Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Rogaland - no/78

Road and Motorway

Open call for tenders, deadline 30th May, 2006 for consultancy services for plans and environmental impact assessment for the new road Rv 13 between motorway E39 in Stavanger and Strand (Ryfylke connection). The Ryfylke connection consists of two subsea tunnels with two lanes: the 4.5 km Hundvag tunnel and the approx. 14 km Solbakk tunnel, which will replace the existing ferry. The value of the project is approx. NOK4 billion. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=073668-2006, OJ S 70, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986. E-mail bjorn.amdal@vegvesen.no. Also visit www.vegvesen.no/region_vest/prosjekter/rv13_ryfast/index.stm 16/06.Open call for tenders, deadline 7th June, 2006 for seismic studies at sea and on land in connection with the engineering design of the Rogfast subsea tunnel across the Bokna fjord. The tunnel will be from Randaberg to Bokn with a branch to Kvitsoy on motorway E39. A single-tube tunnel is expected, with length ranging from 22.2 to 24.2 km, Norwegian profile T8.5 / T11.5, to be blasted in rock. Estimated start of construction is 2008. Estimated cost of NOK2.6 billion. Click here to see map. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074768-2006, OJ S 71, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986 or 51911791. E-mail rune.stumo@vegvesen.no 16/06.Negotiated procedure, deadline 6th June, 2006 for planning manager for the Rylfylke connection on road Rv 13, which will give the municipalities of Strand, Forsand and Hjelmeland a permanent connection to Nord Jaeren. A permanent connection between the E39 in Stavanger and Solbakk in Strand will altogether span over 20 km long and will comprise of two undersea tunnels (the 4.5 km Hundvag tunnel and the approx. 14 km Solbakk tunnel). A new development plan process with several alternatives and impact assessment must be undertaken for the stretch between Stavanger and Hundvag. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=087003-2006, OJ S 82, or contact Statens vegvesen Region west, Leikanger, fax +74 57655986. Further information about the project, visit www.vegvesen.no/ryfast 20/06.Geomap signed a NOK3 million contract to perform seismic studies at sea and on land in connection with the engineering design of the Rogfast subsea tunnel (22.2 to 24.2 km) across the Bokna fjord. Visit www.geomap.no and www.vegvesen.no/rogfast 36/06.Plan & Prosjektpartner based in Hagan signed a NOK2.8 million contract to manage the planning of the Ryfast connection on road Rv 13. A permanent connection between the E39 in Stavanger and Solbakk in Strand will altogether span over 20 km long and will comprise of two undersea tunnels (the 4.5 km Hundvag tunnel and the approx. 14 km Solbakk tunnel). Visit www.vegvesen.no/ryfast 36/06.Aas-Jakobsen received a NOK7.6 million contract for development plan for Road Rv 13 Stavanger-Solbakk (E39), including two alternatives for two tunnels. Click no/78 for details. Visit www.aas-jakobsen.no 42/06.Open invitation to tender, deadline 05.01.2009, for supplementary seismic refraction surveys for proposed 4.5 km-long Hundvag and 14 km-long Solbakk subsea tunnels on the connection between the E39 in Stavanger and Solbakk in Strand, known as Rv13 Ryfast, under design by Aas-Jakobsen. Contract duration 10.02.2009 to 01.05.2009. Specs and docs from Frode Vagstad, tel +47 5765 5824, e-mail frode-vagstad@vegvesen.no. 48/08. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=302262-2008Open invitation to tender, deadline 05.01.2009, for supplementary foundation surveys, controlled core drilling and seismic tomography for proposed Hundvag and Solbakk subsea tunnels on Rv13 Ryfast. Contract duration 10.02.2009 to 01.05.2009. Specs and docs from Frode Vagstad, tel +47 5765 5824, e-mail frode.vagstad@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303651-2008 48/08.



Permalink

Open invitation to tender, deadline 15.04.2010, for directional core drilling for E39 Rogfast underwater tunnel between Randaberg and Bokn with an arm to Kvitsoy. Further info, specs and docs from Ragnhild Ovrevik at Statens vegvesen Region vest in Leikanger, tel +47 51911527/91156136, e-mail ragnhild.ovrevik@vegvesen.no. Time limit for accessing documents 08.04.2010. Contract duration 27.05.2010-01.12.2010, estimated value EUR868,000-EUR1.1 million. Tenders or requests to participate should be sent to Ragnhild Ovrevik and Ingar Hals. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=049603-2010. 07/10.Open invitation to tender, deadline 15.04.2010, for land and sea seismic refraction surveys and borehole seismic tomography survey for E39 Rogfast underwater tunnel. Further info, specs and docs from Ragnhild Ovrevik at Statens vegvesen Region vest in Leikanger, tel +47 51911527/91156136, e-mail ragnhild.ovrevik@vegvesen.no. Time limit for accessing documents 08.04.2010. Contract duration 01.06.2010-01.12.2010, estimated value EUR868,000-EUR1.1 million. Tenders or requests to participate should be sent to Ragnhild Ovrevik and Ingar Hals. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=049604-2010. 07/10.



Permalink

Contract for land and sea seismic refraction surveys and borehole seismic tomography survey for E39 Rogfast underwater tunnel awarded to GeoPhysix AS of Vettre, value EUR781,500 excluding VAT. More from Ragnhild Ovrevik at Statens vegvesen Region vest in Leikanger, tel +47 81544010, fax +47 57655986, e-mail ragnhild.ovrevik@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205755-2010. 28/10.Rogfast directional core drilling contract awarded to Entreprenorservice AS of Rud, value EUR1.73 million excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=207338-2010. 28/10.



Permalink

Open invitation to tender, deadline 28.03.2011, for planning and engineering design services for 3.7 km-long E39 Eiganes tunnel and 5.6 km and 14 km two-lane tunnels and open air zones on national road 13 Ryfast project from Stavanger to Strand in Ryfylke.Further information from Bjorn Grassdal at Statens vegvesen Region vest in Leikanger, tel +47 81544010, and specs and docs from Stavanger office, tel +47 51911357, e-mail bjogra@vegvesen.no to whom tenders or requests to participate must be sent. Tender documents available for download, user name and password supplied on request. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=046657-2011. 06/11.



Permalink

Open invitation to tender, deadline 01.04.2011, for preparation of development and technical plans for E39 Rogfast connection, including 25 km-long twin-tube submarine tunnel from Harestad in Randaberg municipality to Arsvagen in Bokn municipality as well as a branch to Kvitesoy. Further information from Tor Geir Espedal at Statens vegvesen Region vest in Leikanger, tel +47 81544010, e-mail tor.geir.espedal@vegvesen.no. Specs and docs from Bjorn Amdal, tel +47 95033506, e-mail bjorn.amdal@vegvesen.no to whom tenders or requests to participate must be sent. Tender conference at SV office in Stavanger at 15.00 h on 15.03.2011. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=055071-2011. 07/11.



Permalink

Open invitation to tender, deadline 26.05.2011, for engineering design services in relation to Ryfast, Eiganes tunnel and Rogfast projects. Statens vegvesen Region west wish to hire a planning manager for Rogfast and asst engineering design manager for Ryfast/Eiganes tunnel, together with design and follow-up staff for mass haul, ROS, electrical and electronic works, structures and noise abatement. Further information, specs and docs from Bjorn Grassdal at SV in Leikanger, tel +47 81544010, fax +47 57655986, e-mail bjogra@vegvesen.no to whom tenders or requests to participate must be sent. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=228611. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=125170-2011. 16/11.



Permalink

Award of contract to Multiconsult, value EUR236,000 for E39 Eikas tunnel and Nyborg interchange review of traffic noise at Asane, Bergen. More from ingrid.holst@multiconsult.no, tel +47 55623725. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=193012-2011. 25/11.



Permalink

Prior Information Notice for the information meeting regarding Project E39 Eiganestunnelen and RV13 Ryfast. The meeting will be held 06.09.2012 at Stavanger, in Norwegian language at 10:00 h and then in English at 13:00 h. Value of contract between EUR796-1,061 million. Scheduled date for start of award procedures 15.11.2012. Duration of works from 01.01.2013 to 01.01.2020. Further information, specs and docs from Anne-Merete Gilje at SV in Leikanger, tel +47 81544010, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205662-2012.  27/12.



