Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Bolivia

Bolivia, Misicuni - bo/11

Water/Irrigation/Hydro - Hardrock TBM

  Astaldi of Italy and ICE of Bolivia using Robbins TBM in hard, faulted, abrasive sandstone of 40-125 MPA. March 1999. A state of emergency was declared in Bolivia following protests about the expected rise in water charges that will accompany the $200 million Misicuni waterworks contract in Cochabamba. The centrepiece of the project is a very difficult 19 km-long diversion tunnel, which was commenced in 1995. TBM operations in the Calio sector got underway in November, 1998 and less than 500 m has been accomplished to date due to cataclastic rocks associated with a 700 m-wide fault system under 800 m cover. The plasticity of the strata causes a squeezing of 10-12 cm immediately behind the TBM which, if not supported before the crown opens, results in cave-in. Advance in April at Calio was 85 m, the highest achieved to date and in the Bocatoma sector the Robbins TBM has completed 2.5 km. Type in Misicuni at www.alltheweb.com for further details. May 2000. Contract extension granted to Astaldi to complete excavation until 30th April, 2002 of the 19.5 km Misicuni water tunnel in Cochabamba and install the lining by 11th March, 2003. Contractor ICE withdrew from the contract. Early September, 2001, 8.4 km had been bored between the intermediate shaft and the Bocatoma portal, as well as 6.1 km between the intermediate shaft and Ventana Calio with 4 km still to go on the latter section. Bolivia's government accepted in September, 2001 a proposal by US consultant Glenn Genkins to separate the US$62 million construction of the Misicuni tunnel from other assignments. 46/01. Supreme Decree issued by the government of Bolivia on 25th February, 2002 allowing Empresa Misicuni to negotiate a contract with another contractor to finish the last 500 m of the 19.3 km-long Misicuni tunnel. Contract with Astaldi-ICE jv was cancelled after the jv stopped work in January. The project, first proposed nearly 50 years ago, has been underway since 1995 after extensive engineering studies by Electrowatt Engineering in the 1980s. Tunnelling started in 1998 and the Bocatoma section of the tunnel was completed in May, 2000 when the Robbins hard rock TBM reached the intermediate shaft. This shaft, at over 3,800 m elevation, is one of the highest in the world. The Robbins TBM at Calio achieved advances exceeding 840 m/month, 240 m/week, 55 m/day and 30 m/shift. Antony Ivan Smith is presently the Superintendente of the 12 km-long Calio section of the Misicuni tunnel. More from aivansmith@msn.com. 12/02. Empresa Misicuni signed on 19th March a contract with Robbins to complete the last 500 metres for $680,000 saying Robbins has the know-how to finish the tunnel under the same terms as the Astaldi-ICE jv, which pulled out from the project. Robbins equipment was used by the jv. Tunnelling is to resume by the end of March. Time frame of 45 days. Court arbitration will be given in Paris to sort out the dispute between the jv and Empresa Misicuni. Visit www.robbinstbm.com 13/02.The 19.2 km-long Misicuni tunnel was completed on Thursday 4th July, 2002 when the Robbins TBM 1015-271 finally bored into the Pozo section of the tunnel, which had been found flooded at original breakthrough on 15th June, 2002. Water is now flowing through the 5 km-high Cordilleran Andes to the Cochabamba Valley, realizing a 45 year dream. After the removal of the TBM, the Calio section of the tunnel will be concreted. For further information contact Antony Ivan Smith aivansmith@msn.com or visit www.robbinstbm.com 29/02.



Permalink

Bosnia and Herzegovina

Bosnia and Herzegovina, Erzegovina-Neretva - ba/19

Road

Prior information notice without call for competition for the construction of the priority motorway sections along the Corridor Vc - Ovcari - Tunnel Prenj - Mostar North. The proposed project, which has a total estimated cost of 540,000,000.00 EUR, will require the procurement of:

Construction of the following motorway section:

• Section Tunnel Prenj (length = 12,4 km) • Ovcari - Prenj (to be defined) • Section Prenj - Mostar North (to be defined)

Consultancy services for the following activities:

• Supervision and technical assistance of the section Tunnel Prenj (length = 12,4 km) • Supervision of the section Ovcari - Prenj (to be defined) • Supervision of the section Prenj - Mostar North (to be defined).

Tendering for the Tunnel Prenj Section is expected to begin in the first half of 2020. Tendering for the above contracts is expected to begin on 31/03/2020.

Interested suppliers, contractors and consultants are invited to attend the Road Show at 12:00 hrs on 16 January 2020 at PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, Sarajevo.  Attendance at the Road Show should be confirmed at Mrs. Lejla Hodzic and Mr. Tarik Durakovic, PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, Sarajevo, tel +387 (0) 33 277 922 and +387 (0) 33 277 966, emai h.lejla@jpautoceste.ba. For tender information please click here and here. Ref.n. 51700-GPN-noTeRef. 03/20.



Permalink


Open invitation to tender, deadline 24/05/2021, for the Geological and Geotechnical Investigation work and preparation of Geotechnical Design (Mission G21) to be prepared for the 12,4 km Prenj tunnel exit (22+1) - Interchange Mostar north (34+5) subsection of the Mediterranean Corridor, Bosnia and Herzegovina - Croatia CVc Road Interconnection. This subsection includes the following major structures:  Tunnel 4 (860/800 m), Tunnel 5 (2290/2210 m), Bridge 8 (230/360 m),  Bridge 9 (320/330 m) and Bridge 10 (380/430 m).  For procurement documents, click here.  The value of the contract is EUR380,000, excluding VAT. Duration of the contract is 8 months. For additional information contact COWI IPF, att Gordana Opalic, Belgrade, email office@wbif-ipf8.eu, where tenders must be sent. For further on TED tender, please click here. Ref.n. 1192/21/GO. 15/21. 

 




Permalink


Open invitation to tender, deadline 11/06/2021, for the geotechnical Investigations and Preparation of Geotechnical Design (Mission G21 including Mission G1),  Mediterranean Corridor CVc, Konjic (Ovcari) (0+000) - Entrance to Tunnel Prenj (11+950) is Total Length 11,95 km, including the following major structures : Tunnel 1 (2200/2150m), Tunnel 2: 437/325m; Bridge 1 (250/217m), Bridge 2 (484/480m), Bridge 3 (557/657m), Bridge 4 (55/55m), Bridge 5 ( 130/186 m), Bridge 6 (367/410 m), Bridge 7 (55/55m).  For procurement documents, click here.  Value of the contract is EUR330,000, excluding VAT. Duration of the contract is 8 months. For additional information contact COWI IPF, att Gordana Opalic, Belgrade, email office@wbif-ipf8.eu, where tenders must be sent. For further on TED tender, please click here. Ref.n. 1201/2021/GO. 18/21. 

 




Permalink


The Consortium Integra d.o.o. Mostar (Leader) from Mostar,  IGH d.o.o. (from Mostar),  Geocon d.o.o. Citluk from Citluk secured the EUR 377,979 contract, excluding VAT,  for the Geological and Geotechnical Investigation work and preparation of Geotechnical Design (Mission G21) to be prepared for 12,4 km Prenj tunnel exit (22+1) - Interchange Mostar north (34+5) subsection of the Mediterranean Corridor, Bosnia and Herzegovina - Croatia CVc Road Interconnection. This subsection includes the following major structures:  Tunnel 4 (860/800 m), Tunnel 5 (2290/2210 m), Bridge 8 (230/360 m),  Bridge 9 (320/330 m) and Bridge 10 (380/430 m). Contact WBIF (Western Balkans Investment Framework ) Infrastructure Project Facility – Technical Assistance 8 (IPF 8)’ consortium, represented by COWI A/S at Kongens Lyngby (DK), attn  Claus Hvashoj Jorgensen, email chj@cowi.com. For further on TED tender, please click here. Ref.n. 1192/21/GO. 30/21. 

 




Permalink


Restricted procedure, deadline 17/02/2022, for the consultancy services for development of Preliminary Design with elements of Detailed Design for the works contract for Tunnel Prenj and tender documents). For tender documents click here, where tenders must be sent. Value of the contract is EUR 6million, excluding VAT. Duration of the contract is 6 months. Contact  Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn  Mrs. Jasmina Olovcic,  Sarajevo, tel +387 (0) 33 277 921. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=005357-2022. Ref.n. JPAC-1347-E-712/21. 02/22. 

