Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, North Rhine-Westphalia - de/78

Railway

Restricted procedure, deadline 21st August, 2006 for construction of a 3.6 km underground rail line in Duesseldorf, from Wehrhahn to Bilk, mainly using a hydroshield TBM; six underground stations, using the cut-and-cover method; two above ground stations; and associated works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=127824-2006, OJ S 120, or contact Landeshauptstadt Duesseldorf, Duesseldorf, fax +49 2118929063 or 2118929492. E-mail ernstreinhard.kuppe@stadt.duesseldorf.de or bauverwaltungsamt.ausschreibungen@stadt.duesseldorf.de 27/06.Open call for tenders, deadline 30th November, 2007 for construction supervision of the so-called Wehrhahn line in Duesseldorf, actually the second cross-city tunnel, 3.6 km in length, to connect two suburban express railway stations at Wehrhahn in the east and Bilk in the south, its six underground stations (Jacobi Strasse/Pempelforter Strasse, Schadowstrasse, Heinrich-Heine-Allee, Benrather Strasse, Graf-Adolf-Platz, and Kirchplatz) and two line ends. Lot 1 is for construction supervision of the approx. 2.3 km tunnel, to be built using a 9.5 m-diameter shield machine, and lot 2 is for construction supervision of the stations. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=248260-2007, OJ S 204, or contact Landeshauptstadt Duesseldorf, Duesseldorf, fax +49 2118929063 or 2118929492. E-mail ernstreinhard.kuppe@stadt.duesseldorf.de or ausschreibungen@stadt.duesseldorf.de. Also visit www.duesseldorf.de/top/thema010/aktuell/news/wehrhahnlinie/index.shtml 44/07.Bilfinger Berger has won a EUR220 million contract (lot 1) to build the so-called 3.6 km Wehrhahn line in Duesseldorf that will provide significant relief to inner-city traffic when it goes into operation in 2015. The dual-track tunnel will be built by a tunnel boring machine. The techniques selected for the construction of five underground train stations (Jacobi Strasse/Pempelforter Strasse, Schadowstrasse, Benrather Strasse, Graf-Adolf-Platz, and Kirchplatz) will ensure that traffic is disrupted as little as possible during the construction phase. Extensive foundation engineering works will serve to protect existing structures in Duesseldorf's inner-city. The line will be actually the second cross-city tunnel, probably for the existing low floor tram lines 703, 712, 713, between the suburban rail stations of Wehrhahn and Bilk. Visit www.bilfingerberger.de 49/07. Lot 2 has been awarded to Wayss & Freytag, Max Bögl and Bauer for EUR50 million. At Heinrich-Heine-Allee, a 300 m stretch was already built together with the first city tunnel in the 1980s. The old tram route above running through the shopping areas of Schadowstrasse and the old city will be removed. The new underground will also improve access to the new Duesseldorf shopping complex which is currently under construction in the area of Bilk located next to the S-Bahn station. Visit www.wf-ingbau.de, www.max-boegl.de and www.bauer.de 49/07.



Permalink

Open invitation to tender, deadline 25.05.2012, for low-voltage installation work in South branch (lot 1) and East branch (lot 2) on the Wehrhahn line in Duesseldorf. Time limit for receipt of requests for documents or for accessing documents: 18.05.2012. Contact Landeshauptstadt Duesseldorf, Bauverwaltungsamt, tel +49 2118993902,fax +49 2118929080, e-mail ausschreibungen@duesseldorf.de. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=108327-2012. 16/12.



Permalink

KLU Duisburg GmbH of Duisburg secured the EUR1.9 million contract, VAT included, for ventilation and air-conditioning installation works in the six underground stations on the Wehrhahn line in Duesseldorf. Contact Mr Kuppe, Landeshauptstadt, Duesseldorf, tel +49 2118994148,fax +49 2118929888, e-mail ernstreinhard.kuppe@duesseldorf.de. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=342012-2012. 44/12.