Permalink

Open invitation to tender, deadline 27.02.2013, for construction of half of the 14.3 km-long Solbakk twin-tube fjord crossing from Solbakk to middle of fjord as contract E02, part of the Ryfast connection. Contract commences 19.04.2013 for completion 20.02.2018, value EUR149-189 million. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=271215. Further information, specs and docs from Anne-Merete Gilje at Statens vegvesen Region vest in Leikanger, tel +47 51911344, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no, to whom tenders or requests to participate must be sent. Time limit for accessing documents 08.02.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=408191-2012. 52/12.



Permalink

Open invitation to tender, deadline 20.03.2013, for coring from a drilling ship to survey a part of the project where there are little or no rock outcrops above sea level. The aim is to reduce uncertainty in terms of construction costs and construction technical execution for E39 Rogfast underwater tunnel project. Contract value range EUR2.0-2.7 million, excluding VAT, duration 01.06.2013-01.03.2014. Further information, specs and docs from Ragnhild Ovrevik Slobodinski at Statens vegvesen Region west in Leikanger, tel +47 51911527, fax +47 57655986, e-mail ragnhild.slobodinski@vegvesen.no, to whom tenders or requests to participate must be sent. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=281226. Time limit for receipt of requests for documents or for accessing documents: 13.03.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=037670-2013. 06/13.



Permalink

Open invitation to tender, deadline 20.03.2013, for E39 Rogfast directional core drilling and seismic tomography from Bokn. Contract value range: EUR537,664 to EUR806,548, excluding VAT, duration 01.06.2013-01.12.2013. Further information, specs and docs from Ragnhild Ovrevik Slobodinski at Statens vegvesen Region west in Leikanger, tel +47 51911527, fax +47 57655986, e-mail ragnhild.slobodinski@vegvesen.no, to whom tenders or requests to participate must be sent. Register interest and obtain additional information at http://www.doffin.no/Search/Search_Switch.aspx?ID=281184. Time limit for receipt of requests for documents or for accessing documents: 13.03.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=037669-2013. 06/13.



Permalink

Postponed from 27.02.2013 to 04.03.2013, the deadline of open invitation to tender for construction of half of the 14.3 km-long Solbakk twin-tube fjord crossing from Solbakk to middle of fjord as contract E02, part of the Ryfast connection. Contract commences 19.04.2013 for completion 20.02.2018, value EUR149-189 million. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=271215. Further information, specs and docs from Anne-Merete Gilje at Statens vegvesen Region vest in Leikanger, tel +47 51911344, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=049415-2013. 07/13.



Permalink

Open invitation to tender, deadline 10.05.2013, for senior/engineer geologist services in relation to Rv13/E39 Eiganes tunnel. Further information, specs and docs from Anne-Merete Gilje at SV in Leikanger, tel +47 02030, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no, to whom tenders or requests to participate must be sent. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=287837. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104169-2013. 13/13.



Permalink

Open invitation to tender, deadline 05.06.2013, for construction of half of the 14.3 km-long Solbakk twin-tube fjord crossing from Hundvaeg to island of Hidle as contract E03, part of the Ryfast connection. Contract commences 01.08.2013 for completion 01.10.2018, value EUR133-195 million. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=289563. Further information, specs and docs from Anne-Merete Gilje at Statens vegvesen Region vest in Leikanger, tel +47 02030, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no, to whom tenders or requests to participate must be sent. Time limit for accessing documents 15.05.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118634-2013. 15/13.

 



Permalink

Marti Norge AS, Marti Contractors Ltd, IAV of Oslo secured the contract for construction of half of the 14.3 km-long Solbakk twin-tube fjord crossing from Solbakk to middle of fjord as contract E02, part of the Ryfast connection. Contact Anne-Merete Gilje at Statens vegvesen Region vest in Leikanger, tel +47 51911344, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=159881-2013. 20/13.



Permalink

Open invitation to tender, deadline 05.08.2013, for evaluation of risk and vulnerability for project E39 Eiganes tunnel and national road 13 Ryfast. Further information, specs and docs from Berit Skjellerudsveen at SV-West Region in Leikanger, tel +47 02030, fax +47 57655986, e-mail berit.skjellerudsveen@vegvesen.no, to whom tenders or requests to participate must be sent. Time limit for receipt of requests for documents or for accessing documents: 05.07.2013. Register interest and obtain additional information at http://www.doffin.no/Search/Search_Switch.aspx?ID=295909. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179293-2013. 23/13.



Permalink

Open invitation to tender, deadline 29.07.2013, for Ryfast and Eiganes tunnel building inspections. Duration of contract 19.08.2013 to 01.01.2019. Time limit for receipt of requests for documents or for accessing documents: 22.07.2013. Further information, specs and docs from Cristopher Cormack at Statens vegvesen Region west in Leikanger, tel +47 48275245, fax +47 57655986, e-mail christopher.cormack@vegvesen.no to whom tenders or requests to participate must be sent. Register interest and obtain additional information at http://www.doffin.no/Search/Search_Switch.aspx?ID=296598. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188902-2013. 24/13.



Permalink

Open invitation to tender, deadline 15.08.2013, for the delivery of computing programming for drilling parameter interpretation, machining, grouping comparison and presentation of drilling data obtained continuously from the tunnel rig (MWD data; Measuring While Drilling) from the tunnel construction at Ryfast. Duration contract two years, with an option for an additional 2+2+1 years, so the total is 7 years. Time limit for receipt of requests for documents or for accessing documents: 19.07.2013. Register interest and obtain additional information at http://www.doffin.no/Search/Search_Switch.aspx?ID=296185. Further information, specs and docs from Anne-Merete Gilje at SV-West Region in Leikanger, tel +47 02030, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=204541-2013. 26/13.



Permalink

Award of contract to Entreprenorservice AS of Rud, Norway, value EUR800,000 excluding VAT, for E39 Rogfast directional core drilling and seismic tomography from Bokn. Further information from Ragnhild Ovrevik Slobodinski at Statens vegvesen Region west in Leikanger, tel +47 51911527, fax +47 57655986, e-mail ragnhild.slobodinski@vegvesen.no.

Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=219210-2013. 27/13.



Permalink

Open invitation to tender, deadline 26.08.2013, for hiring geotechnologist for E39 Eiganes tunnel/Rv13 Ryfast. Duration of contract 08.10.2013 to 01.12.2017. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=299335. Time limit for receipt of requests for documents or for accessing documents: 23.08.2013. Further information, specs and docs from Statens vegvesen Region vest, att.n Dag Johannes Daland, Leikanger, tel +47 02030, fax +47 57655986, e-mail dag.daland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=220863-2013. Bid n. 299375. 27/13.



Permalink

Open invitation to tender, deadline 04.09.2013, for E39 Rogfast directional core drilling from a drilling ship. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=299194. Range value contract range EUR4.36-6.23 million. Duration of contract from 01.11.2013 to 30.04.2014. Further information, specs and docs from Statens vegvesen, Region West, attn Ragnhild Ovrevik Slobodinski, Leikanger, tel +47 51911527, fax +47 57655986, e-mail ragnhild.slobodinski@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=225498-2013. 28/13.



Permalink

Open invitation to tender, deadline 26.08.2013, for engineering geologist/control engineers for three tunnels on the Ryfast connection, starting Q4 2013, Q1 2014 and Q2 2014 for completion 2017/2018. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=299225. Further information, specs and docs from Anne-Merete Gilje at Statens vegvesen Region vest in Leikanger, tel +47 02030, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no, to whom tenders or requests to participate must be sent. Time limit for accessing documents 20.08.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=223286-2013. 28/13.



Permalink

Award of contract to Multiconsult AS of Sandnes, Norway for senior/engineer geologist services in relation to Rv13/E39 Eiganes tunnel. Further information from Anne-Merete Gilje at SV in Leikanger, tel +47 02030, fax +47 57655986, e-mail anne-merete.gilje@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=306335-2013. 37/13.



Permalink

Open invitation to tender, deadline 31.10.2013, for pressure sensors to be installed in rock wells, uncompacted wells and pore pressure meters, for automatic monitoring of groundwater levels above the 3.7km E39 Eiganes tunnel. Duration of contract 01.02.2014 to 01.01.2019. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=305321. Time limit for receipt of requests for documents or for accessing documents: 30.10.2013.  Further information, specs and docs from Statens vegvesen Region vest, att.n Dag Johannes Daland, Leikanger, tel +47 02030, fax +47 57655986, e-mail dag.daland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=314849-2013. 38/13.



Permalink

Multiconsult AS of Sandnes secured the contract for senior/engineer geologist services in relation to Rv13/E39 Eiganes tunnel. Contact Anne-Merete Gilje at SV in Leikanger, tel +47 02030, e-mail anne-merete.gilje@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=306335-2013. 39/13.