 




Permalink

Restricted procedure, deadline 05/09/2022, for design and construction of a motorway on Corridor Vc, Section Ovcari - tunnel Prenj - Mostar North, 11 km subsection tunnel Prenj. The twin-tube motorway tunnel will be with two lanes in each tube (separated tunnel tubes with pedestrian and vehicular cross connections). For tender documents click here, where tenders must be sent . Value of the contract is EUR400 million, excluding VAT. Duration of contract 72 months. Contact  Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn  Mrs. Jasmina Olovcic,  Sarajevo, tel +387 (0) 33 277 921. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=387814-2022. Ref.n. EIB-GtP/MOB 20180271-01. 29/22.    



Permalink


Restricted procedure, deadline 22/08/2022, for PIU (Project Implementation Unit ) support and E&S (Environmental & Social) monitoring consultant contract including procurement support for the procurement of tunnel and supervision works for the tunnel Prenj. For tender documents click here, where tenders must be sent. Value of the contract is EUR 4.5 million, excluding VAT. Duration of contract 96 months. Contact  Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn  Mrs. Jasmina Olovcic,  Sarajevo, tel +387 (0) 33 277 921. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=410974-2022. Ref.n. EIB-GtP/MOB/JPAC 1430-E-769/22. 30/22. 




Permalink


The Joint Venture Elea iC d.o.o (Ljubljana), iC Consulenten ZT GmbH (Vienna), SEED Consulting Shpk (Tirana) and IBE d.d. (Ljubljana) secured the EUR 5,934,530.80  contract, excluding VAT,  for Consultancy services for development of Preliminary Design with elements of Detailed Design for the works contract for Tunnel Prenj. Contact  Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn  Mrs Jasmina Olovčić,  Sarajevo, tel +387 33277921, fax +387 33277901, email o.jasmina@jpautoceste.ba. Visit https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=24602414. Ref.n. JPAC-1347-E-712/21. 02/23. 



Permalink

Bosnia and Herzegovina, Canton Zenica-Doboj - ba/18

Motorway

Euro-Asfalt from Sarajevo (BA) secured the EUR59.41 million contract, excluding VAT, for construction of a motorway on Corridor Vc, Section Poprikuse - Zenica North (Donja Gracanica), Subsection Ponirak – Vraca, length 2.65 km, including the Zenica tunnel (left tube 2475m, right tube 2420 m). Contact Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Ms Jasmina Olovcic, Sarajevo, tel +387 33 277 958, fax +387 33 277 901-942, emailo.jasmina@jpautoceste.ba. Click here for more. Ref.n. JPAC 851-B83-17. 32/19.



Permalink

Prior information notice without call for competition, deadline 29/07/2020, for a project comprising construction of the motorway on Corridor Vc between bridge Rudanka and tunnel Putnikovo Brdo 2 and between tunnel Putnikovo Brdo 2 - Medakovo - Doboj Bypass.

The proposed project, whose total estimated cost is EUR210 million, will require the procurement of:

             construction of 5,6 km of new Motorway including twin tube Putnikovo Brdo 1 (1,595 m long) and Putnikovo Brdo 2 (700 m long, 150 m of which in FBiH) tunnels, 326 m bridge Rudanka over Bosna River and related local roads. This section includes the last 150 m of the tunnel that are located within the FBH. This works contract will be procured by the RS motorways, through EBRD website;

             consulting services for works supervision; this works contract will be procured by the RS motorways, through EBRD website;

             construction of the southern part of the Doboj Bypass between tunnel Putnikovo brdo 2 and Medakovo Interchange. This 8 km long section includes also a bridge over River Usora and Interchange Karuse/Usora. This works contract will be procured by the FBiH Motorways through ECEPP;

             consulting services for works supervision; this supervision contract will be procured by the FBiH Motorways through ECEPP;

             procurement of fuel control equipment for random testing of fuel used in heavy trucks to prevent usage of light fuel oil and blue diesel;

             consultancy services for development and implementation of asset and inventory management systems in FBH motorways and RS motorways;

 

Tendering for the above contracts to be procured by the RS motorways is expected to begin in the third quarter of 2019.

Tendering for the above contracts to be procured by the FBiH motorways is expected to begin in the first quarter of 2020.

In relation to those contracts to be procured by the FBiH Motorways, a replication of the present General Procurement Notice will be published at the EBRD Client eprocurement portal (ECEPP) in the following link:

Interested suppliers, contractors and consultants should contact:

For the Section Rudanka Interchange and the south end of the tunnel Putnikovo Brdo: Public Company Republic of Srpska Motorways, attn  Eng Davor Vuckovic, Banja Luka, Republic of Srpska, Bosnia and Herzegovina, tel +387 51 233 670, fax +387 51 233 700, email dvuckovic@autoputevirs.com, info@autoputevirs.com.

 

For the section between the tunnel Putnikovo Brdo 2 and Medakovo

Interchange: Public Company , attn Sanela Kosovac a No 20, 88000 Mostar, Bosnia and Herzegovina, Tel. +387 33 277 921; +387 33 277 966, Fax +387 33 277 901;

+387 33 277 942, Email: k.sanela@jpautoceste.ba and

+d.tarik@jpautoceste.ba

 

Visit TED for more information. Ref.n. 9479-GPN-50603. 32/19. 32/19.



Permalink

Open invitation to tender, deadline 13/02/2020, for supervision of Design and Construction Works of Motorway on Corridor Vc through Republic of Srpska – Doboj Bypass, Section Bridge Rudanka (including the Bridge) — tunnel Putnikovo Brdo 2. The expected outcome of the Assignment is engaging consultants to assist in works supervision for the design and construction of 5,6 km of new motorway including all related local roads and following major structures:  dual tube tunnel  Putnikovo Brdo 1 (1,6 km), dual tube tunnel Putnikovo Brdo 2 (700 m), bridge Rudanka over river Bosna and viaduct Putnikovo Brdo. The Assignment is expected to start on July 2020 and has an estimated overall duration of 36 months plus 24 months of DNP. Value contract EUR6 million, excluding VAT. Contact Republic of Srpska Motorways’ Ltd, attn Mr. Davor Vuckovic, tel  00387 51233670, email dvuckovic@autoputevirs.cominfo@autoputevirs.com.  For tender documents please click here .



Permalink

Open invitation to tender, deadline 04/05/2020, for the Design and Construction Works of  Doboj Bypass: Section Bridge Rudanka (including the Bridge) - Tunnel Putnikovo Brdo 2. The contract involves  5.6km of new Motorway including all related local roads and the twin tube  Putnikovo Brdo 1 (1,6 km) and Putnikovo Brdo 2 (700 m) tunnels, the bridge Rudanka over river Bosna, the viaduct Putnikovo Brdo. Expected duration of the contract is 1095 days (3 years) plus defect notification period of 730 days (2 years). A 2-stage tendering procedure will be adopted for the procurement.

Contact Republic of Srpska Motorways’ Ltd, attn Mr. Davor Vuckovic, Banja Luka, tel  +387 51 233 670, fax +387 51 233 700, email dvuckovic@autoputevirs.cominfo@autoputevirs.com.  For further tender information please click here. Ref.n. 9579-IFT-50603. 09/20.



Permalink

Prior information notice without call for competition, deadline 14/04/2021, for a project comprising construction of the motorway on Corridor Vc between the bridge Rudanka and the tunnel Putnikovo Brdo 2 and also between tunnel Putnikovo Brdo 2 - Medakovo - Doboj Bypass.

