Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Poland

Poland, Katowice - pl/14

Sewerage

Works contract forecast for Lot 1 of sewerage networks in the city centre and along river Rawa. The total length of the extension and reconstruction works will be 7,015 metres. Microtunnelling will be required. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 40, document 30484-2002. Tenders to be published in October, 2002. 10/02.



Permalink

Poland, Warsaw - pl/13

Wastewater Treatment

Works contract forecast for the N-Bis collector in Warsaw South including the construction, using tunnelling methods, of a pipeline under pressure of a diameter of 1.4 m and a length of 3.75 km lying in a protecting pipe of a larger diameter. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 40, document 30499-2002. Tenders to be published in September, 2002. 10/02.Tender notice, deadline 16th December, 2003 for construction of main collectors for the Warsaw south wastewater treatment plant. Lot 1b includes the construction, using tunnelling methods, of a 3.75 km-long 1.4 m-diameter pipeline under pressure. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=159589-2003, OJ S 177, or contact City of Warsaw, fax +48 226202786 or 228492098. 40/03.



Permalink

Poland, Krakow - pl/12

Tramway

Invitation to prequalify, deadline 7th August, 2001, for design and construction of 4 km-long tramway section with 700 m in cut and cover. Award expected early-2002, for commissioning 2004. Contact MDA, Krakow, fax +48 124291040. 30/01.Invitation to tender, deadline 18th March, 2003 for design-and-build contract for phase 1 of the city's fast tram to connect Kurdwanow with Kamienna (11.8 km) including 1.4 km in cut-and-cover tunnel.Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=003028-2003, OJ S 4, or contact Municipal Development Agency, Mr Janusz Zagí³rski, Krakow, tel. +48 124292513, fax +48 124291040. 03/03.Invitation to tender, deadline 14th November, 2005 for design and build contract for Phase 1 (11.8 km) of the first line of the fast tram, planned to connect Kurdwanow with Kamienna, including a new 1.4 km cut-and-cover tunnel section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=179376-2005, OJ S 181, or contact Municipal Development Agency (Agencja Rozwoju Miasta), Krakow, fax +48 124291040. 39/05.Invitation for expression of interest, deadline 10th November, 2005 for assistance of the owner in supervising and administrating the contract, as part of the first line of the tram which will connect Kurdwanow with Kamienna, including a new 1.4 km cut-and-cover tunnel section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=203651-2005, OJ S 206, or contact Municipal Development Agency (Agencja Rozwoju Miasta), Krakow, fax +48 124291040. 44/05.On 3rd July, 2006 Ferrovial's subsidiary Budimex Dromex and PeBeKa signed a contract with Agencja Rozwoju Miasta for the next construction phase of the Krakow fast tram. The value of the contract, to be executed from July 2006 to June 2008, amounts to PLN212 million, whereof PLN204.7 million for Budimex Dromex. The scope of the works include in particular a 1.4 km cut-and-cover tunnel section. Visit www.budimex.com.pl and www.pebeka.com.pl 38/06.