Permalink

Open invitation to tender, deadline 06.11.2013, for supplemental refraction seismic surveys in the sea in connection with the work on E39 Rogfast. From earlier studies there is reported a strong current in Boknafjorden. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=306093. Time limit for receipt of requests for documents or for accessing documents: 30.10.2013. Contract value EUR185,775-210,552 excluding VAT, duration 08.01.2014 to 30.5.2014. Further information, specs and docs from Statens vegvesen, Region West, attn Ragnhild Ovrevik Slobodinski, Leikanger, tel +47 02030, fax +47 57655986, e-mail ragnhild.slobodinski@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=323403-2013. 39/13.



Permalink

Open invitation to tender, deadline 08.11.2013, for pressure sensors for installation in rock wells, uncompacted wells and pore pressure meters for E39 Eiganes tunnel/Rv13 Ryfast. Duration of contract 01.02.2014 to 01.01.2019. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=306448. Time limit for receipt of requests for documents or for accessing documents: 07.11.2013. Further information, specs and docs from Statens vegvesen Region vest, att.n Dag Johannes Daland, Leikanger, tel +47 02030, fax +47 57655986, e-mail dag.daland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=327200-2013. Ref. n. 2013104429. 40/13.



Permalink

Hr Prosjekt As of Fornebu secured the contract for Ryfast and Eiganes tunnel building inspections. Further information, specs and docs from Cristopher Cormack at Statens vegvesen Region west in Leikanger, tel +47 48275245, fax +47 57655986, e-mail christopher.cormack@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=341364-2013. 41/13.



Permalink

HOJ Consulting of Brunnen, Switzerland secured the EUR76,000 contract, excluding VAT, for E39 Eiganes tunnel and national road 13 Ryfast evaluation of risk and vulnerability. More from e-mail niels.hoj@hoj.ch and Berit Skjellerudsveen at Statens vegvesen Region west in Leikanger, tel +47 02030, fax +47 57655986, e-mail berit.skjellerudsveen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=355983-2013. 43/13.



Permalink

Open invitation to tender, deadline 07.01.2014, for assistant engineering design manager E39 Rogfast. Register interest at http://www.doffin.no/Search/Search_Switch.aspx?ID=310922. Time limit for receipt of requests for documents or for accessing documents: 06.01.2014. Contract duration 01.03.2014 to 31.12.2023. Further information from Statens vegvesen, Region West, attn Tor Geir Espedal, Leikanger, tel +47 02030, fax +47 57655986, e-mail tor.geir.espedal@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=394284-2013. Ref.n. 2013131956. 47/13.



Permalink

VTT Maritime AS of Bergen, an affiliate of Continental Energy Corporation, has been awarded a contract valued at EUR7.6 million by the Norwegian Road Authority for a portion of NorRoad's planned highway E39 improvement project. VTT will provide sea mapping, seismic surveying and measurement wire drilling at the site of a major subsea tunnel location. VTT Maritime AS will drill three holes of about 1,000 m in the deepest point of the planned tunnel route from Kvitsoy. Visit http://www.vegvesen.no/Europaveg/e39rogfast/Nyhetsarkiv/Underteikna+stor+kontrakt+med+VTT+Maritime+AS.566568.cms and www.vtt.no. 04/14.



Permalink

Open invitation to tender, deadline 02.04.2014, for the construction of the Hundvag tunnel (contract E05), part of the Rv13 Ryfast. The Hundvag tunnel is a 5.7 km-long two lane tunnel, partially under sea and partially under land. Range value EUR108 - 132 million, excluding VAT. Contract duration 01.05.2014 to 01.10.2018. Time limit for receipt of requests for documents or for accessing documents: 28.02.2014. Further information from Anne-Merete Gilje, Statens Vegvesen, Leikanger, tel +47 91708849, e-mail anne-merete.gilje@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=052601-2014. Ref. 2014007539. 08/14.



Permalink

Open invitation to tender, deadline 24.04.2014, for planning and design of the E39, Rogfast, from Harestad in Randaberg municipality to Laupland in Bokn municipality. Range value EUR8.42 – 18.05 million, excluding VAT. Contract duration 02.06.2014 to 31.12.2024. Time limit for receipt of requests for documents or for accessing documents: 28.03.2014. Tender documents with attachments may be downloaded from eRoom. Permission to access eRoom can be obtained by sending an email to: bjogra@vegvesen.no. Further information from Bjorn Chr. Grassdal, Statens Vegvesen Region vest, Leikanger, tel +47 02030, fax +47 51536829, e-mail bjogra@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056428-2014. Ref. 2014009178. 08/14.



Permalink

Open invitation to tender, deadline 08.04.2014, for purchase of geomatic services for Ryfast project, including RV13 Ryfylke tunnel and E39 Eigan tunnel. Range value EUR265,628-386,372, excluding VAT. Contract duration 01.06.2014 to 01.06.2016. Time limit for receipt of requests for documents or for accessing documents: 31.03.2014. Electronic submission of tenders and requests to participate: https://kgv.doffin.no/ctm/Supplier/Notice/243402. Further information from Geir Stromstad, Statens Vegvesen Western region, Leikanger, tel +47 02030, fax +47 57655986, e-mail geir.stromstad@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=069020-2014. Ref. 2014009946. 09/14.



Permalink

Vagstad Prosjektservice AS of Leikanger secured the EUR723,466 contract, excluding VAT, engineering design manager to assist with preparation of tender documents for E39 Rogfast. Duration of contract six years. Contact Statens Vegvesen Region West, att.n Tor Geir Espedal, Leikanger, tel + 47 90922692, e-mail tor.geir.espedal@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=119628-2014. Ref. n. 2013131956. 15/14.



Permalink

Open invitation to tender, deadline 13.06.2014, for services for underwater mapping for the tunnel projects national road 13, national road 13 Ryfylke tunnel and E39 Eiganes tunnel. The project includes the disposal of large amounts of tunnel matter on the seabed, in various places in the fjord basin around Stavanger. Range value EUR72,685-109,028, excluding VAT. Contract duration 01.08.2014 to 01.08.2016. Electronic submission of tenders and requests to participate: https://kgv.doffin.no/ctm/Supplier/Notice/248100. Further information from Geir Stromstad, Statens Vegvesen Western region, Leikanger, tel +47 02030, fax +47 57655986, e-mail geir.stromstad@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=148660-2014. Ref. 2014030047-3. 18/14.



Permalink

Geomap AS of Lorenskog secured the EUR117,441.56 contract, excluding VAT, for  supplemental refraction seismic surveys in the sea in connection with the work on E39 Rogfast. From earlier studies there is reported a strong current in Boknafjorden. Contact Statens vegvesen, Region West, Leikanger, tel +47 02030, fax +47 57655986, e-mail firmapost-vest@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158261-2014. 20/14.



Permalink

Kruse Smith AS and Risa AS of Stavanger secured the EUR126.84 million contract, excluding VAT, for the construction of the Hundvag tunnel (contract E05), part of the Rv13 Ryfast. The Hundvag tunnel is a 5.7 km-long two lane tunnel, partially undersea. Contact Anne-Merete Gilje, Statens Vegvesen Western region, Leikanger, tel +47 91708849, e-mail anne-merete.gilje@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=211151-2014. Ref. 2014007539. 26/14.



Permalink

Prior information notice for an electro procurement, including the delivery of the technical equipment, installation and commissioning, for the project national road 13 Ryfast and E39 Eiganestunnelen. The procurements will be made as open or restricted tender contests. The provisional schedule for the procurements is: announcement for the 14.3 km submarine Ryfylke tunnel on 01.07.2015, with contract signing on 01.04.2016; announcement for the 3.7 km Eiganes tunnel and for the 5.5 km submarine Hundvag tunnel on 01.02.2016, with contract signing on 01.09.2016. Scheduled date for start of award procedures: 01.07.2015.

The information meeting will be held on 25.2.2015 at the Ryfast office in Tjodolvs gate 23, Stavanger, Norway. Register with sondre.storkersen@vegvesen.no before 23.02.2015.

During the meeting there will also be brief information on other major upcoming electro procurements for tunnels in the western region: E39 Radal-Svegatjorn, E39 Rogfast, E39 Stangeland-Hove and several existing tunnels where the electrotechnical equipment shall be upgraded.