The proposed project, whose total estimated cost is EUR210 million, will require the procurement of:

•  construction of 5.6 km of new Motorway including twin tunnels Putnikovo Brdo 1 (1,595 m long) and Putnikovo Brdo 2 (700 m long, 150 m of which in FBiH) tunnels, 326 m bridge Rudanka over Bosna River and related local roads. This section includes the last 150 m of the tunnel that are located within the FBH. This works contract will be procured by the RS motorways, through EBRD-Client eProcurement Portal (ECEPP);

•  consulting services for works supervision; this works contract will be procured by the RS motorways, through ECEPP;

•   construction of the southern part of the Doboj Bypass between the tunnel Putnikovo brdo 2 and the Medakovo Interchange. This 8 km long section includes a bridge over the River Usora and Interchange Karuse/Usora. This works contract will be procured by the FBiH Motorways through ECEPP;

•   consulting services for works supervision; this supervision contract will be procured by the FBiH Motorways through ECEPP;

•   procurement of fuel control equipment for random testing of fuel used in heavy trucks to prevent usage of light fuel oil and blue diesel;

•   consultancy services for development and implementation of asset and inventory management systems in FBH motorways and RS motorways.

Reference to the general procurement notice issued on 30 July 2019 at www.ebrd.com/work-with-us/procurement/p-pn-190730b.html.

Tendering for the above contracts to be procured and implemented by the RS motorways are expected to begin in the second quarter of 2020 and being them switched from paper-based tender to ECEPP. You will find more information at https://ecepp.ebrd.com/

Tendering for the above contracts to be procured and implemented by the FBiH motorways are expected to begin in the fourth quarter of 2020.

In relation to those contracts to be procured by the FBiH Motorways, a replication of the present General Procurement Notice will be published at the EBRD Client eprocurement portal (ECEPP) in the following link click here

Interested suppliers, contractors and consultants should contact - For the Section Rudanka Interchange and the south end of the tunnel Putnikovo Brdo: Public Company Republic of Srpska Motorways, attn  Eng Davor Vuckovic, Banja Luka, Republic of Srpska, Bosnia and Herzegovina, tel +387 51 233 670, fax +387 51 233 700, email dvuckovic@autoputevirs.com, info@autoputevirs.com.
For the section between the tunnel Putnikovo Brdo 2 and Medakovo Interchange- Public Company , attn Sanela Kosovac and Tarik Durakovic, Mostar, Bosnia and Herzegovina, tel +387 33 277 921, +387 33 277 966, fax +387 33 277 901, +387 33 277 942, email k.sanela@jpautoceste.ba and d.tarik@jpautoceste.ba. For further tender information please click here. Ref.n. 9479-GPN-50603. 17/20.



Permalink


Integral Inzenjering from Laktasi secured the EUR 93.72 million contract for the design and construction of the Doboj Bypass, section Bridge Rudanka (included) - Tunnel Putnikovo Brdo 2. The contract involves 5.6km of new motorway including all related local roads and the twin tube  Putnikovo Brdo 1 (1.6 km) and Putnikovo Brdo 2 (700 m) tunnels, the bridge Rudanka over river Bosna, the viaduct Putnikovo Brdo. Contact Republic of Srpska Motorways’ Ltd, attn Mr. Davor Vuckovic, Banja Luka, tel  +387 51 233 670, fax +387 51 233 700, email dvuckovic@autoputevirs.cominfo@autoputevirs.com.  Visit https://ecepp.ebrd.com/ and https://autoputevirs.com/. 26/21 

 




Permalink


IRD Engineering S.r.l. from Rome secured the EUR 4.5 million contract for supervision services during the design and construction of the new 5.6 km motorway Doboj Bypass, Section Bridge Rudanka (including the Bridge) - tunnel Putnikovo Brdo 2. Contact Republic of Srpska Motorways’ Ltd, attn Mr. Davor Vuckovic, tel  00387 51233670, email dvuckovic@autoputevirs.cominfo@autoputevirs.com.  Visit https://ecepp.ebrd.com/ and  https://irdeng.com/. 26/21. 




Permalink


Prior information notice for: 

  • works on construction of motorway on Corridor Vc, Medakovo-Ozimice and Ozimice-Poprikuse subsections;  
  • consultancy services for supervision of the works for construction of motorway on Corridor Vc, Medakovo-Ozimice and Ozimice-Poprikuse subsections; 
  • consultancy services for technical assistance to the Project implementation Unit (PIU) of PC Motorways of the Federation of Bosnia and Herzegovina for construction of motorway on Corridor Vc, section Poprikuse-Medakovo, 34.5 km long. 

The Medakovo - Ozimica section will include the 2.2 km long tunnel Crni Vrh. The Ozimica - Poprikuse section will include five tunnels with aggregate length of about 2.7 km. Estimated date of publication of contract notice: 17/05/2021. Value of contract EUR342.5 million, excluding VAT. Contact Public Company Motorways (PC) of the Federation of Bosnia and Herzegovina Ltd, attn Sanela Kosovac, Mostar, tel +38 733277921, fax +38 733277901, email k.sanela@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=174124-2021. Ref.n. EIB-GtP/2019075. 26/21. 



Permalink


Rescrited invitation to tender, deadline 14/04/2022, for consultancy services for supervision of works on Construction of Motorway on Corridor Vc, section Medakovo - Ozimice, including a 2200 m tunnel. Value of contract EUR4.4 million, excluding VAT. Duration contract 53 months. Contact Public Company (PC) Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Jasmina Olovcic, Sarajevo, tel +38 733277921, fax +38 733277901, email o.jasmina@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=107829-2022. Ref.n. EIB-GtP/MOB 20190751-05. 09/22. 



Permalink


Open invitation to tender, deadline 09/08/2023, for the construction of the 21.3 km long section of Motorway between Medakovo and Ozimice on Corridor Vc. The works include one interchange, two two-sided rest areas, eight bridges and viaducts, two overpasses, fifteen underpasses and one tunnel 2200 m long. Value of contract EUR160 million, excluding VAT. Duration contract 30 months. Contact Public Company (PC) Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Jasmina Olovcic, Sarajevo, tel +38 733277921, fax +38 733277901, email o.jasmina@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422304-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=317060-2022. Ref.n. EIB-GtP/MOB 20190751-03. 31/22. 

Bosnia and Herzegovina-Sarajevo: Motorway construction works

2022/S 148-422304

Corrigendum

Notice for changes or additional information

Works

(Supplement to the Official Journal of the European Union, 2022/S 113-317060)

Legal Basis:
Regulation (EU, Euratom) No 2018/1046

This contract will be financed by European Investment Bank (EIB) and is subject to the EIB's Guide to Procurement.”

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar
Postal address: Hamdije Kreševljakovića 19
Town: Sarajevo
NUTS code: BA Bosnia And Herzegovina
Postal code: 71 000
Country: Bosnia and Herzegovina
Contact person: Jasmina Olovčić
E-mail: o.jasmina@jpautoceste.ba
Telephone: +387 33277921
Fax: +387 33277901
Internet address(es):
Main address: https://www.jpautoceste.ba/

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Construction of Motorway on Corridor Vc, Section Medakovo – Poprikuše, Subsection Medakovo – Ozimice

Reference number: EIB-GtP/MOB 20190751-03
II.1.2)Main CPV code
45233110 Motorway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:

The subject of this Contract is construction of 21.3 km long section of Motorway on Corridor Vc between Medakovo and Ozimice. The works include one interchange, two two-sided rest areas, eight bridges and viaducts, two overpasses, fifteen (15) underpasses and one tunnel 2200 m long.

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
29/07/2022
VI.6)Original notice reference
Notice number in the OJ S: 2022/S 113-317060

Section VII: Changes

VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.7
Instead of:
Date: 09/08/2022
Local time: 11:30
Read:
Date: 16/08/2022
Local time: 11:30
VII.2)Other additional information:



Permalink


The Joint Venture Yuksel Proje from Ankara/Trasa d.o.o. from Sarajevo secured the EUR4.56 million contract, excluding VAT, for consultancy services for supervision of works on Construction of Motorway on Corridor Vc, section Medakovo - Ozimice, including a 2200 m tunnel. Contact Public Company (PC) Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Jasmina Olovcic, Sarajevo, tel +38 733277921, fax +38 733277901, email o.jasmina@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 045476-2023. Ref.n. EIB-GtP/MOB 20190751-05. 04/23. 