Balfour Beatty Rail GmbH (Bochum) secured the EUR10.9 million contract, VAT included, for low-voltage installation work in South branch (lot 1) and East branch (lot 2) on the Wehrhahn line in Duesseldorf. Contact Mr Kuppe, Landeshauptstadt, Duesseldorf, tel +49 2118994148,fax +49 2118929888, e-mail ernstreinhard.kuppe@duesseldorf.de. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=338667-2012. 44/12.





Permalink

Germany, Thuringia - de/77

Road

Negotiated procedure, deadline 16th March, 2006 for construction supervision and geotechnical engineering for a 1,200 m section of road L 1048, including a 1,145 m-long 10.5 m-wide bored tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=034433-2006, OJ S 31, or contact Strassenbauamt Mittelthueringen, Erfurt, fax +49 3613786222. E-mail post@sbamt.thueringen.de 09/06.Open call for tenders, deadline 19th September, 2006 for construction of a road stretch on the L 1048, including a 1,165 m two-lane tunnel using the drill-and-blast method (contract 2). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=127810-2006, OJ S 120, or contact Strassenbauamt Mittelthueringen, Erfurt, fax +49 3613786222 or 3613786288. E-mail post@sbamt.thueringen.de or vergabe@sbamt.thueringen.de 27/06.BUNG won a EUR784,000 contract for construction supervision and geotechnical engineering for a 1,200 m section of road L 1048, including the 1,145 m-long 10.5 m-wide Porzberg bored tunnel. Visit www.bung-ag.de 29/06.Porr Technobau und Umwelt pocketed a EUR44.6 million contract to construct a road stretch on the L 1048, including a 1,165 m two-lane tunnel using the drill-and-blast method. Visit www.ptu.at 15/07.



Permalink

Germany, Berlin - de/76

Railway

Negotiated procedure, deadline 27th February, 2006 for engineering design and construction supervision for a new concrete box tunnel and railway station at Berlin Schoenefeld airport to be used by long distance and metropolitan trains. The total length of the project is approx. 3,190 m with variable cross section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020074-2006, OJ S 18, or contact Flughafen Berlin-Schoenefeld, Berlin, fax +49 3060912663. E-mail wilfried.mertens@berlin-airport.de 08/06.Open call for tenders, deadline 31st July, 2006 for construction of a 4-track tunnel and underground railway station at Berlin Schoenefeld airport. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096741-2006, OJ S 90, or contact Flughafen Berlin-Schoenefeld, Berlin, fax +49 3060912663. E-mail wilfried.mertens@berlin-airport.de 21/06.A JV of RSF and Zerna Köpper & Partner will be responsible for engineering design and construction supervision for a new concrete box tunnel and railway station at Berlin Schoenefeld airport to be used by long distance and metropolitan trains. The total length of the project is approx. 3,190 m with variable cross section. Visit www.zkp.de 03/07.Periodic information notice for 600 m-long tunnel and associated works at Schoenfeld Airport.Contact Herrn Jaeger at DB ProjektBau, tel +49 3029 756801, e-mail arno.jaeger@bahn.de 44/08.



Permalink

Open invitation to tender, deadline 23.05.2011, for construction of concrete tunnel and workshop for new S-Bahn S21, tender package VE03.1. Contract commences 01.07.2011 for completion 31.12.2012. Client contact Arno Jaeger at DB Projektbau in Schoenefeld, e-mail arno.jaeger@deutschebahn.com. Further information, specs and docs from Derek Scharwaechter at DB AG in Berlin, tel +49 30297-551-04, fax -09, to whom tenders or requests to participate must be sent. Time limit for accessing documents 06.05.2011. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123381-2011. 16/11.



Permalink

Open invitation to tender, deadline 29.06.2011, for construction of tunnel, open cut and central station for new S-Bahn S21, tender packages VE03.2 and VE02.0. Contract commences 10.08.2011 for completion 31.05.2015. Client contact Arno Jaeger at DB Projektbau in Schoenefeld, e-mail arno.jaeger@deutschebahn.com. Further information, specs and docs from Derek Scharwaechter at DB AG in Berlin, tel +49 30297551-04, fax -09, to whom tenders or requests to participate must be sent. Time limit for accessing documents 15.06.2011. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=166135-2011. 21/11.



