Open invitation to tender, deadline 03/07/2023, for the design and rehabilitation works for Lot 4 and Lot 5 of the Craiova-Drobeta Turnu Severin-Caransebeș railway, part of the East/East-Mediterranean corridor.
- Lot 4, Drobeta Turnu Severin (Cap X) - Cap X Baile Herculane, km 362+632 -km 404+250, including the following 7 tunnels Motu (150m), Baba (83 m), Vir (93 m), Virciorova (92 m), Bahna (115 m), Alion (199 m) and Tufari (399 m) to be modernizated. Value of contract EUR323.15 million (RON1.61 bn), excluding VAT. Duration of contract 135 months.
- Lot 5, Cap X Baile Herculane - Cap X Po Nou Poarta, km 404+250- km 436+887, including the Rachitoberg tunnel (496 m) to be modernizated and the new cut&cover Poarta I tunnel (1279 m). Value of contract EUR321.26 million (RON1.60 bn), excluding VAT. Duration of contract 123 months.
Click here for tender documents. Contact Compania Nationala de Cai Ferate CFR SA, attn Mariana Ilie, Bucarest, tel +40 372843255, fax +40 213192401, email mariana.i.ilie@cfr.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 308027-2023. Ref.n. 17.A/1/671/26.04.2023. 22/23.