Further information from Gunnar Eiterjord, Statens Vegvesen Western region, Leikanger, tel +47 91877089, fax +47 57655986, e-mail gunnar.eiterjord@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=40856-2015. 06/15.



Permalink

Bunndata A/S of Boknper secured the EUR182,030 contract, excluding VAT, for services for underwater mapping for the tunnel projects national road 13, national road 13 Ryfylke tunnel and E39 Eiganes tunnel. The project includes the disposal of large amounts of tunnel matter on the seabed, in various places in the fjord basin around Stavanger. Contact Statens Vegvesen Western region, Leikanger, tel +47 91502030, fax +47 57655986, e-mail firmapost-vest@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=65685-2015. Ref. 2014030047-3. 09/15.



Permalink

Open invitation to tender, deadline 04.05.2015, for Assistant Project Manager for the Ryfast/Eiganes tunnel. Range value EUR 462,733-694,208, excluding VAT. Contract duration 13.07.2015 to 13.07.2020. Contact Statens Vegvesen Region West, attn Aksel Grunnreis, Leikanger, tel +47 95059681, fax +47 57655986, e-mail aksel.grunnreis@vegvesen.no. Electronic access to information at https://kgv.doffin.no/ctm/Supplier/Documents/Folder/129008. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=86289-2015. Ref. 2014148689. 11/15.



Permalink


Restricted invitation to tender, deadline 04.09.2015, for pre-qualification for electrical procurement for the submarine Ryfylke tunnel, part of Rv13 Ryfast project, contract 09. Duration of contract from 01.04.2016 to 01.02.2019, value EUR21.97-32.95 million, excluding VAT. For electronic access to information, visit https://kgv.doffin.no/ctm/Supplier/Documents/Folder/131032. Contact Sondre Storkersen, Statens Vegvesen, Western region, Leikanger, e-mail sondre.storkersen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=236327-2015. Ref.n. 2015012003. 28/15.




Permalink


The deadline for the restricted invitation to tender has been postponed to 12.02.2016 for the supply, installation and operation of electrical equipment for the tunnel Ryfylke (riverbed is 15.3 km), which is part of the project RV13 Ryfast, contract 09. Duration of the contract is from 01.04.2016 to 01.02.2019, the value EUR21.97-32.95 million, excluding VAT. For electronic access to information, visit https://kgv.doffin.no/ctm/Supplier/Documents/Folder/131032. Contact Statens Vegvesen, Western region, att.n Lars Martin Rage, Leikanger, e-mail lars.rage@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=398800-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=429552-2015. Ref.n. 2015012003. 50/15.




Permalink


Open invitation to tender, deadline 22.01.2016, for core drilling at Randaberg, Kvitsoy, Kraga and Arsvagen (the last 2 named locations as an option) in order to map the geological conditions in the routes for planned ventilation shafts/ventilation tunnels of the E39, Rogfast. Contract duration from 26.02.2016 to 20.05.2016. Electronic access to information: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/138572. Further information from Frode Vagstad, Statens Vegvesen Region West, Leikanger, e-mail frode.vagstad@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=434770-2015. Ref. n. 15/246468. 52/15.




Permalink


Additional information for the restricted invitation to tender, deadline 12.02.2016, for pre qualification for the supply, installation and operation of electrical equipment for the tunnel Ryfylke (riverbed is 15.3 km), which is part of the project RV13 Ryfast, contract 09. Deadline for clarification and questions is the 15th January 2016. Contact Statens Vegvesen, Western region, att.n Lars Martin Rage, Leikanger, e-mail lars.rage@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=9030-2016. Ref.n. 2015012003. 02/16.




Permalink


VPS (Vagstad prosjektservice) at Leikanger secured the EUR   461,967 contract, excluding VAT, for Assistant Project Manager for the Ryfast/Eiganes tunnel Contact the Norwegian Public Roads Administration, Region West, attn Aksel Grunnreis, Leikanger, tel +47 95059681, fax +47 57655986, e-mail aksel.grunnreis@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=12467-2016. Ref. 2014148689. 02/16.




Permalink

HR Prosjekt AS of Oslo has secured the EUR104,855 contract, excluding VAT, as the consultants for tunnel safety for the E39 Rogfast project. The duration of  the contract  is 6 years. For further information contact the Norwegian Public Roads Administration, Western Region, att.n Tor Geir Espedal, Leikanger, tel + 47 90922692, fax +47 57655986, e-mail firmapost-vest@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=164050-2016. Ref. n. 2013131956. 20/16.



Permalink


Roxel Group AS from Stavanger secured the contract for the supply, installation and operation of electrical equipment for the Ryfylke tunnel (the riverbed is 15.3 km), this is part of the project RV13 Ryfast, contract 09. For electronic access to information, visit https://kgv.doffin.no/ctm/Supplier/Documents/Folder/137701. Contact Statens Vegvesen, Western region, att.n Lars Martin Rage, Leikanger, e-mail lars.rage@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=176381-2016. Ref.n. 15/205870. 21/16.




Permalink


Open invitation to tender, deadline 09.09.2016, for the purchase of tunnel ventilators for the E39 Eiganes tunnel and Rv 13 Hundvag and Ryfylke tunnel. Value of the contract is EUR2.89 million, excluding VAT. Contact Statens Vegvesen Region West, attn Lars Martin Rage, Leikanger, tel +47 48041420, fax +47 57655986, e-mail lars.rage@vegvesen.no. Electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/145763. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=227220-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=240852-2016. Ref. 16/79787. 28/16.




Permalink

Postponed from 09.09.2016 to 30.09.2016 the deadline for the open invitation to tender  for the purchase of tunnel ventilators for the E39 Eiganes tunnel and Rv 13 Hundvag and Ryfylke tunnel. Value of the contract is EUR2.89 million, excluding VAT. Contact Statens Vegvesen Region West, attn Lars Martin Rage, Leikanger, tel +47 48041420, fax +47 57655986, e-mail lars.rage@vegvesen.no. Electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/145763. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291933-2016. Ref. 16/79787. 34/16



Permalink

Restricted invitation to tender, deadline 14.10.2016, for electrical procurement for Eiganes and Hundvag tunnel (Contract 10). Value of the contract is EUR16.18-32.36 million, excluding VAT. Duration of the contract is from 01.12.2016 to 01.04.2019. Contact  Norwegian Public Roads Administration, Region West, attn Lars Martin Rage, Leikanger, tel +47 48041420, fax +47 57655986, e-mail lars.rage@vegvesen.no. Electronic access to information: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/146341. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=320210-2016, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=240845-2016  and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=083854-2016. Ref. 15/251559. 38/16



Permalink

Pre-qualification for restricted procedure to tender, deadline 10.11.2016, for the construction of the Kvitsoy tunnel (4 km), the middle section of the Boknafjord tunnel (E 39 Rogfast) approx. 8 km of 2 lane marine tunnel and 2 km of open air road and 5 minor bridges. Range value EUR290-335 million, excluding VAT. Contract duration from 01.09.2017 to 01.09.2024. Electronic access to information: https://kgv.doffin.no/ctm/Supplier/Documents/Folder/148009. Further information from Sveinung Brude, Statens Vegvesen Region West, Leikanger, tel +47 47847633, fax +47 57655986, e-mail firmapost-vest@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=337953-2016. Ref. n. 16/74723. 40/16.



Permalink

The awarding procedure for the construction of the Kvitsoy tunnel (4 km), the middle section of the Boknafjord tunnel (E 39 Rogfast) approximately  8 km of a 2 lane marine tunnel and 2 km of open-air road and 5 minor bridges, has been discontinued. Further information from Sveinung Brude, Statens Vegvesen Region West, Leikanger, tel +47 47847633, fax +47 57655986, e-mail firmapost-vest@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=350682-2016. Ref. n. 16/74723. 41/16.




Permalink

Open invitation to tender, deadline 28.09.2017, for the E39 Rogfast - contract E13 including engineering design and construction of a side tunnel with 2 sections side by side of 1,980 m in Arsvegen. The side tunnel shall be used for transportation during the contract of the E04 which involves  construction of the Boknafjord tunnel (27 km) towards Kvitsoy. The side tunnel, during the operation, will be used as a ventilation tunnel. The duration of the contract is from 30/11/2017 to 15/03/2019.