Permalink

 

Cengiz Insaat Sanayi Ve Ticaret AS from Istanbul secured the EUR361.75 million contract, excluding VAT, for the construction of the 21.3 km long section of Motorway between Medakovo and Ozimice on Corridor Vc. The works include one interchange, two two-sided rest areas, eight bridges and viaducts, two overpasses, fifteen underpasses and one tunnel 2200 m long. Contact Public Company (PC) Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Jasmina Olovcic, Sarajevo, tel +38 733277921, fax +38 733277901, email o.jasmina@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161409-2023. Ref.n. EIB-GtP/MOB 20190751-03. 19/23. 



Permalink


Open invitation to tender, deadline 26/06/23, for the construction of the 11.9 km long section of Motorway between Ozimice and Poprikuse on Corridor Vc. The works include five double-tube tunnels with aggregate length of about 2.7 km, nine bridges, three underpasses and one overpass. Value of contract EUR330 million, excluding VAT. Duration contract 24 months. Contact Public Company (PC) Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Jasmina Olovcic, Sarajevo, tel +38 733277921, fax +38 733277901, email o.jasmina@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=235130-2023. Ref.n. EIB-GtP/MOB 20190751-04. 19/23. 

Bosnia and Herzegovina-Sarajevo: Motorway construction works

2023/S 079-235130

Contract notice

Works

Legal Basis:

This contract will be financed by European Investment Bank (EIB) and is subject to the EIB's Guide to Procurement

Section I: Contracting authority

I.1)Name and addresses
Official name: PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar
Postal address: Hamdije Kreševljakovića 19
Town: Sarajevo
NUTS code: BA Bosnia And Herzegovina
Postal code: 71000
Country: Bosnia and Herzegovina
Contact person: Jasmina Olovčić
E-mail: o.jasmina@jpautoceste.ba
Telephone: +38 733277921
Fax: +38 733277901
Internet address(es):
Main address: www.jpautoceste.ba
I.3)Communication
Access to the procurement documents is restricted. Further information can be obtained at:
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Body governed by public law
I.5)Main activity
Other activity: Road Management

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Construction of Motorway on Corridor Vc, Section Medakovo – Poprikuše, Subsection Ozimice - Poprikuše

Reference number: EIB-GtP/MOB 20190751-04
II.1.2)Main CPV code
45233110 Motorway construction works
II.1.3)Type of contract
Works
II.1.4)Short description:

The subject of this Contract is construction of 11.9 km long section of Motorway on Corridor Vc between Ozimice and Poprikuše. The works include five (5) double-tube tunnels, nine (9) bridges, three underpasses and one overpass.

II.1.5)Estimated total value
Value excluding VAT: 330 000 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: BA Bosnia And Herzegovina
Main site or place of performance:

The works are expected to be delivered on the construction site, on motorway sub-section Ozimice – Poprikuše.

II.2.4)Description of the procurement:

A Contractor will be selected in accordance with the EIB Guide to Procurement, September 2018: https://www.eib.org/en/publications/guide-to-procurement


The construction works are expected to be financed through the Loan agreement signed with European Investment Bank (EIB) and Grant funds from the Western Balkans Investment Framework.


Public company Motorways of the Federation of Bosnia and Herzegovina Ltd. Mostar (hereinafter referred as “the Employer”) now invites sealed tenders from contractors for the Contract JPAC 1479-B-149-22, Subsection: Ozimice – Poprikuše in total length of 11.9 km


Firms originating from all countries of the world are eligible to tender for works, goods and services contracts.


The procurement procedure to be applied is a single stage, two-envelope tendering procedure.


The Tenderers will submit Tender containing two envelopes: one envelope with the Technical Tender and another envelope with the Price Tender. Technical Tender will be evaluated first, and only if Technical Tender is determined to be substantially responsive, the Tenderer’s Price Tender will be opened.


The Employer shall award the Contract to the Tenderer whose Tender has been determined to be the lowest evaluated Tender and is substantially responsive to the Tender Document, provided further that the Tenderer is determined to be qualified to perform the Contract satisfactorily and has sufficient bid capacity as defined in the tender document.


Bidders are allowed to ask clarifications no later than 21 days prior to the deadline for submission of Tenders by sending an email to the relevant address above.


The FIDIC Conditions of Contract for Construction for Building and Engineering Works designed by the Employer (edition 1999) will be used for the Contract.


Tender documents may be obtained from the address below upon payment of a non-refundable fee of EUR 300.00 or equivalent in a convertible currency by bank transfer to:


Beneficiary Bank: Raiffeisen Bank d.d. Bosnia and Herzegovina


Swift Code: RZBABA2S


IBAN Code: BA391611200000709894, (for payments in EUR (€)) or


No. 161-020-00624700-38 (for payments in BAM),


Beneficiary name: JP Autoceste FBiH d.o.o. Mostar.


Beneficiary address: Adema Buća 20, 88000 Mostar, Bosnia and Herzegovina


Payment option is OUR which means that the Tenderer will cover all Bank costs related to this payment and money transfer.


Upon receipt of appropriate evidence of payment of the non-refundable fee, if requested, the documents will promptly be dispatched by courier. However, no liability can be accepted for their loss or late delivery. In addition, if requested, the documents (except the stamped copy of the Bill of Quantities) can be dispatched electronically. In the event of discrepancy between electronic and hard copies of the documents, the hard copy shall prevail.


All Tenders must be accompanied by one, single tender security of EUR 6,600,000.00.

II.2.5)Award criteria
Criteria below
Price
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 24
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: no
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: yes
Identification of the project:

Western Balkans Investment Framework.

II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:

The Tenderer shall provide a trade licence or professional registers in their Country of Establishment.


The Tenderer shall provide a statement confirming that he either possess (or will apply within 10 working days after the issuance of the Letter of Acceptance), in the event he is awarded the contract, for License /Authorization for performing of construction works on the territory of the Federation of Bosnia and Herzegovina and License/Authorization for performing of site investigations for him or his subcontractor.


This license/Authorization is issued by the Federal Ministry of Physical Planning and is in accordance with law in Federation of Bosnia and Herzegovina (Article 38. of Decree on construction site organization, mandatory construction documents and construction actors; “Official Gazette of the Federation of Bosnia and Herzegovina” No. 48/09, 16th July, 2009).


The experience and financial record of any proposed sub-contractor shall not be included in the evaluation.

III.1.2)Economic and financial standing
List and brief description of selection criteria:

The Tenderer must meet the following criteria:


a) The Tenderer shall have an average annual turnover as prime contractor (defined as billing for works in progress and completed) over the last 7 (seven) years of not less than EUR 330 million equivalent.


b) The Tenderer shall complete Financial Information provided in Section IV, Tender Forms, and demonstrate that it has access to, or has available liquid assets, unencumbered real assets, lines of credit, and other financial means sufficient to meet the construction cash flow for the contract for a period of 4 (four) months, estimated as not less than EUR 55 million equivalent, taking into account the tenderer's commitments for other contracts.


Note: The full qualification criteria and criteria for JVCA are available in the Tender Dossier and those shall prevail.

III.1.3)Technical and professional ability
List and brief description of selection criteria:

The Tender Dossier available from the Employer includes a comprehensive list of technical criteria and criteria for JVCA which Tenderers must fulfil to be considered for opening of the financial proposal, and those criteria shall prevail. The criteria include the following:


Note: Term “within the last 7 years” means that projects that have been completed in the period starting from the April 2016 to date of publishing the tender will be taken into consideration.


(a) Successful experience as prime contractor (one contractor signed contract), lead partner, partner in JVCA/consortium or subcontractor in the execution of at least 2 (two) projects, of nature and complexity comparable to the proposed contract (construction of full profile motorway/expressway) within the last 7 years. The value of each contract should not be less than EUR 264 million.


In case that tenderer demonstrates a successful experience in a role of subcontractor, the total value of that subcontract should not be less than EUR 264 million. In case of the multiple subcontracts (or contracts) on the same Project, the different (sub)contracts will be treated cumulatively as a whole.


The similarity shall be based on the physical size, complexity, methods/technology or other characteristics as described in Section VI, Requirements, Scope of Works.


(b) At least one of the above required projects must include one full motorway profile bridge/viaduct in minimum length of 420 m and one double tube tunnel in minimum length of 600 m. In case these projects do not include required bridge/viaduct/tunnel, for the successful demonstration of this specific construction experience, tenderers can present another project, regardless of its contract value, which includes a one full motorway profile bridge/viaduct minimum length of 420 m and one double tube tunnel in minimum length of 600 m.