Permalink

Announcement of award of contract for construction of concrete tunnel and workshop for new S-Bahn S21 at Schoenefeld airport, tender package VE03.1. For further information visit tunnelbuilder archive de/76 or contact Arno Jaeger at DB Projektbau in Schoenefeld, e-mail arno.jaeger@deutschebahn.com, tel +49 3029728-790, fax –606. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=402907-2011. 52/11.



Permalink

Announcement of award of contract for construction of tunnel and workshop for new S-Bahn S21 at Schoenefeld airport, tender package VE03.2 inclusive of VE02.0. For further information visit tunnelbuilder archive de/76 or contact Arno Jaeger at DB Projektbau in Schoenefeld, e-mail arno.jaeger@deutschebahn.com, tel +49 3029728-790, fax –606. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=035334-2012. 05/12.



Permalink


The joint venture between S-21 Berlin-Tunnel und Trogbauwerk and Implenia Construction GmbH in Berlin, have been awarded with the contract for construction of a tunnel and workshop for the new S-Bahn S21 at Schoenefeld airport. The tender package VE03.2 is inclusive of VE02.0  which secured an extra EUR200,000 for the construction of a treatment plant for underground water. For further information please contact Arno Jaeger at DB AG in Berlin, tel +49 3029755104, fax +49 3029755724, e-mail thomas.richter@deutschebahn.com. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=386500-2016. Ref.n.TEI-O-B/11/260348. 46/16.




Permalink


Open invitation to tender, deadline 27.01.2017, for equipment in tunnels and stations on the new northern part of the S-Bahn line S21 from Berlin main station to the northern Berlin S-Bahn ring. Duration of the contract is from 01/04/2017 to 30/06/2020. The new section is composed by three stretches; between Westhafen and Potsdamer Platz stations (6017); between Wedding and Hauptbahnhof stations (6019); Moabit (6020). Duration of the contract is from 01/04/2017 to 30/06/2020. For procurement documents, additional information and tender submitting click here http://www.deutschebahn.com/bieterportal.

Contact FEI-O – Infrastructures Bids East Region, attn Elke Schumann, Berlin, tel +49 3029756706, fax +49 3029755740, e-mail elke.schumann@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=436099-2016. 50/16.




Permalink


Additional information about the open invitation to tender, deadline 27.01.2017, for provision of equipment in tunnels and stations on the new northern part of the S-Bahn line S21 from Berlin main station to the northern Berlin S-Bahn ring. Duration of the contract is from 01/04/2017 to 30/06/2020. The new section is composed of three stretches; between Westhafen and Potsdamer Platz stations (6017); between Wedding and Hauptbahnhof stations (6019); Moabit (6020). Duration of the contract is from 01/04/2017 to 30/06/2020. For procurement documents, additional information and tender submitting http://www.deutschebahn.com/bieterportal. Contact FS.EI-O – Infrastructures Bids East Region, attn Elke Schumann, Berlin, tel +49 3029756706, fax +49 3029755724, e-mail elke.schumann@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=463277-2016. 52/16.




Permalink


Postponed from 27.01.2017 to 23.02.2017 the deadline for the open invitation to tender for equipment in tunnels and stations on the new northern part of the S-Bahn line S2. This runs from Berlin main station to the northern Berlin S-Bahn ring. The new section is composed of three stretches; between Westhafen and Potsdamer Platz stations (6017); between Wedding and Hauptbahnhof stations (6019) and Moabit (6020). The duration of the contract is from 25/04/2017 to 30/06/2020. For procurement documents, additional information and tender submitting click here http://www.deutschebahn.com/bieterportal. Contact FS.EI-O – Infrastructures Bids East Region, attn Elke Schumann, Berlin, tel +49 3029756706, fax +49 3029755724, e-mail elke.schumann@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020081-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=030120-2017. 05/17.




