandras, Bucarest, tel +40 91122148, fax +40 213192401, email Oana.Mandras@cfr.ro. Visit https://ted.europa.eu/en/notice/-/detail/533680-2024, https://ted.europa.eu/en/notice/-/detail/501353-2024, https://ted.europa.eu/en/notice/-/detail/492672-2024, https://ted.europa.eu/en/notice/-/detail/451701-2024, https://ted.europa.eu/en/notice/-/detail/444469-2024, https://ted.europa.eu/en/notice/-/detail/419069-2024, https://ted.europa.eu/en/notice/-/detail/415032-2024, https://ted.europa.eu/en/notice/-/detail/397596-2024, https://ted.europa.eu/en/notice/-/detail/368874-2024, https://ted.europa.eu/en/notice/-/detail/361656-2024 and https://ted.europa.eu/en/notice/-/detail/306807-2024. Ref.n. 17.A/1/613/20.05.2024. 36/24.
Romania
Oltenia & Banat - ro/24
Railway
Closing Date: 16/09/2024
Open invitation to tender, deadline 16/09/2024, for the design and rehabilitation works of the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of the Orient/East-Mediterranean corridor,
Lot 3 Igiroasa (Cap Y) – Drobeta Turnu Severin (Cap X), km 331 +000- km 362+632. The lot includes the new twin-tube Balota tunnel, length 6189 m to be built by TBM. Click here
https://e-licitatie.ro/pub/notices/c-notice/v2/view/100180342 for the tender documents. Value of the contract will be EUR1.24 bn (RON6.15bn), excluding VAT. Duration of contract is 135 months. Contact Compania Nationala de Cai Ferate CFR SA, attn Sonia Neacsu, Bucarest, tel +40 372843221, fax +40 213192401, email sonia.neacsu@cfr.ro. Visit https://ted.europa.eu/en/notice/-/detail/501517-2024, https://ted.europa.eu/en/notice/-/detail/493065-2024, https://ted.europa.eu/en/notice/-/detail/451153-2024, https://ted.europa.eu/en/notice/-/detail/444732-2024, https://ted.europa.eu/en/notice/-/detail/410842-2024, https://ted.europa.eu/en/notice/-/detail/407139-2024, https://ted.europa.eu/en/notice/-/detail/360829-2024 and https://ted.europa.eu/en/notice/-/detail/307100-2024. Ref.n. 17.A/1/617/20.05.2024. 34/24