Note: The full qualification criteria and criteria for JVCA are available in the Tender Dossier and those shall prevail.

III.2)Conditions related to the contract
III.2.2)Contract performance conditions:

The FIDIC Conditions of Contract for Construction for Building and Engineering Works designed by the Employer (edition 1999) will be used for the Contract.


The selected Contractor shall be required to perform the Works in accordance with the laws and regulations of BiH and the Entity of the Federation of Bosnia and Herzegovina governing the field of construction and civil engineering and the latest EIB’s Guide to Procurement, and in accordance with the Technical Specifications, Technical Descriptions, Main Design Drawings, Bill of Quantities and Conditions of Contract.


Environmental and Social Covenant to be signed and submitted as part of their technical proposal and appended into the resulting contract.


Payment for the Works shall be based on remeasurement.

III.2.3)Information about staff responsible for the performance of the contract
Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract

Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Open procedure
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no
IV.2)Administrative information
IV.2.1)Previous publication concerning this procedure
Notice number in the OJ S: 2021/S 069-174124
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 26/06/2023
Local time: 10:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
English
IV.2.6)Minimum time frame during which the tenderer must maintain the tender
Duration in months: 6 (from the date stated for receipt of tender)
IV.2.7)Conditions for opening of tenders
Date: 26/06/2023
Local time: 10:30
Place:

Public company Motorways of the Federation of Bosnia and Herzegovina Ltd. Mostar


Hamdije Kreševljakovića 19, 71000 Sarajevo, Bosnia and Herzegovina

Information about authorised persons and opening procedure:

Tenderers shall not have the option of submitting their tenders electronically.


Tender submission details are prescribed in the tender dossier.

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.3)Additional information:

JPAC reserves its right to seek clarifications and verify submitted references and use the information so obtained for evaluation purposes.


All costs related to participation in this procurement procedure shall be borne by tenderers.


Pursuant to its Sanctions Policy, the EIB shall not provide finance, directly or indirectly, to or for the benefit of an individual or entity that is subject to financial sanctions imposed by the UK, USA, EU, either autonomously or pursuant to the financial sanctions decided by the United Nations Security Council on the basis of article 41 of the UN Charter. The attention of tenderers is drawn to the EIB Anti-Fraud Policy, EIB Exclusion Policy and EIB's definition of prohibited conduct.


After publication of the notification on technical evaluation of the tenders, unsuccessful tenderers may request in writing to the Employer for a debriefing seeking explanations on the grounds on which their tenders were not selected. The Employer shall promptly respond in writing to any unsuccessful tenderer who, after publication of the notification on technical evaluation of the tenders, requests a debriefing. Any tenderer who is not satisfied with the Employer’s debriefing has the right to file a Complaint to the Independent Complaints Committee appointed by Federal Ministry of Transport and Communications.


Tenderers should alert the Procuring Entity, with a copy to the European Investment Bank to procurementcomplaints@eib.org, in case they should consider that certain clauses or provisions of this notice might limit international competition or introduce an unfair advantage to some tenderers.


Furthermore, any party having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement of the Guide to Procurement may submit a complaint to the Bank’s Procurement Complaints Committee (PCC) as per Annex 8 of the EIB’s Guide to Procurement. Complaints are to be submitted by mail or electronic mail to procurementcomplaints@eib.org.

VI.4)Procedures for review
VI.4.1)Review body
Official name: Independent Complaints Committee appointed by Federal Ministry of Transport and Communications
Postal address: Braće Fejića bb
Town: Mostar
Postal code: 88000
Country: Bosnia and Herzegovina
VI.5)Date of dispatch of this notice:
17/04/2023



Permalink


Postponed  from 26/06/23 to 15/09/2023 the deadline of the open invitation to tender  for the construction of the 11.9 km long section of Motorway between Ozimice and Poprikuse on Corridor Vc. The works include five double-tube tunnels with an aggregate length of about 2.7 km, nine bridges, three underpasses and one overpass. Value of the contract is EUR330 million, excluding VAT. Duration of the contract will be 24 months. Contact Public Company (PC) Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Nemanja Kulina, Sarajevo, tel +387 33277971, fax +387 33277901, email k.nemanja@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=453375-2023. Ref.n. EIB-GtP/MOB 20190751-04. 32/23.



Permalink

Bosnia and Herzegovina, National - ba/17

Motorway and Road

The joint venture between HERING DD and BBM DOO Provo bb at Siroki Brijeg secured the EUR7.33 million contract, excluding VAT, for improvements to the 1062 m Vranduk II tunnel on the M17, also the section Doboj – Zenica and the reconstruction of the Bridges Bosna IV and V (Lot 1);

 

The joint venture between JATA GROUP DOO and ROADING DOO Podpeć bb from SREBRENIK  secured the EUR1.08 million contract, excluding VAT, for the paving of the section  Vitalj – Vlasenica and Reconstruction of the Black Spot “Olovo – nula” (Lot 2);

 

The joint venture between JATA GROUP DOO and HERING DD Podpeć bb from SREBRENIK  secured the EUR1.41 million contract, excluding VAT, for the improvements to the 247 m  Ormanica tunnel on the M-1.8, section Pelagicevo – Srebrenik  and Reconstruction of the Black Spot

“Husino” (Lot 3); Contact JP Ceste Federacije BiH d.o.o. Sarajevo, Sarajevo, tel +387 33 250

370, fax +387 33 250 387, email pit@jpcfbih.ba. Visit

https://jpcfbih.ba/bs/novosti/potpisani-ugovori-za-izvodenje-radova/67 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=419165-2018.

Ref. n. BA/FBH/FRSMP/ICB/3/W/18. 39/18.



Permalink

Open invitation to tender, deadline 02/12/2019, for the upgrading and reconstruction of roads and tunnels (tender Package 3) on main roads: M1.8, M4; M5, M15 and M16.2. The contract is divided into 6 lots:

  • Lot 1: M4 , section Simin Han 1 - Donje Caparde, Rehabilitation of Tunnel Caklovici (Canton Tuzla, TK);
  • Lot 2: M1.8 Border BH/HR - Loncari and Pelagicevo – Srebrenik Road Reconstruction (Cantons Posavina PK and Tuzla TK);
  • Lot 3: M1.8 - Srebrenik – Sicki Brod Road Reconstruction (Canton Tuzla TK);
  • Lot 4: M15 - Kamicak - Kljuc - Reconstruction following road movement : Crljeni - Zgon and M15 - Kamicak – Kljuc - Bridge reconstruction across river Banjica (Canton Una Sana USK);
  • Lot 5: M5 - Kaonik – Gromiljak - Completion of reconstruction of Busovaca-Draga, Delfine krivine and Jehovac – Brestovsko (Canton Central Bosnia SBK);
  • Lot 6: M16.2 - Prozor - Jablanica 1 - Rehabilitation of Tunnel Jasen, Ustirama, km 17+686 (Canton Herzegovina-Neretva HNK).

The contract is expected to start on 24/02/2020 and last about 8 months. Contact  Javno Poduzece Ceste Federacije Bosne i Hercegovine, attn Branislav Petrovic, Sarajevo, tel +387 33 250377/+387 33 563 453, email pit@jpcfbih.ba. For bid/tender documents click here. Procurement Ref.n. 47461-TeRef-9621345. 42/19.



Permalink

Bosnia and Herzegovina, Zenica - ba/16

Hydropower

Closing Date: 17.04.2014 (Tender Closed)

Invitation for prequalification, deadline 17.04.2014, for construction of Hydro Power Project Vranduk on river Bosna. The contract includes the design, manufacturing, supply and installation of equipment, testing and commissioning. HPP Vranduk includes a 1.5 km-long power tunnel. Contact Mr Edib Basic, Elektroprivreda, Sarajevo, tel + 387 33 751 030, fax + 387 33 751 033, e-mail e.basic@elektroprivreda.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100195-2014. Ref.n. 7310-PRE-44199. 13/14.