Permalink


The contract for underground boreholes and for the search for explosive devices, for laboratory and field tests before  the construction of the 2.5km section 3a between Potsdamer Platz and Yorckstrasse of the new S 21 railway line in Berlin was not awarded. Contact DB Netz AG,  attn Volker Hofmann, Frankfurt  s/M, tel +49 3029724291,email volker.vo.hofmann@deutschebahn.com. For further information on the TED tender, please click here and here. Ref.n. 20FEI49219. 09/21.

 




Permalink

Germany, Baden-Wuerttemberg - de/75

Road

Negotiated procedure, deadline 2nd November, 2005 for design of the Schindhau tunnel between Tuebingen (road B 27) and Tuebinger Kreuz (B 28). It is a 3.55 km section, including a 2.35 km twin bore tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=190676-2005, OJ S 193, or contact Regierungspräsidium Tuebingen, Tuebingen, fax +49 70717573190 or 707175793436. E-mail poststelle@rpt.bwl.de or ulrich.kunze@rpt.bwl.de 41/05.BUNG received a EUR160,000 contract to design the Schindhau tunnel between Tuebingen (road B 27) and Tuebinger Kreuz (B 28). It is a 3.55 km section, including a 2.35 km twin bore tunnel. Visit www.bung-ag.de 15/06.Open call for bids, deadline 20th September, 2007 for construction of a 2.3 km tunnel, whereof 230 and 315 metres in cut-and-cover and 1,687 metres bored, 100 square metres in cross-section, as well as a parallel safety tunnel, 25 square metres in cross-section, and other related structures. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183754-2007, OJ S 148, or contact Regierungspraesidium Stuttgart, Schwaebisch Gmuend, fax +49 71711040799 or 7116660184. E-mail johannes.zengerle@rps.bwl.de or vergabeunterlagen@staatsanzeiger.de 33/07.Negotiated call for tenders, deadline 11th January, 2008 for construction supervision of a 1,687 m-long, 100 sq m cross-sectional tunnel and a 1,613 m-long 20 sq m parallel safety tunnel, a shaft to be built raise boring and other minor works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=287497-2007, OJ S 236, or contact Regierungspraesidium Stuttgart, Schwaebisch Gmuend, fax +49 71711040799. 52/07-01/08.A joint venture of Zueblin, Baresel, Ostu-Stettin and Hinteregger signed a EUR140 million contract to build a 1.8 km 105 sq m tunnel on road B 29 in Schwäbisch Gmünd. Visit www.zueblin.de, www.baresel.de, www.oestu-stettin.at and www.hinteregger.co.at 17/08.A joint venture of BUNG and Müller+Hereth will supervise the construction of a 1,687 m-long, 100 sq m cross-sectional tunnel and a 1,613 m-long 20 sq m parallel safety tunnel, a shaft to be built using raise boring and other minor works on road B 29 in Schwäbisch Gmünd. Visit www.bung-ag.de and www.mueller-hereth.com 34-35/08.



Permalink

Prior information notice for construction of four-lane extension of B27 between Tuebingen and Nehren from main site in Dusslingen, including equipping two-lane Laermschutz tunnel. Scheduled date for start of award procedures 01.07.2010. Contract starts 01.03.2011 for completion 31.12.2013. Further information from Edwin Kuhn at Regierrungspraesidium Tuebingen in Reutlingen, tel +49 7121347-100, fax -150, e-mail strabau.nord@rpt.bwl.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=287359-2009. 53/09.



Permalink

Prior information notice that award procedures will commence on 03.05.2010 for the 3.2 km-long B 312 road construction including a 1.91 km traffic tunnel with parallel 1.94 km rescue tunnel and ancillary works including five bridges and two 170 m-long sound barriers. Estimated total value EUR77 million. Contract, which is in five lots, will commence 30.09.2010 for completion 30.12.2016. Further information from Norbert Heinzelmann at RPT in Reutlingen, tel +49 7121347-100, fax -150, e-mail strabau.nord@rpt.bwl.de or visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=055283-2010. 08/10.



