Postponed to 03/11/2025 the deadline of the open invitation to tender for the design and rehabilitation works of the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of the East/East-Mediterranean corridor, Lot 3 Igiroasa (Cap Y) – Drobeta Turnu Severin (Cap X), km 331 +000- km 362+632. The lot includes the new twin-tube Balota tunnel, length 6189 m to be built by TBM. Click here for the tender documents. Value of the contract will be EUR1.21 billion (RON6.15 bn), excluding VAT. Duration of contract is 135 months. Contact Compania Nationala de Cai Ferate CFR SA, attn Sonia Neacsu, Bucarest, tel +40 372843221, fax +40 213192401, email sonia.neacsu@cfr.ro. Visit https://ted.europa.eu/en/notice/-/detail/713027-2025 and https://ted.europa.eu/en/notice/-/detail/689257-2025 . Ref.n. 17/2/1511/03.07.2025. 44/25.