Permalink

Invitation of expression of interest, deadline 29.01.2015, for consultancy services for Hydro Power Project Vranduk on river Bosna which includes a 1.5 km-long power tunnel. Contact Mrs Zijada Kapetanovic-Beslagic at Elektroprivreda, Sarajevo, tel + 387 33 751 042, fax + 387 33 751 033, e-mail z.kapetanovic@elektroprivreda.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=435305-2014. Ref.n. 7768-EOI-44199. 52/14.



Permalink


The Austrian and Croatian consortium of Strabag (63,4%) and Koncar (36,6%) has been awarded the EUR57 million contract to build the Vranduk power plant on the river Bosna on behalf of energy supply company JP Elektroprivreda BiH. The 20 MW hydropower plant will be completed within a period of 46 months. The contract includes a power tunnel 1,462 m lenght and 6.6 m diameter. Click ba/16 for tunnelbuilder archive. Visit http://www.strabag.com/ and http://www.koncar.com/. 02/16.




Permalink


The JV STRABAG AG (Austria)/Koncar inzenjering za energetiku i transport (Croatia) secured the EUR57.40 million contract, excluding VAT, for construction of Hydro Power Project Vranduk on river Bosna, including a 1.5 km-long power tunnel. The contract includes the design, manufacturing, supply, installation, testing and commissioning of equipment,. Contact Elektroprivreda, attn Mr Edib Basic, Sarajevo, tel + 387 33 751 030, fax + 387 33 751 033, e-mail e.basic@elektroprivreda.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=32373-2016. Ref.n. 7310-PRE-44199. 05/16.




Permalink

Bosnia and Herzegovina, National - ba/15

Railway

Closing Date: 20.11.2014 (Tender Closed)

Prior Information Notice, deadline 20.11.2014, for track overhaul including reconstruction of the permanent way, track formation and structures, tunnel rehabilitation, station signalling and level crossings, reconstruction of power traction substations and overhead contact line on key sections of the railways on Corridor 5c Sarajevo-Bradina; for purchase and installation of signalling equipment, electrical works, telecommunication and station interlocking system along the route Banja Luka-Doboj. Tendering for any goods, works and services is expected to start in first quarter of 2014. Contact Dragan Calovic, BHRPC – Project Implementation Unit, Doboj, tel +387 53 201 000, +387 33 223 099, fax +387 53 241 788; +387 33 223 098, e-mail bhzjkdo@teol.net and dragan.calovic@zfbh.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=397053-2013. Project n. 7230-GPN-35418. 49/13.



Permalink

Invitation to tender using restricted procedure, deadline 30.06.2014, for provision of preliminary designs and studies for removing the railway traffic bottleneck at Ivan-Bradina, which include substandard profile at 3 km-long Ivan Mountain tunnel and over-gradient at Bradina Ramp. Tender number EC/BIH/TEN/13/050. Tender application forms at http://ec.europa.eu/europeaid/work/procedures/implementation/services/index_en.htm. Applications to Procurement Team, Delegation of the European Union to Bosnia & Herzegovina, Skenderija 3a, 71000 Sarajevo, Bosnia & Herzegovina, tel +387 33254700, fax +387 33666037, e-mail delegation-bih@ec.europa.eu. Provisional date of invitation to tender August, 2014, start of work January, 2015 for one year, budget EUR600,000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=177708-2014. 22/14.



Permalink

Contract notice, deadline 22.09.2014, for major track overhaul as part of 3.22 km-long Ivan tunnel rehabilitation works on section Rasputnica Miljacka-Bradina along railway line Sarajevo-Capljina and Rehabilitation of OCL on the line section Sarajevo-Bradina. Contact Dragan Calovic, BHRPC, Sarajevo, tel +387 (0)33 658 148, +387 (0)33 223 099, fax +387 (0)33 615 986, +387 (0)33 223 098, e-mail bhzjk@bih.net.ba o dragan.calovic@zfbh.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258037-2014. Project n. 7658-IFT-35418. 32/14.



Permalink

Deadline postponed from 22.09.2014 to 07.10.2014 for bids for major track overhaul as part of 3.22 km-long Ivan tunnel rehabilitation works on section Rasputnica Miljacka-Bradina along railway line Sarajevo-Capljina and Rehabilitation of OCL on the line section Sarajevo-Bradina. Contact Dragan Calovic, BHRPC, Sarajevo, tel +387 (0)33 658 148, +387 (0)33 223 099, fax +387 (0)33 615 986, +387 (0)33 223 098, e-mail bhzjk@bih.net.ba or dragan.calovic@zfbh.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=320362-2014. Project n. 7658-IFT-35418. 39/14.



Permalink

Public Enterprise Railways of the Federation BiH (ZFBH) signed the EUR25 million contract with the consortium GCF-Generali Costruzioni Ferroviarie SpA (Italy)/Hering (Bosnia and Herzegovina) for overhaul of the 30 km Sarajevo-Bradina railway line. Visit www.zfbh.ba and  http://www.ambsarajevo.esteri.it/Ambasciata_Sarajevo/Templates/News.aspx?NRMODE=Published&NRNODEGUID={39447E95-7993-4A02-9AF4-6BC63A9B6F52}&NRORIGINALURL=%2fAmbasciata_Sarajevo%2fArchivio_News%2fgeneralicostruzioniferroviarie.htm&NRCACHEHINT=NoModifyGuest. 07/15.



Permalink

Bosnia and Herzegovina, Karaula - ba/14

Highway

Closing Date: 14.08.2013 (Tender Closed)

Open invitation to bid, deadline 14.08.2013, for construction and equipping of 902 m-long Karaula tunnel with 418 m-long emergency tunnel on M-18, together with 1,133 m of highway. This is known as contract BA/RMFBH/W/ICB/1/13, duration 16 months, funded by EIB and Government of FBH. Further information and tender documents from JP Ceste Federacije BiH in Sarajevo, tel +387 33 250-377, fax –387, e-mail pit@jpcfbih.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=211847-2013. 27/13.

 



Permalink

Open invitation to bid, deadline 02.09.2013, for engineer services for 902 m-long Karaula tunnel with 418 m-long emergency tunnel on M-18, together with 1,133 m of highway. This is known as contract BA/RMFBH/W/ICB/2/13, duration 24 months, funded by EIB and Government of FBH. Interested consultants may obtain further information and request for proposal from JP Ceste Federacije BiH in Sarajevo, tel +387 33 250-370, fax –400, e-mail pit@jpcfbih.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229451-2013. 28/13.

 



Permalink

JP Ceste FBiH received five bids from local and international companies for supervision services related to the construction of 902 m-long Karaula tunnel with 418 m-long emergency tunnel on M-18, together with 1,133 m of highway. The companies are Institut IGH Joint Stock (Zagreb, Croatia), JV Roughton (UK) & IPSA Istitut (Bosnia Herzegovina), JV Institut za gradevinarstvo IG Banja Luka & Trasa Sarajevo (Bosnia Herzegovina), Aecom Inocsa (Madrid, Spain) and IRD Engineering (Rome, Italy). Visit http://www.jpdcfbh.ba/ba/novosti/saopcenja_za_javnost/0052_02.09.2013.shtml. 38/13.



Permalink

JP Ceste FBiH received nine bids from local and international companies for construction of  902 m-long Karaula tunnel with 418 m-long emergency tunnel on M-18, together with 1,133 m of highway. The companies are Integral Inzenjering (Bosnia Herzegovina), Hidroelektra Niskogradnka (Croatia),   Aktor (Greece), JV Euro-Asfalt & GP ŽGP (Bosnia Herzegovina), Skladgradnja (Croatia), Strabag AG (Austria), Viadukt (Croatia), Sinohydro Corporation Ltd (China) - Predstavnistvo Beograd (Serbia), OHL ZS a.s. (Czech Republic). Visit http://www.jpdcfbh.ba/ba/novosti/saopcenja_za_javnost/0050_14.08.2013.shtml. 38/13.