Permalink

Open invitation to tender, deadline 14.12.2010, for construction of four-lane extension of B27 between Tuebingen and Nehren from main site in Dusslingen, including equipping two-lane Laermschutz tunnel. Contract starts 02.05.2011 for completion 31.10.2013. Further information from Edwin Kuhn at Regierungspräsidium Tübingen Ref. 47.1 in Reutlingen, tel +49 7121347-100, fax -150, e-mail strabau.nord@rpt.bwl.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=316030-2010. 43/10.



Permalink

Prior information notice for EUR4.5-4.9 million operational and structural retrofit of two-lane Laermschutz tunnel. Further information from Herrn Schmitz in Osnabruek, tel +49 541503-700, fax -777, e-mail Postelle@nlstbv-os.niedersachsen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335682-2010. 46/10.



Permalink

Prior information notice of start of award procedures on 01.03.2011 for construction of 3.2 km of route in lots including 1.91 km-long (1.62 km mined and 290 m open cut) Scheibengipfel single lane road tunnel with 1.94 km (1.62 km mined and 320 m open cut) rescue tunnel. Scheduled contract start date 01.02.2012 for completion 30.12.2016. Estimated value EUR77 million, excluding VAT. Further information from Norbert Heinzelmann at RPT in Reutlingen, tel +49 7121347-100, fax -150, e-mail strabau.nord@rpt.bwl.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=009959-2011. 02/11.



Permalink

Prior information notice of start of award procedures on 31.03.2011 for construction-site supervision services for Reutlingen bypass, including 1.91 km-long Scheibengipfel single lane road tunnel, exit and rescue tunnel. Further information from Dirk Matuschowitz at RPT in Reutlingen, tel +49 7071757-3454, e-mail dirk.matuschowitz@rpt.bwl.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020068-2011. 05/11.



Permalink

Award of contract, value EUR3,682,770 including 19 percent VAT, to Siemens AG of Stuttgart for supply, installation and maintenance of technical equipment at Laermschutz tunnel on four-lane extension of B27 between Tuebingen and Nehren, including drainage pump station and fire water booster station. Further information from Michael Meeh at Siemens in Stuttgart, tel +49 71113767-34, fax -99, e-mail michael.meeh@siemens.com and from Edwin Kuhn at Regierungspräsidium Tübingen Ref. 47.1 in Reutlingen, tel +49 7121347-100, fax -150, e-mail strabau.nord@rpt.bwl.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=106128-2011. 14/11.



Permalink

Open invitation to tender, deadline 22.06.2011, for construction of 1.91 km-long B 312 Scheibengipfel single lane traffic tunnel and safety tunnel on Reutlingen bypass. Contract starts 16.04.2012 for completion 30.09.2016. Further information, specs and docs from Norbert Heinzelmann at RPT in Reutlingen, tel +49 7121347-0, e-mail strabau.nord@rpt.bwl.de to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=113485-2011. 15/11.



Permalink

Open invitation to tender, deadline 18.05.2011, for the operational and structural retrofit of two-lane Laermschutz tunnel. Time limit for receipt of requests for documents or for accessing documents: 06.05.2011. Further information from Herrn Schmitz, NLStBV GB in Osnabruek, tel +49 541503-721, fax -779, e-mail Postelle@nlstbv-os.niedersachsen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=121218-2011. 16/11.



Permalink

Open invitation to tender, deadline 26.05.2011, for the no-noise Dissen tunnel (500 m) on the A33. Further information from Mr Winkelmann/Mrs Runge, NLSTBV in Osnabruek, tel +49 541503-700, fax -779, e-mail postelle@nlstbv-os.niedersachsen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=134993-2011. 18/11.



Permalink

Open invitation to tender, deadline 21.06.2011, for structural engineering retrofit of two-lane Laermschutz tunnel on A33 Osnabrueck-Bielfeld including application of fire resistant lining, surface protection, and installation of crosspassages. Contract starts 01.08.2011 for completion 08.01.2013. Time limit for receipt of requests for documents or for accessing documents: 01.06.2011. Further information from Herrn Schmitz, NLStBV GB in Osnabrueck, tel +49 541503-721, fax -779, e-mail Postelle@nlstbv-os.niedersachsen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=146613-2011. 19/11.