The E39 Rogfast project is divided into E02, E03, E04, E11, E13 and E06 contracts. The new E39 Rogfast is part of a ferry-free connection along the West coast, linking North and South Rogaland together. The development is to achieve a ferry-free crossing of Boknafjorden and to develop the E 39 between Stavanger and Trondheim. Rogfast consists of the 27km Boknafjord tunnel from Harestad to Laupland as well as a 4 km long tunnel arm to Kvitsoy.  For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/156064. Contact the Norwegian Public Roads Administration, Western Region, att.n Svein Tore Drevsjø, Leikanger,  tel +47 90247929, email svein.drevsjo@vegvesen.no.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=269190-2017. Ref. n. 17/92218. 32/17.



Permalink

Postponed from 28.09.2017 to 05.10.2017 the deadline for the open invitation to tender, for the E39 Rogfast - contract E13 including engineering design and construction of a side tunnel with 2 sections side by side for 1,980 m in Arsvegen. The side tunnel shall be used for transportation during the contract of the E04 which involves  construction of the Boknafjord tunnel (27 km) towards Kvitsoy. The side tunnel, during the operation, will also be used as a ventilation tunnel. The duration of the contract is from 30/11/2017 to the 15/03/2019.

The E39 Rogfast project is divided into E02, E03, E04, E11, E13 and E06 contracts. The new E39 Rogfast is part of a ferry-free connection along the West coast, linking North and South Rogaland together. The development is to achieve a ferry-free crossing of Boknafjorden and to develop the E 39 between Stavanger and Trondheim. Rogfast consists of the 27km Boknafjord tunnel from Harestad to Laupland as well as a 4 km one for further information contact https://kgv.doffin.no/ctm/Supplier/Documents/Folder/156064 Also contact the Norwegian Public Roads Administration, Western Region, att.n Svein Tore Drevsjø, Leikanger,  tel +47 90247929, email svein.drevsjo@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339105-2017. Ref. n. 17/92218. 35/17.



Permalink

Open invitation to tender, deadline 13.10.2017, for procurement of a computer programme for interpreting MWD (Measuring While Drilling) data for the Rogfast E39 project. The tunnel will have several attack points with up to 12 rigs in operation simultaneously. Duration of the contract is  84 months. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/156845. Contact the Norwegian Public Roads Administration, Western Region, att.n Ole Christian Espedal, Leikanger,  tel +47 95997892, email ole.christian.espedal@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=353577-2017. Ref. n. 17/79309. 38/17.



Permalink

Open invitation to tender, deadline 01.12.2017, for the E39 Rogfast - contract E11 including construction of a 700 m side tunnel from the beach zone on property 50/4 Randaberg municipality, westwards towards the main Rogfast tunnel (Boknafjord tunnel). The side tunnel is to be built in order to enable the transport of spoil from subsequent contracts directly to a regulated filling area at Mekjarvik. The duration of the contract is 13 months. The value of the contract is EUR10.89 million , excluding VAT. For bid documents https://kgv.doffin.no/ctm/Supplier/Documents/Folder/157573. Contact the Norwegian Public Roads Administration, Western Region, att.n Svein Tore Drevsjo, Leikanger,  tel +47 90247929, email svein.drevsjo@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399497-2017. Ref. n. 17/3647. 42/17.



Permalink

Amberg Norge AS from Lysakerdi secured the EUR482,956.80 contract, excluding VAT, for the procurement of equipment and software for seismic surveys in a tunnel for the E39 project in Rogfast. For further information contact the Norwegian Public Roads Administration, Western Region, att.n Ole Christian Espedal, Leikanger, email ole.christian.espedal@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=483139-2017.

Ref. n. 16/192333. 48/17.



Permalink

NCC Norge AS at Oslo secured the EUR18.9 million contract, excluding VAT, for the E39 Rogfast - contract E13, including engineering design and construction of a side tunnel with 2 sections side by side of 1,980 m in Arsvegen. The side tunnel will be used for transportation during the contract of the E04 which involves  construction of the Boknafjord tunnel (27 km) towards Kvitsoy. The side tunnel, during the operation, will be used as a ventilation tunnel. Contact the Norwegian Public Roads Administration, Western Region, att.n Svein Tore Drevsjo, Leikanger,  tel +47 90247929, email svein.drevsjo@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=495220-2017 and https://www.vegvesen.no/en/roads/Roads+and+bridges/Road+projects/e39coastalhighwayroute/news/first-tunnel-contract-signed-for-rogfast. Ref. n. 17/92218. 01/18.



Permalink

Anko AS from Sandnes secured the contract for geomatics services for the tunnel projects Ryfylke on Rv13, Eiganes on E39, for the E39 Algard-Hove and the  Rv 509 Transport corridor west. Contact Norwegian Public Roads Administration, att.ne Sondre Størkersen, Oslo, tel +47 91607745, email sondre.storkersen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=310020-2018.

Ref.n. 18/8150. 30/18



Permalink

Negotiated invitation to tender, deadline 21.11.2018, for the construction of the 4km Kvitsøy tunnel and middle section of the 8km Boknafjord tunnel (contract E02). The contract comprises drill and blast tunnelling , securing of the tunnel, as well as road construction and all internal works in the tunnel excluding any electro installations. Also included in the contract are open air road and bridge works, concrete works and vertical shafts for ventilation. In addition, stone deposits will be established and secured in the sea. The tender conference will take place 16.10.2018, meeting at the project office in Mekjarvik, Contract duration to 21/09/2026. For electronic access to information

https://kgv.doffin.no/ctm/Supplier/Documents/Folder/148009 where offers have to be sent. Contact Norwegian Public Roads Administration, Western Region, att.n Sveinung Brude, Etterstad, email sveinung.brude@vegvesen.no.

Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=437806-2018.

Ref. n. 17/176164. 41/18.



Permalink

Implenia AS and Stangeland Maskin AS, Marti Tunnel AG, PNC Norge AS, Salini Impregilo SpA, Skanska Norge AS are the 5 contractors (3 Norwegian and 2 foreigners) who asked to be prequalified for the E02 Contract, involving construction the 4km Kvitsoy tunnel and the middle section of the Boknafjord tunnel, on the E39 Rogfast. This is the biggest of Rogfast’s contracts and the contract with the longest and deepest tunnel. The contract value is between EUR311.30-363.18 million (NOK3-3.5 bn).

The eligibility for the task will now be assessed and by March 2019 three companies will be selected to present their offers. Contact Norwegian Public Roads Administration, attn Tor Geir Espedal, tel +47 909 22 692, email  tor.geir.espedal@vegvesen.no. Visit

https://www.vegvesen.no/Europaveg/e39rogfast/Nyhetsarkiv/fem-interesserte-i-rogfast-kontrakt.

49/18.




Permalink

The Norwegian Public Roads Administration has invited the 3 contractors Implenia / Stangeland AS, Marti tunnel AG and Skanska Norge AS to participate in the competition for the largest E39 Rogfast contract. They have to calculate and deliver the price offer by 25.03.2019. The contract is estimated at EUR306.74-357.86 million (NOK 3-3.5 billion). The contract is to build a 20-km tunnel and two ventilation shafts of 10 m each in diameter.

Click here for the Rogfast alignement. Visit https://www.vegvesen.no/Europaveg/e39rogfast/Nyhetsarkiv/tre-entreprenorar-er-inviterte.

11/19.


https://www.vegvesen.no/_attachment/1865792/binary/1285179?fast_title=Oversiktstegning+Rogfast+%284+MB%29.pdf




Permalink

Open invitation to tender, deadline 22.05.2019, for the delivery and installation of an interdisciplinary marking system for the Eiganes, Hundvag and Ryfylke tunnels on the E39 and Rv13. The objective of the tender contest is to enter a contract for an overall branding system for the listed tunnels. The marking includes primarily doors, hatches, gates and other equipment listed in the attached lists on scope. A tender conference will be held 24.4.2019 (12:00), Tjodolvs gate 23, Stavanger. For bid documents http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=236785&B=VEGVESEN

where offers must be sent. Contact Norwegian Public Roads Administration, attn Sondre Storkersen, Oslo, email sondre.storkersen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=163815-2019.

Ref. 19/35772. 15/19.



Permalink

Roxel Infra AS from Stavanger secured the EUR74,315.48 (NOK744,235) contract, excluding VAT,  for the delivery and installation of an interdisciplinary marking system for the Eiganes, Hundvag and Ryfylke tunnels on the E39 and Rv13. The objective of the tender contest is to enter a contract for an overall branding system for the listed tunnels.

The marking includes primarily doors, hatches, gates and other equipment listed in the attached lists on scope. Contact Norwegian Public Roads Administration, attn Sondre Storkersen, Oslo, email sondre.storkersen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399667-2019.