Permalink

Poland, Warsaw - pl/11

Metro

Line 1 is under construction from south to north across the city and is planned for 23 km and 21 stations. Southern section to city centre is complete and in operation, and another section connecting with the Swietokrzyska and Ratusz stations is due to open soon. Hydrobudowa-6 SA, the Polish affiliate of Bilfinger & Berger reports that it has constructed six of the 12 stations completed to date, together with two tunnel sections and a depot. Lines 2 & 3 are planned to be shield driven. When completed, the network will have a route length of 70 km with 70 stations. Contact through www.bub.de February 2000.Shielded TBM construction of current 1.6 km extension with 2 boxed stations nearing completion for opening early-2001. Further 8.5 km-long, 5.5 m-diameter extension in design by PRG Metro/Pebeka Lubin/Metroprojekt for shielded TBM and some cut and cover in sand, clay and silt, with 7 boxed stations. Invitations to tender expected end-2000. Visit www.bilfingerberger.com October 2000.Mostostal Warszawa signed a PLN93.4 million contract with a consortium of PRG Metro and PeBeKa to build Slodowiec metro station (A20) and a manoeuvring side track (B21) on Line 1 of the Warsaw metro. The scope of the works encompasses comprehensive execution of the Slodowiec station and a crossover section behind it with switches and a 207 m-long siding (B21). This will allow for the trains to turn back and the Slodowiec stop to be fully operational even when the works on the remaining sections of the northern extension of Line 1 between the station and the future terminus at Mlociny (A23) are still in progress. The 155 m-long station will be built in 60 cm-thick structural slurry walls utilizing the "top down" method. Mostostal will build the three consecutive stations for Warsaw's metro system: Slodowiec (A20), Stare Bielany (A21) and Wawrzyszew (A22), including the track tunnels in between. This represents a total of about 2 km. Visit www.mostostal.waw.pl 31-32/06.A consortium of Mostostal Warszawa and its Spanish mother company Acciona Infraestructuras signed a PLN217.7 million contract with Warsaw Metro to build two underground stations, Stare Bielany (A21) and Wawrzyszew (A22), with adjoining tunnels (B21 and B22). Both stations and the connecting tunnels comprise the longest segment through the Bielany district, which is the northern, terminal segment of the first metro line in Warsaw. The route will pass through areas free of immediate buildings, characterised by a much lower concentration of infrastructure than in the centre of the capital, which is why the whole stretch of the line will be executed in slurry walls using the cut-and-cover method. The double-track tunnel B21 between Slodowiec and Stare Bielany stations, which is 773 m long and 9.8 m wide, has been designed as a two-aisle monolithic reinforced concrete box, with a row of dividing columns in the middle, to be executed in an open trench. The B22 tunnel between Stare Bielany and Wawrzyszew stations, with internal dimensions of 4.8 m by 8.85 m and length of 655 m, will be built using the "top down" method with 60 cm-thick structural slurry walls. The tracks will be located at depths ranging from 4.5 to 9 metres below the surface. The Stare Bielany station (A21), comprising three 182.5 m-long aisles, will be built by the "roof first" technique. The 149 m-long Wawrzyszew station (A22) will be executed in steel anchor shoring with cut-and-cover method. The assignment will be executed in the record time of fifteen and a half months and will be completed by October 2007. Visit www.acciona.es 31-32/06.A consortum of PeBeKa and PRG Metro received a PLN297 million contract to build tunnel B23 on metro line 1 in Warsaw between Wawrzyszew and Mlociny stations, including 669 m of two-track twin-tube tunnel, to be built between diaphragm walls, and underground station Mlociny (A23), 142 m in length. PeBeKa and PRG Metro will also build tunnel B20 between Marymont and Slodowiec stations. Visit www.pebeka.com.pl and www.prgmetro.pl. Read E-News Weekly 43/2005. Visit www.metro.waw.pl 31-32/06.Competitive dialogues, deadline 3rd December, 2007 for design and construction of the central section of Warsaw’s second metro line from Ronda Daszynskiego to Dworca Wilenskiego. This is a 6.3 km section with seven stations. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=244054-2007, OJ S 201, or contact ZTM, Warsaw, fax +48 226554679 or 226554687. E-mail t.kielczewski@metro.waw.pl 43/07.ILF of Austria and its Polish branch have been appointed to carry out the feasibility study for the central section from Daszynskiego roundabout to Wilenski railway station on Line 2 of the Warsaw metro. The contract is worth PLN3.3 million. This 6.3 km includes seven stations. Visit www.ilf.com and www.metro.waw.pl 47/07.Metro Warszawskie, the Warsaw metro company, selected a joint venture of Metroprojekt and Andrzej M. Choldzynskit (AMC), an architectural office, for the conceptual design of the central section of Warsaw's second metro line from Daszynski roundabout to Wilenski railway station. This 6 km section includes a crossing of the Vistule river. More in E-News Weekly 50/2007. Visit www.metro.waw.pl, www.metroprojekt.pl and www.amcholdzynski.pl 52/07-01/08.The Warsaw underground transportation operator Metro Warszawskie received three offers in a tender for the construction of the 6.5 km central section of the second metro line. The previously qualified consortia led by the France's Vinci and by Spain's Ferrovial together with Budimex Dromex did not place their offers in the tender. Metro Warszawskie estimated the gross price at PLN2.8 billion but the offers range from nearly PLN5.9 billion to PLN6.2 billion. The lowest bid was made by a consortium of PBG, Hydrobudowa Polska, PRG Metro, Alpine Bau and Spain's FCC with its offer standing at PLN5,885 million. The second offer of PLN5,978 million was made by Mostostal Warszawa, Acciona Infraestructuras, Strabag, Dywidag and PeBeKa. The third offer of Dragados, Pol-Aqua, Trakcja Polska and two other Spanish companies amounts to PLN6,226 million. All three consortia pledge to build the segment from Daszynski Roundabout to Wilenski train station in 42 months. The section includes seven stations (Daszynski Roundabout, ONZ Roundabout, Swietokrzyska, Nowy Swiat, Powisle, Stadion and Dworzec Wilenski). However, the best offer in economic terms was placed by the consortium led by Mostostal Warszawa. This consortium's price does not include an advanced payment by the contractor and thus it may be ranked first. The final decision has not been made yet. The whole execution of the investment is under threat as the offers exceed by far the anticipated budget. Visit www.metro.waw.pl 25/08.Invitation to tender for TBM construction of line 2 tunnels, shafts and subways for 6.5 km from Rondo Daszynskiego to Dwarzec Wilenski, including 7 stations, deadline 16.02.2009. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=269416-2008 OJ S203 Contract duration 48 months. Contact e.ekla@metro.waw.pl 43/08.