Permalink

JV Roughton Int. Ltd & IPSA Institut doo with sub-consultant Geotehnicki Studio of Hampshire (UK) secured the EUR468,000 contract for engineer services at 902 m-long Karaula tunnel with 418 m-long emergency tunnel on M-18, together with 1,133 m of highway. Contact JP Ceste Federacije BiH in Sarajevo, tel +387 33 250-370, fax –400, e-mail pit@jpcfbih.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=181744-2014. Bid Code n. BA/RMFBH/EIB/S/ICB/2/13. 23/14.



Permalink

Strabag AG of Spittal/Drau (Austria) secured the EUR12.4 million contract for construction and equipping of 902 m-long Karaula tunnel with 418 m-long emergency tunnel on M-18, together with 1,133 m of highway. Contact JP Ceste Federacije BiH in Sarajevo, tel +387 33 250-377, fax –387, e-mail pit@jpcfbih.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=181743-2014. Bid Code n. M-18 BA/EIB/RMFBH/W/ICB/1/13. 23/14.



Permalink

Bosnia and Herzegovina, Bocac - ba/13

Hydropower

Closing Date: 27.05.2011 (Tender Closed)

Open invitation to tender, deadline 27.05.2011, for construction of additional spillway in open air and tunnel for control of flood discharges in the storage of Bocac HEPP, and establishment of facilities technical monitoring system. Financed partly by EIB loan, value EUR103 million. Contract duration 18 months. Further information and bidding documents from Milan Bejat at ERS in Banja Luka, tel +387 51343-924, fax -929, tel/fax +387 59277-145, e-mail mbejat@ers.ba or from Goran Milanovic e-mail g.milanovic@henavrbasu.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=088925-2011. 12/11.



Permalink

Contract award, value EUR4.2 million, to Konstruktor-Inzinjering/Integral Inzinjering of Split for supervision of dam safety components for construction of additional spillway in open air and tunnel for control of flood discharges in the storage of Bocac HEPP. Further information from Milan Bejat at ERS in Banja Luka, tel +387 51343-924, fax –929, tel/fax +387 59277-145, e-mail mbejat@ers.ba or visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=301654-2011. 39/11.



Permalink

Bosnia and Herzegovina, Zenica Doboj - ba/12

Motorway

Prequalification notice, deadline 22.06.2009, for construction of 3.1 km-long subsection Gorica-Biljesevo of the 15.4 km-long Drivusa-Kakanj section of Pan European Corridor 5c motorway including 2.95 km-long Vijenac twin tube tunnel. This is known as contract No 2, code 5938-PRE-38716, financed by EBRD loan. Prequalification documents, cost EUR200, from Sanela Kosovac at Federal Traffic Department in Sarajevo, tel +387 33 562-700 and -694, fax -690, e-mail h.sanela@feda.ba. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=1329936-2009 20/09.Invitation for expressions of interest in provision of consulting services for construction supervision of 3.56 km-long full profile motorway including 2.95 km-long, twin-tube Vijenac tunnel. Contract commencement around August, 2009. This is known as lot 2, code FEDA-74-E34-09, financed by EBRD loan. Further information from Sanela Kosovac at Federal Traffic Department in Sarajevo, tel +387 33 562-694 and -700, fax -690, e-mail h.sanela@feda.ba. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=132937-2009 20/09.



Permalink

The Bosnia and Herzegovina public company Autoceste Federacije BIH, the local road network manage, awarded to the consortium IPSA Institute Sarajevo (leader)/IGH Zagreb/TZI Sarajevo the main design for Corridor 5c motorway section Tar?in-Konjic from km 11+050 to km 22+150, lot 2, including 13 tunnels, click here. Contract value EUR3.5 million including VAT. Visit www.jpautoceste.ba. 04/11.



Permalink

Slovenian engineering company Primorje in consortium with the local companies Euroasfalt, ZGP and Hidrogradnja signed a EUR62.08 million contract for the construction of the Gorica-Biljesevo section on the V-c corridor, including the Vijennac tunnel. For project information visit tunnelbuilder archive ba/12 and www.jpautoceste.ba/text.php. 19/11.



Permalink

Open invitation to tender, deadline 27.04.2012, for design and construction of 36.6 km-long section Prnjavor-Doboj of the Banja Luka-Doboj section of Pan European Corridor 5c, 2+2-lane motorway including tunnels and works to 20 km of local roads. Contract code 6602-IFT-41370, financed by EBRD loan. Tender documents, cost EUR500, from Dusan Topic at ARS in Banja Luka, tel +387 51 233-670, fax –700, e-mail dtopic@autoputevirs.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=074243-2012. 10/12.



Permalink

Open invitation to tender expressions of interest, deadline 28.09.2012, for main design of 11 km-long Pocitelj-Zvirovici subsection of the 21.4 km-long Pocitelj-Bijaka section of Pan European Corridor 5c, 2+2-lane motorway including tunnels and works to local roads. Contract code JPAC 347-A62-12, financed by EIB grant. Further information from Adnan Zoranic z.adnan@jpautoceste.ba or Mirza Resic r.mirza@jpautoceste.ba in Sarajevo, tel +387 332779-22, fax –01. Office hours weekdays 09.00-16.00. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=262775-2012. 34/12.



Permalink

Prior information notice that bidding for construction of inner secondary lining and completion of all other external works of 2.95 km-long Vijenac twin tube tunnel will commence Q4/2012. This is known as contract code 6962-GPN-38716, financed by EBRD loan. Further information from Mirza Resic in Sarajevo, tel +387 33 277-910, fax –901, e-mail r.mirza@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=381148-2012. 48/12.



Permalink

Open invitation to tender, deadline 15.02.2012, for design and construction of 35.3 km-long Banja Luka-Prnjavor section of Banja Luka-Doboj motorway, part of Pan European Corridor 5c 2+2-lane motorway, including tunnels and works to 23.755 km of local roads. Tender no RS/EIB-2012/W, financed by EBRD loan. Tender documents, cost EUR500, from Dusan Topic at ARS in Banja Luka, tel +387 51 233-670, fax –700, e-mail dtopic@autoputevirs.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=389183-2012. 50/12.



Permalink

Open invitation to bid, deadline 14.02.2013, for construction of inner secondary lining and completion of all other external works of 2.95 km-long Vijenac twin tube tunnel. This is now known as contract JPAC 365-B48-12, financed by EBRD loan. Contract duration 12 months. Further information from Mirza Resic in Sarajevo, tel +387 33 277-910, fax –901, e-mail r.mirza@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=412913-2012. 01/13.



Permalink

General Procurement notices for the Corridor Vc Phase 3 Project. The State of Bosnia and Herzegovina intends using the proceeds of a loan from the EBRD (European Bank for Reconstruction and Development) of EUR 120 million and a loan from the EIB (European Investment Bank) for the
amount of EUR 90 million to finance the construction of priority motorway sections along the international transport Corridor Vc. The Corridor Vc Phase 3 Project, which has a total estimated cost of EUR 235 million, will require the procurement for construction and supervision services of the 2
km Ivan tunnel (Lot 2) on the 16.8 km Tarcin-Ivan subsection, Tarcin-Konjic motorway section and of the 5.1km Poprikuse-Nemila motorway section. Tendering for the above contracts is expected to begin in the second half of 2018. Contact PC Motorways of the Federation of Bosnia and
Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://www.ebrd.com/work-with-us/procurement/p-pn-180511a.html  and
http://www.jpautoceste.ba/wp-content/uploads/2018/05/GPN-Tarcin-Ivan-Poprikuse-Nemila.pdf.
Ref.n. 9088-GPN-49058. 20/18.



Permalink

Invitation for Expressions of Interest, deadline  04.10.2018, for supervision of works on the construction of motorway Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin Ivan, Lot 2 Tunnel Ivan. The contract is expected to start on 18.2.2019 and last about 30 months + 24 months DNP. Further information from https://ecepp.ebrd.com/respond/T53J7Q2676. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=369490-2018.

Contract n. JPAC 986-E504-18, Tender n. 7536239. 34/18.



Permalink

Invitation for Expressions of Interest, deadline 04.10.2018, for the consulting services for technical assistance to the PIU  (Project Implementation Unit) of the Public company Motorways of the Federation of Bosnia and Herzegovina Ltd. This is for the project on Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin Ivan, Lot 2 Tunnel Ivan. The contract is expected to start on 24.12.2018 and last about 33 months + 24 months DNP. Further information from https://ecepp.ebrd.com/respond/3828J93F89. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=369489-2018.