Ref. 19/35772. 34/19.



Permalink

CANCELLED TENDER - The competition for the construction of the 4km Kvitsoy tunnel and middle section of the 8km Boknafjord tunnel (contract E02) has been cancelled because received tenders exceed the contracting authority's budget.

Contact Norwegian Public Roads Administration, Western Region, att.n Sveinung Brude, Etterstad, email sveinung.brude@vegvesen.no. For tender documents click here.  
Ref. n. 17/176164. 43/19.



Permalink


Competitive procedure with negotiation, deadline 08/03/2021, for the construction of the 4 km Kvitsoy tunnel and 2 km of new County Road (Contract E15), part of the E39 Rogfast project. A tender conference and site inspection will be held on 27/01/2021. End of contract will be 08/05/2024. For tender documents please use this link http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=290489&B=VEGVESEN, where tenders must be sent.  Contact Norwegian Public Roads Administration, attn Sveinung Brude, Lillehammer, email sveinung.brude@vegvesen.no. For tender information please click here.  Ref. n. 20/14167. 02/21. 

 




Permalink


The following companies have submitted offers for the new power cables and new light fixtures to be installed in 5 tunnels, located on the 15 km long stretch of the national road Rv 13 in Suldal municipality (Rogaland): 

  • Roxel Infra AS: EUR 455,096.84 (NOK4,799,060.97) 
  • Bilfinger Norway AS: EUR465,196.28 (NOK4,905,297.00);  
  • OneCo Infra AS: EUR 521,789.92 (NOK5,501,796.14);
  • Otera Traftec AS: EUR535,622.07 (NOK5,647,643.50);  
  • Aventi Installation: AS EUR628,365.07 (NOK6,625,599.64); 
  • NLI Elektrosystemer AS: EUR752,361.94 (NOK7,932,415.00) 

 

The offer prices are excluding VAT. Roxel Infra from Stavanger is the lowest. Norwegian Public Roads Administration  will ensure the quality and control the offer, and aim to sign a contract with the new contractor as soon as possible. The job must be completed before the end of the year.  

The tunnels Suldalsporten (733 m) will get 34 new luminaires, Vågs (837 m) will get 39, Mokleivåsen (449 m) 24, Vika (1188 m) 53 and Falkali (1202 m) will get 53 new luminaires.  

Visit https://www.vegvesen.no/om-oss/presse/aktuelt/2021/08/betre-lys-i-fem-tunnelar-pa-riksveg-13-seks-firma-vil-gjera-jobben/. 34/21. 



Permalink


Haehre Entreprenor AS (55%) and Risa AS (45%) secured the EUR59.08 (NOK622) million contract to build the 3,480 m Kvitsoy tunnel on E15, part of the E39 Rogfast project . The tunnel will run at a slope of 7% down to the main section of the Rogfast tunnel.  The contract includes the construction of 1.6 km of road during the day and three bridges on the small island out in the ocean gap in Boknafjorden between Stavanger and Haugesund. The contract  will start during September.  Contact Norwegian Public Roads Administration, attn Sveinung Brude, Lillehammer, email sveinung.brude@vegvesen.no. Visit https://www.vegvesen.no/vegprosjekter/europaveg/e39rogfast/nyhetsarkiv/hahrerisa-tildelt-kvitsoy-kontrakten /.  Ref. n. 20/14167. 34/21. 



Permalink


The Joint Venture Haehre Entreprenor AS from Vikersund and  Risa AS from Avaldsnes secured the  EUR 60.58 million (NOK591.87 million) contract, excluding VAT, for the construction of the 4 km Kvitsoy tunnel and 2 km of new County Road (Contract E15), part of the E39 Rogfast project. Contact Norwegian Public Roads Administration, attn Sveinung Brude, Lillehammer, email sveinung.brude@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=528902-2021.  Ref. n. 20/14167. 42/21. 



Permalink


Competitive procedure with negotiation, deadline 07/01/2022, for the construction of the southern section of the Rogfast main tunnels from Harestad to the Kvitsoy contract (Contract E03).   

The E03 contract comprises the southern section of the tunneling works, with approximately 9 km of twin tunnels to be driven with a grade of 5%.  

A tender conference and site inspection will be held on 16/12/2021, meet at the project office in Mekjarvik at 10.00. The tender conference will be held in Norwegian. End of contract will be 01/06/2030. For tender documents please click here, where tenders must be sent.  Contact Norwegian Public Roads Administration, attn Fredrik Wolstad, Moss, email firmapost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=607336-2021.   Ref. n. 21/226747. 47/21.

 


Norway-Moss: Construction work

2021/S 230-607336

Contract notice

Works

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses

Official name: Statens vegvesen
National registration number: 971 032 081
Postal address: Skoggata 19
Town: Moss
NUTS code: NO Norge
Postal code: 1500
Country: Norway
Contact person: Fredrik Wølstad
E-mail: firmapost@vegvesen.no
Internet address(es):
Main address: http://www.vegvesen.no
Address of the buyer profile: https://eu.eu-supply.com/ctm/Company/CompanyInformation/Index/249176

I.3)Communication

The procurement documents are available for unrestricted and full direct access, free of charge, at: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=316500&B=VEGVESEN

Additional information can be obtained from the abovementioned address

Tenders or requests to participate must be submitted electronically via: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=316500&B=VEGVESEN

Tenders or requests to participate must be submitted to the abovementioned address

I.4)Type of the contracting authority

Ministry or any other national or federal authority, including their regional or local subdivisions

I.5)Main activity

General public services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

E39 Rogfast. Contract E03 – Tunneling southern section from Harestad to Kvitsøy contract. E03/E02

Reference number: 21/226747

II.1.2)Main CPV code

45000000 Construction work

II.1.3)Type of contract

Works

II.1.4)Short description:

The tender documentation is for contract E03, which comprises the southern section of the main tunnels from Harestad to the Kvitsøy contract. The E03 Contract comprises the southern section of the Rogfast tunneling works. The Rogfast tunnel consists of 2 single direction undersea tunnels, from Harestad in the Randaberg municipality to Laupland in the Bokn municipality, with interconnecting passages, and a connecting tunnel as well as some local roads for the island of Kvitsøy. For more information see the Rogfast project website: www.vegvesen.no/Vegprosjekter/Europaveg/E39Rogfast

II.1.5)Estimated total value

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.2)Additional CPV code(s)

45221246 Undersea tunnel construction work

II.2.3)Place of performance

NUTS code: NO Norge

II.2.4)Description of the procurement:

The E03 contract comprises the southern section of the tunneling works, with approximately 9 km of twin tunnels, the tunnel is to be driven with a grade of 5%. An earlier preliminary works contract has established an access tunnel between the filling area and main tunnels. The main tunnels are to be blasted ca 8 km north from the access tunnel, and 1 km north towards Harestad. The tunneling works comprise blasting and excavation of the tunnels, as well as geological stabilizing (rock bolting, shotcrete etc), injection works and waterproofing of the tunnels (membranes, and precast elements), roadworks in the tunnels, and construction of the technical buildings, pump stations etc. The contract also includes the tunnel portals, and 125 m of highway in Harestad, as well as

construction of sea filling with the excavated rock from the tunneling.

II.2.5)Award criteria

Price is not the only award criterion and all criteria are stated only in the procurement documents

II.2.6)Estimated value

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

End: 01/06/2030

This contract is subject to renewal: no

II.2.9)Information about the limits on the number of candidates to be invited

Envisaged minimum number: 3

Maximum number: 5

Objective criteria for choosing the limited number of candidates:

Selection amongst the qualified tenderers will be based on the contracting authority's evaluation of

which of the qualified tenderers in total best fulfil the following selection criteria: The tenderer's technical and professional qualifications in accordance with the qualification requirements, point 2.4.1.

II.2.10)Information about variants

Variants will be accepted: no

II.2.11)Information about options

Options: no

II.2.13)Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: no

II.2.14)Additional information

A tender conference and site inspection will be held on 16.12.2021, meet at the project office in Mekjarvik at 10.00. The tender conference will be held in Norwegian. The tender conference can be held digitally due to the Covid-19 situation.

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation

III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers

List and brief description of conditions:

Tenderers must be a legally established company or consist of a group of suppliers who are legally established companies. The requirement also applies to business that the tenderer relies on. Documentation requirement: 1. Certificate from the Register of Business Enterprises, or equivalent certificate of legal registration in the country where the tenderer, or the companies that jointly represent

the tenderer, c.f. point 4.2 is established. This also applies to all sub-suppliers, cf. point 4.1

Documentation requirement: 2. Completed table in chapter E1 point 3.1 and possibly points 3.2 and 3.3.