Permalink

Warsaw - pl/11 MetroJV headed by the Italian contractor Astaldi with Polish PBIDM (10%) and Turkish Gulemark (45%) secured the contract for TBM construction of Line 2 tunnels, shafts and subways for 6 km from Rondo Daszynskiego to Dwarzec Wilenski, including 7 stations. Value EUR750 million for completion 2013. Visit www.metro.waw.pl, www.astaldi.com and www.gulermak.com.tr. 19/09



Permalink

Contract for design and construction of Line 2 from Daszynskiego Roundabout to Old Town stations awarded to consortium led by Astaldi SpA of Rome, tel +39 48226200523, www.astaldi.com, value EUR 768 million excluding VAT. More from Eva Okla at City of Warsaw, tel +48 2265546-76, fax -79, e-mail e.okla@metro.waw.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=310572-2009. 46/09.



Permalink

The JV Astaldi (45 percent)/ PBIDM (Poland)/Gulermak (Turkey) signed the EUR800 million contract for the construction of the central section of Warsaw metro Line 2. The new 6.7 km-long section, from Rondo Daszynskiego to Dwarzec Wilenski, including seven stations and a river crossing, will be built using three TBMs. Visit www.astaldi.it. 15/13.



Permalink


The Astaldi Group has been awarded a EUR 209 million contract to extend Line 2 of the Warsaw metro. The contract includes the design and the construction of the 3km route’s eastern section, from the Dworzec WileÅ„ski Station to the stabling tracks past Station C-18, featuring twin-tube tunnels and 3 underground stations. The tunnels will be excavated using the two TBMs that have already been employed for the first section of the line. The contract also calls for building the link with the line’s central section, as well as the civil and railway systems, superstructure, and all related works. The works are planned to be completed in 36 months, beginning in early 2016.

The works are commissioned by Metro Warszawskie Sp.z o.o., the public company in charge of the operations of the underground in the Polish city on behalf of the Municipality of Warsaw. The works will be financed with European funds and through a local budget. Visit http://www.metro.waw.pl/ and www.astaldi.it. 45/15. 




Permalink

The Municipality of Warsaw received two tenders for the EUR310 million contract for the extension works of metro Line 2 in Warsaw. The first ranked is the JV Astaldi (50%)/Gulermak (50%) and the second ranked is Sinohydro Corporation Ltd  from Beijing.