 Contract n. JPAC 987-E505-18, Tender n. 7536595. 34/18.



Permalink

Invitation for Expressions of Interest, deadline 04.10.2018, for the construction of a new approx. 2.0 km long motorway section including the 1,76 km long twin Ivan tunnel and the 700 m temporary connection with the M17, part of  the project on Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin-Ivan. The contract is expected to start on 18.02.2019 and last about 33 months. Further information from https://ecepp.ebrd.com/respond/64W72892Z8. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=369486-2018.

 Tender n. 7535808. 34/18.



Permalink

Invitation for expressions of interest, deadline 16.01.2019, for  a Lender’s Monitoring Advisor (LMA, the Consultant) to assist the EBRD (European Bank for Reconstruction and Development) in monitoring the implementation of the Project (the assignment) involving the construction of the three new sections of Corridor Vc: tunnel Ivan and two motorway sections (Poprikusa - Nemila and Mostar South Interchange - Tunnel Kvanj) 15.8km total length. The EUR 125,000 assignment, excluding VAT, has an estimated overall duration of 36 months. Any clarification question must be submitted by 02.01.2018 to Viv Lewis-Headlam, EBRD, London, email lewishev@ebrd.com. For further information visit http://www.ebrd.com/documents/procurement/tors-76443.docx and https://www.ebrd.com/work-with-us/procurement/pn-76443.html. 01/19.



Permalink

China State Construction Engineering Corporation Ltd from Beijing secured the EUR56.52 million contract, excluding VAT, for construction of motorway on corridor Vc, Lot 1: Interchange Pocitelj – beginning of bridge Pocitelj and end of bridge Pocitelj –interchange Zvirovici (from km 0+000,00 to km 3+425,00 and from 4+404,00 to km 11+075,00). The contract is divided in two sections  and the construction includes the tunnel Pocitelj tunnel (1163 m, right/1192 m, left). Contact Motorways of the Federation of Bosnia & Herzegovina, attn Tarik Durakovia and Sigra Sanela Kosovac, tel

+387 33 277 966-921, fax +387 33 277 901-942, email  +d.tarik@jpautoceste.ba

 e k.sanela@jpautoceste.ba. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=297633-2019.

Ref.n. JPAC 975-B96-18.26/19.



Permalink

IRD Engineering Srl from Rome secured the EUR1.85 million contract,excluding VAT,  for consulting services for supervision of works on the construction of  the motorway on Corridor Vc, section Tarcin-Konjic, subsection Tarcin-Ivan, Ivan tunnel (Lot 2). Duration of the contract is 57 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba. Visit https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=9219971 . Ref.n. 7536239. 44/19.



Permalink

The Joint Venture composed of Civil Engineering institute IG from Banja Luka (leader, BA) and KREBS+KIEFER Eastern Europe GmbH from Darmstadt (DE) secured the EUR687,600 contract, excluding VAT, for the consulting services for technical assistance to the PIU  (Project Implementation Unit) of the Public company Motorways of the Federation of Bosnia and Herzegovina Ltd. This is for the project on Corridor Vc Phase 3, section Tarcin Konjic, subsection Tarcin Ivan, Lot 2 Tunnel Ivan. Duration of the contract is 57 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba.  Visit  https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=9219880 .


Contract n. JPAC 987-E505-18, Tender n. 7536595. 44/19.



Permalink

Euro-Asphalt from Sarajevo secured the EUR57.63 million contract, excluding VAT,  for the construction of a new 2.0 km long Tarcin-Konjic motorway section including  the twin tube Ivan tunnel, 1,76 km long, and a temporary 700 m connection with road M17. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Mrs Lejla Hodzic, Sarajevo, tel +387 (0) 33 277 922, fax  +387 (0) 33 277 910, email h.lejla@jpautoceste.ba. Visit  http://www.jpautoceste.ba/potpisan-ugovor-o-izgradnji-dionice-tarcin-konjic-poddionica-tarcin-ivan-lot-2-tunel-ivan/


and https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=9710545 .

Ref.n. 7535808. 44/19.



Permalink

Invitation for tender, deadline 24/02/2020, for civil works and consulting services for the motorway section Tunnel Kvanj-Buna from km 9 + 125 to km 14 + 380, including the Kvanj twin tube tunnel: right tube length 2 645 m and left tube, length 2 720 m. The contract includes also the reconstruction of regional Buna – Domanovici road. Duration of the contract is 36 months. Contact Public company Motorways of the Federation of Bosnia and Herzegovina Ltd, attn Lejla Hodzic and Jasmina Olovcic, Sarajevo, tel +387 33 277 922- 966, fax +387 33 277 901, email  h.lejla@jpautoceste.ba and o.jasmina@jpautoceste.ba. For tender documents please click here Contract Ref. n. JPAC 1133-B110-19. 02/20.



Permalink


Technital SpA from Verona secured the EUR 699,380 contract, excluding VAT, for technical Assistance to the Project Implementation Unit (PIU)  for Projects on the Corridor Vc Motorway: Tunnel Kvanj-Buna and Tarcn -Entrance to Tunnel Ivan. Contact Public company Motorways of the Federation of Bosnia and Herzegovina Ltd, Monstar, tel +387 36512300, fax +387 36512301, email   info@jpautoceste.ba. For tender documents please click here Contract Ref. n. JPAC 1079-E566-19. 21/21. 

 




Permalink


The procurement procedure for civil works and consulting services for the motorway section Tunnel Kvanj-Buna from km 9 + 125 to km 14 + 380, including the Kvanj twin tube tunnel was annulled by the Procuring Entity due to long passage of time since the invitation to tender. Contact Public company Motorways of the Federation of Bosnia and Herzegovina Ltd, Mostar, tel +387 36512300, fax +387 36512301, email  info@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=191012-2022.  Ref. n. JPAC 1133-B110-19. 15/22.



Permalink


Restricted invitation to tender, deadline 10/10/2022, for the construction of motorway on Corridor Vc, 5.25km section tunnel Kvanj-Buna, including the Kvanj tunnel (2645 m, 2720 m), Viaduct Rotimski potok and overpass Rujevice. Value of the contract is EUR150 million, excluding VAT. Duration of the contract is 24 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Lejla Hodzic,  Sarajevo, tel +387 33277922, fax +387 33277901, email h.lejla@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=433582-2022. Ref. n. EIB-GtP/20150773-05. 36/22. 



Permalink


The restricted invitation to tender, deadline 10/10/2022, for the construction of motorway on Corridor Vc, 5.25km section tunnel Kvanj-Buna, including the Kvanj tunnel (2645 m, 2720 m), Viaduct Rotimski potok and overpass Rujevice has been discontinued. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, Mostar,  tel +387 36512300, fax +387 36512301, email  info@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=793536-2023. Ref. n. EIB-GtP/20150773-05. 02/24. 



Permalink


Restricted invitation to tender, deadline 02/04/2024, for the construction of motorway on Corridor Vc, 5.25km section tunnel Kvanj-Buna, including the Kvanj tunnel (2645 m, 2720 m), Viaduct Rotimski potok and overpass Rujevice. Value of the contract is EUR150 million, excluding VAT. Duration of the contract is 30 months. Contact PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, attn Nemanja Kulina,  Sarajevo, tel +387 033277971, fax +387 033277901, email k.nemanja@jpautoceste.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=031851-2024. Ref. n. EIB-GtP/20150773-08. 04/24. 



Permalink

Bosnia and Herzegovina, Sarajevo - ba/11

Highway

Prequalification tenders invited, deadline 1st October, 2001, for feasibility and environmental impact studies for construction of 9 km-long bypass, including two tunnels. Contact Transport Ministry, fax +387 332 50490. Visit 45 221 240 at http://ted.eur-op.eu.int and www.mvp.gov.ba 39/01.

Feasibility studies and detailed design expected to be completed by late-2003 for three twin-tube NATM tunnels Ostrick (270 M), Ozega (400 m) and Tresevine (178 m). Contact Roads Ministry, fax +387 332 50490 for details. 43/01.



Permalink