III.1.2)Economic and financial standing

List and brief description of selection criteria:

Tenderers must have adequate economic and financial capacity to comply with the contractual obligations and fulfil the following requirements: 1. Equity min. NOK 100 million. 2. An average annual turnover of minimum NOK 500 million for the last three financial years. 3. Tenderers must have an equity ratio of at least 10 %.

Minimum level(s) of standards possibly required:

See the tender documentation for detailed information.

III.1.3)Technical and professional ability

List and brief description of selection criteria:

Tenderers must have sufficient experience of a relevant nature and degree of difficulty from the following work: 1. Construction of drill and blast tunnels, as well as tunnel stabilizing and injection works. 2. Construction of sea filling including barge works, and rock seawalls. If the tenderer intends on using a subcontractor and the subcontractors experience to qualify for the works, the tenderer must include relevant documentation, see point B2, section 4.1.

Experience from clients other than the NPRA will also be assessed as relevant.

Tenderers must have a system that shows that they work pro-actively to ensure safety, health and working environment (HMS), with relevance for equivalent work included in this tender contest. The system will be subject to periodic reviews.

Tenderers, and the suppliers the tenderer will rely on to fulfil the requirement for technical and professional qualification in B2 point 2.4, cf. 4.1 must have an average H2 value lower than 12 for the last three years.

If the H2 value is higher than 12, an account must be given of the development tendency of the H2 value. In such cases the contracting authority will carry out a general assessment based on the tenderer's account, and can, on the basis of this, still qualify the tenderer on this point. Particular events and trends stated in the account will be emphasised in the general assessment.

If a tenderer is a working partnership (supplier consortium), the requirements apply for each of the participants. Tenderers must be certified in accordance with ISO 14001 (2015), EMAS (EU Eco-Management and Audit Scheme for environmental management), or the Eco-Lighthouse certification scheme, with relevance to equivalent public transport projects. Tenderers must be certified in accordance with ISO 9001 (2015) with relevance to comparable public transport projects.

Minimum level(s) of standards possibly required:

See the tender documentation for more detailed information. This also includes a description of how

newly founded companies can participate in the competition.

Section IV: Procedure

IV.1)Description

IV.1.1)Type of procedure

Competitive procedure with negotiation

IV.1.3)Information about a framework agreement or a dynamic purchasing system

IV.1.4)Information about reduction of the number of solutions or tenders during negotiation or dialogue

Recourse to staged procedure to gradually reduce the number of solutions to be discussed or tenders to be negotiated

IV.1.5)Information about negotiation

IV.1.8)Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: yes

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 07/01/2022

Local time: 12:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Norwegian

IV.2.6)Minimum time frame during which the tenderer must maintain the tender

Tender must be valid until: 18/11/2022

Section VI: Complementary information

VI.1)Information about recurrence

This is a recurrent procurement: no

VI.2)Information about electronic workflows

Electronic ordering will be used

Electronic invoicing will be accepted

Electronic payment will be used

VI.3)Additional information:

VI.4)Procedures for review

VI.4.1)Review body

Official name: Oslo tingrett
Postal address: C.J. Hambros plass 4
Town: Oslo
Postal code: 0125
Country: Norway
E-mail: oslo.tingrett@domstol.no
Telephone: +47 22035200

VI.5)Date of dispatch of this notice:

22/11/2021




Permalink


Postponed from 07/01/2022 to 14/01/2022 the deadline of the competitive procedure with negotiation for the construction of the southern section of the Rogfast main tunnels from Harestad to the Kvitsoy contract (Contract E03). The E03 contract comprises of the southern section of the tunneling works, with approximately 9 km of twin tunnels to be driven with a grade of 5%. A tender conference and site inspection will be held on 16/12/2021, meet at the project office in Mekjarvik at 10.00. The tender conference will be held in Norwegian. End of contract will be 01/06/2030. For tender documents please click here, where tenders must be sent.  Contact Norwegian Public Roads Administration, attn Fredrik Wolstad, Moss, email firmapost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=625822-2021.   Ref. n. 21/226747. 49/21. 

Norway-Moss: Construction work

2021/S 237-625822

Corrigendum

Notice for changes or additional information

Works

(Supplement to the Official Journal of the European Union, 2021/S 230-607336)

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses

Official name: Statens vegvesen
National registration number: 971 032 081
Postal address: Skoggata 19
Town: Moss
NUTS code: NO Norge
Postal code: 1500
Country: Norway
Contact person: Fredrik Wølstad
E-mail: firmapost@vegvesen.no
Internet address(es):
Main address: http://www.vegvesen.no
Address of the buyer profile: https://eu.eu-supply.com/ctm/Company/CompanyInformation/Index/249176

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

E39 Rogfast. Contract E03 – main tunnels, Harestad – contract border E03/E02

Reference number: 21/226747

II.1.2)Main CPV code

45000000 Construction work

II.1.3)Type of contract

Works

II.1.4)Short description:

The tender documentation is for contract E03, which comprises the main tunnels, tunnels 11 and 12 from the open air zone at Harestad and northwards to the contract border between E03 and E02. Rogfast will replace the ferry routes E39 Mortavika -Arsvågen and Mekjarvik – Kvitsøy. E39 Rogfast consists of a 26.7 km submarine main tunnel with separate tunnels for each direction with a cross section of 2 x T10.5 between Harestad in Randaberg Municipality to the south of Boknafjorden and Laupland in Bokn Municipality to the north of Boknafjorden. Approx. 1.4 km of motorway will be constructed that is made narrower and connected to the existing E39 to the south of Knarholmen. A 3.5 km tunnel with a cross section of T10.0 is to be constructed between Kvitsøy and the main tunnel, which will be connected to the main tunnel in a two-level interchange in the tunnel. A total of 2.0 km new county road is to be constructed on Kvitsøy. See the website on the Rogfast project: (www.vegvesen.no/Vegprosjekter/Europaveg/E39Rogfast).

Section VI: Complementary information

VI.5)Date of dispatch of this notice:

02/12/2021

VI.6)Original notice reference

Notice number in the OJ S: 2021/S 230-607336

Section VII: Changes

VII.1)Information to be changed or added

VII.1.2)Text to be corrected in the original notice

Section number: IV.2.2

Instead of:

Date: 07/01/2022

Local time: 12:00

Read:

Date: 14/01/2022

Local time: 12:00

VII.2)Other additional information:




Permalink


Competitive procedure with negotiation, deadline 08/04/2022, for the northern part of the Boknafjord Tunnel, part of the E39 Rogfast project (contract E04). For tender documents please click here, where tenders must be sent.  The contract duration will be until 30/10/2029. Contact Norwegian Public Roads Administration, att.n Kristine Hamre, Moss, email kristine.hamre@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118204-2022. Ref.n. 22/35068. 10/22. 

 

Norway-Moss: Construction work

2022/S 045-118204

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Statens vegvesen
National registration number: 971 032 081
Postal address: Skoggata 19
Town: Moss
NUTS code: NO0A2 Vestland
Postal code: 1500
Country: Norway
Contact person: Kristine Hamre
E-mail: kristine.hamre@vegvesen.no
Internet address(es):
Main address: http://www.vegvesen.no
Address of the buyer profile: https://eu.eu-supply.com/ctm/Company/CompanyInformation/Index/249176
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=325134&B=VEGVESEN
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=325134&B=VEGVESEN
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Ministry or any other national or federal authority, including their regional or local subdivisions
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

E39 Rogfast. Contract E04 -The Boknafjord Tunnel north

Reference number: 22/35068
II.1.2)Main CPV code
45000000 Construction work
II.1.3)Type of contract
Works
II.1.4)Short description:

The contest is for contract E04, which comprises the northern part of the Boknafjord Tunnel and is part of the E39 Rogfast project. Rogfast will replace the ferry routes E39 Mortavika -Arsvågen and Mekjarvik – Kvitsøy. E39 Rogfast consists of a 26.7 km submarine main tunnel with separate tunnels for each direction with a cross section of 2 x T10.5 between Harestad in Randaberg Municipality to the south of Boknafjorden and Laupland in Bokn Municipality to the north of Boknafjorden. 2.3 km of motorway is to be constructed with that narrows and connects to the existing E39 at Knarholmen. A 3.5 km tunnel with a cross section of T10.0 is to be constructed between Kvitsøy and the main tunnel, which will be connected to the main tunnel in a two-level interchange in the tunnel. A total of 2.0 km new county road is to be constructed on Kvitsøy.