The bid calls for designing and building the 4 km western underground Section 3 of metro Line 2 in Warsaw from the C04 station to the Mory (STP) technical station (workshop/depot). The section will include three stations, the technical station and a parking, Duration of the works will be  4-years. The awarding and consequent signing of the contract will take place upon the companies meeting the requirements of Polish law. Visit http://www.metro.waw.pl/  and http://www.astaldi.com/en. 12/18.



Permalink

CONTRACT NOT AWARDED - The procurement for the 2020-2022 maintenance and repair of fire alarm systems, fixed gas and water extinguishing devices, fire gates and smoke curtains on the 1st and 2nd lines of the Warsaw Metro and STP Kabaty has been discontinued. The contract was not awarded. Contact Metro Warszawskie, attn Piotr Siwek, Warsaw, tel +48 226554677, email zam-eh@metro.waw.pl. For bid documents click here and here.

Ref.n. WP.25.00092.2019.S.P.PISI. 41/19.



Permalink

Open invitation to tender, deadline 20/11/2019, for the 2020-2022 maintenance and repair of fire alarm systems, fixed gas and water extinguishing devices, fire gates and smoke curtains on the 1st and 2nd lines of the Warsaw Metro and STP Kabaty. For bid documents https://postepowania.metro.waw.pl/servlet/HomeServlet where offers must be sent. Contact Metro Warszawskie, attn Piotr Siwek, Warsaw, tel +48226554677, email zameh@metro.waw.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=492975-2019. Ref.n. WP.25.00241.2019.S.P.PISI. 44/19.



Permalink

 RAJ International  from Warsaw secured the EUR76.02 million (PLN346.86 million) contract, excluding VAT,  for the 2020-2022 maintenance and repair of fire alarm systems, fixed gas and water extinguishing devices, fire gates and smoke curtains on the 1st and 2nd lines of the Warsaw Metro and STP Kabaty. Contact Metro Warszawskie, attn Piotr Siwek, Warsaw, tel +48226554677, email zameh@metro.waw.pl. for tender information please click here Ref.n. WP.25.00241.2019.S.P.PISI. 52/19.



Permalink

The group  Gülermak (Turkey)/Astaldi (Italy) secured the EUR307,09 million (PLN1.40 bn)  contract, including VAT, for the new 4 km north-eastern section of the metro line 2 in Warsaw.  The section includes three new stations: C19 Zacisze (ulica Figara/Rolanda), C20 Kondratowicza (ulica Kondratowicza – Targówek City Hall area) and C21 Brodno (ulica Kondratowicza and ulica Rembielińska). For further tender information please click here. 18/18.



Permalink


Open invitation to tender, deadline 28/06/2021, for the pre-design works for the First Stage of the metro Line 3 in Warsaw, involving an 8 km section with 6 stations (Dworzec Wschodni, MiÅ„ska, Rondo Wiatraczna, Ostrobramska, Jana Nowaka-JezioraÅ„ski and GocÅ‚aw) and the Kozia Gorka Technical and Parking Station (STP). For bid documents, please click here, where tenders must be sent. Contact Metro Warszawskie, Warsaw, tel +48226554677, email zam-eh@metro.waw.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=264436-2021. Ref.n. WP.25.00087.2021.K.I.PALA. 21/21. 

 




Permalink


ILF Consulting Engineers Polska Sp.z.o.o. from Warsaw have secured the EUR 3.44 million (PLN15.62 million) contract, excluding VAT,  for the pre-design works for the First Stage of the metro Line 3 in Warsaw, involving a 8 km section with 6 stations (Dworzec Wschodni, MiÅ„ska, Rondo Wiatraczna, Ostrobramska, Jana Nowaka-JezioraÅ„ski and GocÅ‚aw) and the Kozia Gorka Technical and Parking Station (STP). Contact Metro Warszawskie, Warsaw, tel +48226554677, email zam-eh@metro.waw.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=632262-2021. Ref.n. WP.25.00087.2021.K.I.PALA. 02/22. 