Permalink

Award of contract, value EUR3,083,439 including 19 percent VAT, to Osmo-Anlagenbau GmbH of Georgsmarienhuette for upgrade of lighting, smoke detection, signalling, video, radio and associated systems in two-lane Laermschutz tunnel on A33 Osnabrueck-Bielfeld. Contract completion 08.01.2013. Further information from Herrn Schmitz, NLStBV GB in Osnabrueck, tel +49 541503-700, fax -777, e-mail Postelle@nlstbv-os.niedersachsen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251775-2011. 32/11. Award of contract, value EUR1,730,604 including VAT at 19 percent, to Spritzbeton u Injektionstechnik of Quakenbruek for application of fire resistant lining, surface protection, and installation of two crosspassages at two-lane Laermschutz tunnel on A33 Osnabrueck-Bielfeld. Contract completion 08.01.2013. Further information from info@s-und-i-gmbh.de and Herrn Schmitz, NLStBV GB in Osnabrueck, tel +49 541503-700, fax -777, e-mail Postelle@nlstbv-os.niedersachsen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251778-2011. 32/11.



Permalink

Germany, Frankfurt - de/74

Railway

Open call for tenders, deadline 5th october, 2005 for project management for civil engineering for an underground urban railway in Frankfurt. The project includes approx. 2.4 km of double-track underground railway, one station in cut-and-cover, one station in open cut, one mined station and mined tunnel sections. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=161857-2005, OJ S 162, or contact Stadtwerke Verkehrsgesellschaft Frankfurt am Main, Frankfurt, fax +49 6921323336. E-mail p.altay@vgf-ffm.de 36/05.Open call for tenders, deadline 15th December, 2005 for consultancy (geotechnical and hydrogeotechnical engineering, tunnel construction engineering, etc.) as part of the extension of the urban train network in Frankfurt, stretch D, section II, lots 75 to 78. The project includes approx. 1.6 km of double-track mined tunnel, divided in two lots, a 240 m-long station using the cut-and-cover method, a 260 m ramp and two emergency exits. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=202988-2005, OJ S 205, or contact Stadtwerke Verkehrsgesellshaft Frankfurt am Main, Frankfurt, fax +49 6921323336. E-mail p.altlay@vgf-ffm.de 45/05.Arcadis Homola secured a contract for project management for civil engineering for an underground urban railway in Frankfurt, including approx. 2.4 km of double-track underground railway, one station in cut-and-cover, one station in open cut, one mined station and mined tunnel sections. Visit www.homola.de 18/06.



Permalink

Invitation to tender by negotiated procedure, deadline 14.11.2012, for project management for light metro, line B, Europa-Viertel section in Frankfurt. The 2.6 km-long section includes two tunnels, length 1,330 m and 1,270 m, and four stations. Time limit for receipt of requests for documents or for accessing documents: 08.11.2012. Contract duration 15.01.2013-31.12.2019. Contact Verkehrsgesellschaft Frankfurt am Main, att.n Mr Altlay, Frankfurt, tel +49 69213-26536, fax +49 69213-23336, e-mail p.altay@vgf-ffm.de. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=347974-2012. Bid Code n.VGF-EU 159/12. 44/12.



Permalink


Invitation to tender by negotiated procedure, deadline 15.07.2016, for the upgrading of lighting and cable systems for the metro line B, 5km underground sections in Frankfurt. The contract duration is from 23.09.2016 until 29.12.2017. For tender documents https://vergabe.vgf-ffm.de/NetServer/TenderingProcedureDetails?function=_Details&TenderOID=54321-Tender-1555903d8f6-11febbaf98494eea. Contact Stadtwerke Verkehrsgesellschaft Frankfurt am Main mbH, att.n Einkauf und Materialwirtschaft (NK13), Frankfurt, tel +49 6921326557, fax +49 6921323336, e-mail m.zwilling@vgf-ffm.de. Tenders to be sent to Stadtwerke Verkehrsgesellschaft Frankfurt am Main mbH, Frankfurt, tel +49 6921303, fax +49 6921322740, e-mail poststelle@vgf-ffm.de. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=225734-2016 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=233089-2016. 27/16.




