Integral Inzenjering from Laktasi secured the EUR 93.72 million contract for the design and construction of the Doboj Bypass, section Bridge Rudanka (included) - Tunnel Putnikovo Brdo 2. The contract involves 5.6km of new motorway including all related local roads and the twin tube Putnikovo Brdo 1 (1.6 km) and Putnikovo Brdo 2 (700 m) tunnels, the bridge Rudanka over river Bosna, the viaduct Putnikovo Brdo. Contact Republic of Srpska Motorways’ Ltd, attn Mr. Davor Vuckovic, Banja Luka, tel +387 51 233 670, fax +387 51 233 700, email dvuckovic@autoputevirs.com, info@autoputevirs.com. Visit https://ecepp.ebrd.com/ and https://autoputevirs.com/. 26/21