Permalink

Open invitation to tender, deadline 07/05/2024, for the pre-design of the Warsaw Metro Line IV, 26 km long with 23 stations, two of which are shared with the M2 and M3 respectively. The contract also includes the technical station and the Warsaw station. Click here for bid/tender documents. Contract duration is 38 months. Contact Miasto StoÅ‚eczne Warszawa, Warsaw, tel +48 22 655 46 72, email zam-eh@metro.waw.pl. Visit https://ted.europa.eu/en/notice/-/detail/224580-2024 and https://ted.europa.eu/en/notice/-/detail/164900-2024. Ref. n. WP.25.00024.2024.K.I.PAWA. 16/24. 



Permalink

Portugal

Portugal, Madeira - pt/45

Road

Closing Date: 07.02.2023 (Tender Closed)


Open invitation to tender, deadline 07/02/2023, for the connection between Quebradas to Amparo, 1st Phase – Tunnels. For tender documents, please click here where tenders must be sent.  Value of the contract is EUR 23 million, excluding VAT. Duration of the contract will be 24 months. Contact Região Autónoma da Madeira-Secretaria Regional de Equipamentos e Infraestruturas-Direção Regional de Estradas, Funchal, email dre.srei@madeira.gov.pt, tel +351 291207272, fax +351 291225688. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=001586-2023.  Ref.n. CPI/6/2022-DRE. 01/23. 

 

Portugal-Funchal: Construção de túnel rodoviário

2023/S 001-001586

Anúncio de concurso

Obras

Base jurídica:
Diretiva 2014/24/UE

Secção I: Autoridade adjudicante

I.1)Nome e endereços
Nome oficial: Região Autónoma da Madeira-Secretaria Regional de Equipamentos e Infraestruturas-Direção Regional de Estradas
Número de registo nacional: 671001329
Endereço postal: Rua Dr. Pestana Júnior, n.º 6, 2.º andar
Localidade: Funchal
Código NUTS: PT300 Região Autónoma da Madeira
Código postal: 9064-506
País: Portugal
Pessoa de contacto: Direção de Serviços Jurídicos da Direção Regional de Estradas
Correio eletrónico: dre.srei@madeira.gov.pt
Telefone: +351 291207272
Fax: +351 291225688
Endereço(s) Internet:
Endereço principal: https://www.madeira.gov.pt/drestradas
Endereço do perfil do adquirente: https://www.madeira.gov.pt/drestradas
I.3)Comunicação
Os documentos do concurso estão disponíveis gratuitamente para acesso direto, completo e ilimitado em: https://www.acingov.pt
Para obter mais informações, consultar o endereço indicado acima
As propostas ou pedidos de participação devem ser enviados para eletronicamente para: https://www.acingov.pt
I.4)Tipo de autoridade adjudicante
Autoridades regionais ou locais
I.5)Atividade principal
Outra atividade: Construção e Conservação de Estradas Regionais

Secção II: Objeto

II.1)Quantidade ou âmbito do concurso
II.1.1)Título:

Nova Ligação Quebradas – Amparo. 1.ª Fase - Túneis

Número de referência: CPI/6/2022-DRE
II.1.2)Código CPV principal
45221241 Construção de túnel rodoviário
II.1.3)Tipo de contrato
Obras
II.1.4)Descrição resumida:

Nova Ligação Quebradas – Amparo. 1.ª Fase - Túneis

II.1.5)Valor total estimado
Valor sem IVA: 23 000 000.00 EUR
II.1.6)Informação sobre os lotes
Contrato dividido em lotes: não
II.2)Descrição
II.2.3)Local de execução
Código NUTS: PT300 Região Autónoma da Madeira
Local principal de execução:

Concelho do Funchal, freguesia de são Martinho

II.2.4)Descrição do concurso:

Nova Ligação Quebradas – Amparo. 1.ª Fase - Túneis

II.2.5)Critérios de adjudicação
Critérios a seguir enunciados
Critério relativo à qualidade - Nome: Valor Técnico da Proposta / Ponderação: 50%
Preço - Ponderação: 50%
II.2.6)Valor estimado
Valor sem IVA: 23 000 000.00 EUR
II.2.7)Duração do contrato, acordo-quadro ou sistema de aquisição dinâmico
Duração em meses: 24
O contrato é passível de recondução: não
II.2.10)Informação sobre as variantes
São aceites variantes: não
II.2.11)Informação sobre as opções
Opções: não
II.2.13)Informação sobre os fundos da União Europeia
O contrato está relacionado com um projeto e/ou programa financiado por fundos da União Europeia: não
II.2.14)Informação adicional