Permalink

Germany, Baden Wurttemberg - de/73

Highway

Negotiated procedure, deadline 4th August, 2005 for planning and design of the Himmelsschleife and Drackenstein tunnels on highway A8 Karlsruhe-Munich, section Muehlhausen-Hohenstadt. Both tunnels are twin tubes, with respective lengths of 1.2 km and 1.7 km. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=121913-2005, OJ S 123, or contact Regierungspraesidium Stuttgart, Stuttgart, fax +49 7117828519469. E-mail abteilung4@rps.bwl.de 27/05.Mueller and Hereth received a EUR329,850 contract for planning and design of the Himmelsschleife and Drackenstein tunnels on highway A8 Karlsruhe-Munich, section Muehlhausen-Hohenstadt. Both tunnels are twin tubes, with respective lengths of 1.2 km and 1.7 km. Visit www.mueller-hereth.com 09/06.



Permalink

Open invitation to tender, deadline 08.06.2010, for construction work and electrical equipment including jet fans, lights and emergency call system, value EUR3.5 million, for 540 m-long Gruibingen tunnel on Gruibingen-Muehlhausen section of A8 Karlruhe-Muenchen. Contract duration 26 months. Further information from Herrn Lohrmann at RPS Stuttgart in Goeppingen, tel +49 7161657-401, fax -199, e-mail dienstsitzGP@rps.bwl.de. Specs and docs from SBW in Stuttgart, tel +49 71166601-45, fax -86, e-mail vergabeunterlagen@staatsanzeiger.de. Time limit for requests for, or access to, documents 18.00h on 01.06.2010. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=121107-2010. 17/10.



Permalink

Award of contract to Siemens AG for construction work and electrical equipment such as jet fans, lights and emergency call system, value EUR4,958,862 including 19% VAT, for 540 m-long Gruibingen tunnel on Gruibingen-Muehlhausen section of A8 Karlsruhe-Muenchen. Contract duration 26 months. More from Siemens AG Industrie Sector in Stuttgart, tel +49 711137-0, fax -6799. Further information from Herrn Lohrmann at RPS Stuttgart in Goeppingen, tel +49 7161657-0, fax -199, e-mail dienstsitzGP@rps.bwl.de. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=325694-2010. 44/10.



Permalink

Germany, North Rhine-Westphalia - de/72

Motorway

Negotiated procedure, deadline 30th May, 2005 for conceptual design for motorway A6 between AS Hemer and federal road B 7 (5.7 km), including two tunnels with lengths of 1.2 km and 300 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=080798-2005, OJ S 83, or contact Landesbetrieb StraíŸenbau Nordrhein-Westfalen, Hagen, fax +49 23318002169. E-mail ahmed.karroum@strassen.nrw.de 19/05.Negotiated call for tenders, deadline 11th February, 2008 for preliminary design of a 6.8 km section of the A 52 between Essen East (A 40) and Essen North (A 42), including three tunnels with lengths of approx. 680 m, 700 m and 870 m and two galleries with lengths of approx. 410 m and 600 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=11473-2008, OJ S 10, or contact Landesbetrieb Strassenbau Nordrhein-Westfalen, Essen, fax +49 2017298333. E-mail achim.frieling@strassen.nrw.de 04/08.Negotiated invitation to tender, deadline 28th April, 2008 for preliminary design of the new highway A52 between east and north Essen, including three tunnels with lengths of approx. 680 m, 700 m and 870 m, three galleries with lengths of approx. 245 m, 410 m and 600 m, and other structures. Rhis is a re-tender. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=82951-2008, OJ S 61, or contact Landesbetrieb Strassenbau Nordrhein-Westfalen, Essen, fax +49 2017298333. E-mail pbc-r-vergabeservice@strassen.nrw.de 14/08.