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
45221100 Construction work for bridges
45221246 Undersea tunnel construction work
45233120 Road construction works
II.2.3)Place of performance
NUTS code: NO0A2 Vestland
NUTS code: NO Norge
Main site or place of performance:

Route code/county 4A.

II.2.4)Description of the procurement:

Contract E04 has interface with contract E02 in the tunnel at profile 18450, and 2 x T10.5 tunnels are to be constructed to the northern tunnel opening at profile 27680. Access is via two cross transverse sections from Arsvågen, which were blasted out in the previous contract E13. The Boknafjord Tunnel will be clad throughout with concrete elements on both the walls and roof. The tunnels are longitudinally ventilated with hanging pulse fans. These are located around the technical buildings. Technical buildings will be established every third breakdown lay-by. This gives a distance of approx. 1500 m between the buildings. There will be separate electrical installations, with their own technical buildings for each carriageway. The buildings will be established in their own niches in the tunnel. There are fire water pipelines throughout the tunnel with the accompanying pressure reducing systems. The tunnel is equipped with separate collections of washing water from extinguishers in the roadway that connect to oil separators and individual sedimentation basins and intake pools as a joint solution for both tunnel carriageways. The water is pumped up in steps with approximately 80 m elevation height. The drainage basins have an overcapacity for leaking water as preparedness for unforeseen events. The water is pumped up to the open air at the tunnel opening at Laupland for connection not the pipeline that was constructed in a previous contract. There is a relative amount of uncertainty about the ground conditions. This particularly applies to under the sea as these areas are difficult to survey. Several zones have been registered with very low seismic speeds (< 3,000 m/s), with some of the zones being several tens of metres wide. None of the zones that are estimated to be the worst have been surveyed with core drilling. Zones with particularly poor rock mass quality, and where adverse permeability and tension conditions result in water-borne cracks with high water pressure, could cause major problems for the tunnelling, rock support and grouting of the tunnel. The excess rock matter is to be put into sea fillings. Tunnel portals, a technical building, and infrastructure for supplying the tunnel are to be constructed in the open air zone at Laupland. Water and sewage installations are to be constructed for flood management for the open air zone, with a diversion pool and portal pump stations, and a tank is to be constructed for fire water. A new E39 4-lane motorway is o be constructed in the open air zone with a narrowing to a 2-lane road for connection to the existing E39.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
End: 30/10/2029
This contract is subject to renewal: no



Permalink


Three of the six contractors that applied to be pre-qualified, have been chosen for the Rogfast E04 contract, involving the construction of the Boknafjord Tunnel north. The E04 contract starts at Bokn in North Rogaland and goes halfway towards Kvitsoy. The contractors are : Skanska Norge AS,  NCC Norge AS and the Joint Venture OHA Tunnel composed of Obrascon Huarte Lain SA, Hyundai Engineering & Construction Co.Ltd and Aldesa, SA. Visit https://www.bygg.no. 20/22. 

 





Permalink


The Norwegian Public Roads Administration have awarded to Skanska Norge AS from Oslo the first of three large Rogfast contracts, called E04 Boknafjord tunnel North. The EUR 471.02 million (NOK4.94 bn) contract is linked to the construction of the northern part of the E39 Rogfast project, a 26.7 km long underwater tunnel between the municipalities Randaberg in the south and Bokn in the north.    

Skanska will build the northern part of the two-lane subsea Boknafjord tunnel from Bokn in the north and halfway towards Kvitsøy, a total of 18.5 km road in tunnel and 2 km of road above ground.   

Construction is expected to begin in the first quarter 2023 and will be completed in the third quarter 2029. Contact Norwegian Public Roads Administration, att.n Kristine Hamre, Moss, email kristine.hamre@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=699106-2022, https://www.vegvesen.no/ and https://group.skanska.com/. Ref.n. 22/35068.50/22.  



Permalink

The Norwegian Public Roads Administration have awarded to the Joint Venture Implenia (80%) and Stangeland Maskin (20%)  the second of three large Rogfast contracts, called  E03 Boknafjord tunnel South. The EUR 372.25 million (NOK4 bn) contract is linked to the construction of the southern part of the E39 Rogfast project, a 26.7 km long underwater tunnel between the municipalities Randaberg in the south and Bokn in the north. The Joint Venture Implenia/Stangeland Maskin will build the 18.5km southern part of the two-lane subsea Boknafjord tunnel from Bokn in the north and halfway towards Kvitsøy. Construction is expected to begin on January and will be completed in the 2030. Contact Norwegian Public Roads Administration, attn Oddvar Kaarmo, email oddvar.kaarmo@vegvesen.no. Visit  https://www.vegvesen.no/ and https://implenia.com. 04/23.



Permalink

Open invitation to tender, deadline 05/07/2023, for the independent inspection of geological and safety work on the E39 Rogfast.The assignment must be carried out by an engineering geologist. Click here for tender documents and where tenders must be sent. The duration of the contract is 120 months. Contact the Norwegian Public Roads Administration, attn Helge Forland, Moss,

email helge.forland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=336904-2023. Ref. n. 23/35950. 23/23. 



Permalink


Competitive procedure with negotiation, deadline 31/08/2023, for the middle part of the Boknafjord tunnel and completion of the Kvitsoy tunnel on the E39 (Contract E02). The Kvitsoy tunnel is built with one carriageway with a cross section T10. The Kvitsoy tunnel has been blasted, protected from rock, and built with a permanent superstructure, water and sewage installations in carriageway 18 in contract E15, and is to be completed in E02 with water-frost protection, equipping basins and technical buildings. The crossing between these two tunnels is designed as a rock fly-over with two roundabouts. The project will be implemented model-based. See the tender documentation for more detailed information. For tender documents please click here, where tenders must be sent.  The contract duration will be until 26/09/2030. Contact Norwegian Public Roads Administration, att.n Kristine Hamre, Moss, email kristine.hamre@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378445-2023. Ref.n. 23/19829. 26/23. 

 



Permalink


Implenia Norge AS from Lysaker secured the EUR356.13 million (NOK4.02 bn) contract, excluding VAT,  for the construction of the southern section of the Rogfast main tunnels from Harestad to the Kvitsoy contract (Contract E03). The E03 contract comprises of the southern section of the tunnelling works, with approximately 9 km of twin tunnels to be driven with a grade of 5%. Contact Norwegian Public Roads Administration, attn Fredrik Wolstad, Moss, email firmapost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=067250-2023.   Ref. n. 21/226747. 05/23. 



Permalink

The Joint Venture Implenia Norge AS/ Stangeland Maskin AS have secured the EUR524.73 million (NOK5.98 bn), excluding VAT,   for the middle part of the Boknafjord tunnel and completion of the Kvitsoy tunnel on the E39 (Contract E02). The Kvitsoy tunnel is built with one carriageway with a cross section T10. The Kvitsoy tunnel has been blasted, protected from rock, and built with a permanent superstructure, water and sewage installations in carriageway 18 in contract E15, and is to be completed in E02 with water-frost protection, equipping basins and technical buildings. The crossing between these two tunnels is designed as a rock fly-over with two roundabouts. The project will be model-based, contact Norwegian Public Roads Administration, att.n Kristine Hamre, Moss, email kristine.hamre@vegvesen.no. Visit https://kommunikasjon.ntb.no/. Ref.n. 23/19829. 22/24. 



Permalink


The Joint Venture Implenia Norge AS/ Stangeland Maskin AS have secured the EUR 524.73 million (NOK5.98 bn), excluding VAT,   for the middle part of the Boknafjord tunnel and completion of the Kvitsoy tunnel on the E39 (Contract E02). The Kvitsoy tunnel is built with one carriageway with a cross section T10. The Kvitsoy tunnel has been blasted, protected from rock, and built with a permanent superstructure, water and sewage installations in carriageway 18 as part of contract E15. It will be completed in E02 with water-frost protection, equipping basins and technical buildings. The crossing between these two tunnels is designed as a rock fly-over with two roundabouts. The project will be model-based, contact Norwegian Public Roads Administration, att.n Kristine Hamre, Moss, tel +47 97741544, email kristine.hamre@vegvesen.no. Visit https://kommunikasjon.ntb.no/ and https://ted.europa.eu/en/notice/-/detail/354073-2024. Ref.n. 23/19829. 22/24.



Permalink