Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Bosnia and Herzegovina

Bosnia and Herzegovina, Erzegovina-Neretva - ba/19

Road

Closing Date: 24.05.2021 (Tender Closed)


Open invitation to tender, deadline 24/05/2021, for the Geological and Geotechnical Investigation work and preparation of Geotechnical Design (Mission G21) to be prepared for the 12,4 km Prenj tunnel exit (22+1) - Interchange Mostar north (34+5) subsection of the Mediterranean Corridor, Bosnia and Herzegovina - Croatia CVc Road Interconnection. This subsection includes the following major structures:  Tunnel 4 (860/800 m), Tunnel 5 (2290/2210 m), Bridge 8 (230/360 m),  Bridge 9 (320/330 m) and Bridge 10 (380/430 m).  For procurement documents, click here.  The value of the contract is EUR380,000, excluding VAT. Duration of the contract is 8 months. For additional information contact COWI IPF, att Gordana Opalic, Belgrade, email office@wbif-ipf8.eu, where tenders must be sent. For further on TED tender, please click here. Ref.n. 1192/21/GO. 15/21. 

 




Permalink