Permalink

Germany, Saxony - de/71

Water

Restricted call for bids, deadline 5th November, 2004 for construction of a 3.3 km-long 4 m outer diameter water tunnel, to be built in rock using a TBM, as part of complex repairs to Klingenberg dam. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=160052-2004, OJ S 188, or contact LTV des Freitaates Sachsen, Pirna, fax +49 3501796105. E-mail michael.humbsch@ltv.smul.sachsen.de 41/04.Inros Lackner and WBI signed a EUR1.3 million contract for planning of a new 3 km-long 4 m-diameter flood relief tunnel and outlet structure from the Freiberger Mulde to Chemnitzbach. Visit www.inros-lackner.de and www.wbionline.de 17/08.



Permalink

Germany, Hamburg - de/70

Light Rail

  Negotiated procedure, deadline 23rd July, 2004 for construction management for the Rohbau tunnel on section 5-8 of Hamburg's light rail. This section includes a 2 x 1.8 km TBM-driven tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100677-2004, OJ S 119, or contact Deutsche Bahn Netz, Hamburg, fax +49 40513162622. E-mail bb.zeppelinstr@t-online.de 27/04.Hochtief and Bilfinger Berger will build the city railway to Hamburg airport, section 5-8, using a Herrenknecht mixshield TBM, machine S-258. The project includes a 2 x 1,750 m tunnel. A christening ceremony is planned for 6th December, 2004. The excavated diameter is 6,870 mm and the finished diameter after lining is 5,800 mm (inner) and 6,600 mm (outer diameter of the segments). Main figures of the machine are 8,500 mm (shield length), 64,000 mm (total length), 390 t (weight of shield), 610 t (weight in total), 1,800 kW (total installed power), 36,490 kN (total thrust) and 600 kW (cutterhead power). Lining to comprise six segments and one key segment. Geology will consist of boulder clay, coarse sand / gravel, medium sand, fine sand, silt and artificial soil. Commissioning scheduled for 2007. Visit www.herrrenknecht.com, www.hochtief.de and www.bilfinger.de 48/04.Consulting engineers Grassl secured a EUR1.1 million contract for construction management for the Rohbau tunnel on section 5-8 of Hamburg's light rail. This section includes a 2 x 1.8 km TBM-driven tunnel. Visit www.grassl-ing.de 35/05.



Permalink

Germany, Waiblingen - de/69

Highway

Open invitation to tender, deadline 9th December, 2003 for construction of the 1,080 m-long Leutenbach tunnel on highway B14 to Winnenden. It is a dual-tube tunnel, 420 m in cut-and-cover and 660 m mined. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=182842-2003, OJ S 203, or contact StraíŸenbauamt Kircheim, Waiblingen, fax +49 71519891398. E-mail bb-waiblingen@t-online.deOpen invitation to tender, deadline 22nd November, 2003 for construction management of the 1,080 m-long Leutenbach tunnel on highway B14 to Winnenden. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=183341-2003, OJ S 203, or contact StraíŸenbauamt Kircheim, Waiblingen, fax +49 71519891398. 44/03.Wittke Beratende Ingenieure (WBI) secured a EUR431,200 contract for site supervision and the review of the design for execution of the 1,080 m-long Leutenbach tunnel on highway B14 to Winnenden, which will be built by Hermann Kirchner. WBI also elaborated the design and tender. Visit www.wbionline.de and www.hermann-kirchner.com 52/05-01/06.Open call for tenders, deadline 6th September, 2007 for supply and installation of E&M equipment in the 1,080 m-long Leutenbach tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=187948-2007, OJ S 151, or contact Regierungspraesidium Stuttgart, Waiblingen, fax +49 71519891398. E-mail baubueroWN@rps.bwl.de 35/07.Duerr scooped a EUR5.3 million contract to supply and install the E&M equipment in the 1,080 m-long Leutenbach tunnel. Visit www.duerr-gruppe.de 52/07-01/08.



Permalink