The JV STRABAG AG (Austria)/Koncar inzenjering za energetiku i transport (Croatia) secured the EUR57.40 million contract, excluding VAT, for construction of Hydro Power Project Vranduk on river Bosna, including a 1.5 km-long power tunnel. The contract includes the design, manufacturing, supply, installation, testing and commissioning of equipment,. Contact Elektroprivreda, attn Mr Edib Basic, Sarajevo, tel + 387 33 751 030, fax + 387 33 751 033, e-mail e.basic@elektroprivreda.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=32373-2016. Ref.n. 7310-PRE-44199. 05/16.