Secção III: Informação de carácter jurídico, económico, financeiro e técnico

III.1)Condições de participação
III.1.1)Habilitação para o exercício da atividade profissional, incluindo requisitos em matéria de inscrição em registos profissionais ou comerciais
Lista e breve descrição das condições:

Alvará de construção emitido pelo Instituto dos Mercados Públicos, do Imobiliário e da Construção, I.P. (IMPIC, I.P.), contendo as seguintes habilitações:

• 3.ª Subcategoria (Túneis e outros trabalhos de geotecnia) da 5.ª Categoria (outros trabalhos): na classe correspondente ao valor da proposta.

• 7.ª Subcategoria (Drenagens e tratamento de taludes) da 5.ª Categoria (outros trabalhos): na classe correspondente à parte dos trabalhos a que respeitam.

Secção IV: Procedimento

IV.1)Descrição
IV.1.1)Tipo de procedimento
Concurso aberto
IV.1.3)Informação acerca do acordo-quadro ou sistema de aquisição dinâmico
IV.1.8)Informação relativa ao Acordo sobre Contratos Públicos (ACP)
O contrato é abrangido pelo Acordo sobre Contratos Públicos: não
IV.2)Informação administrativa
IV.2.2)Prazo para a receção das propostas ou pedidos de participação
Data: 07/02/2023
Hora local: 17:00
IV.2.3)Data prevista de envio dos convites à apresentação de propostas ou dos convites para participar aos candidatos selecionados
IV.2.4)Línguas em que as propostas ou os pedidos de participação podem ser apresentados:
Português
IV.2.6)Período mínimo durante o qual o concorrente é obrigado a manter a sua proposta
Duração em meses: 4 (a contar da data-limite para receção das propostas)
IV.2.7)Condições de abertura das propostas
Data: 08/02/2023
Hora local: 10:00

Secção VI: Informação complementar

VI.1)Informação sobre o carácter recorrente
Contrato recorrente: não
VI.3)Informação adicional:

- Caução 2%

- Documentos de habilitação conforme estabelecido no Programa do procedimento

- Documentos da proposta conforme estabelecido no Programa do procedimento

VI.4)Procedimentos de recurso
VI.4.1)Organismo responsável pelos processos de recurso
Nome oficial: Secretário Regional de Equipamentos e Infraestruturas
Endereço postal: Rua Dr. Pestana Júnior, n.º 6, 2.º Piso
Localidade: Funchal
Código postal: 9064-506
País: Portugal
Correio eletrónico: dre.srei@gov.madeira.pt
Telefone: +351 291207272
Fax: +351 291225688
Endereço Internet: https://www.madeira.gov.pt/drestradas
VI.4.2)Organismo responsável pelos processos de mediação
Nome oficial: Secretaria Regional de Equipamentos e Infraestruturas
Endereço postal: Rua Dr. Pestana Júnior, n.º 6, 2.º Piso
Localidade: Funchal
País: Portugal
VI.5)Data de envio do presente anúncio:
28/12/2022



Permalink

The consortium Tecnovia/Afavias from Madeira have secured the EUR22.85 million contract, excluding VAT, for the connection between Quebradas to Amparo, 1st Phase – Tunnels. Contact Região Autónoma da Madeira, Funchal, tel +351 291207272, fax +351 291225688, email dre.srei@madeira.gov.pt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=338951-2023.  Ref.n. CPI/6/2022-DRE. 23/23. 



Permalink

Portugal, Lisbon - pt/44

Road


Eyssa - Tesis, Tecnologia de Sistemas Electronicos SA from Lisbon secured the EUR803,880 contract, excluding VAT, for the technical assistance, preventive and corrective maintenance services for the 1725 m Marques de Pombal tunnel in Lisbon. Contact Empresa Municipal de Mobilidade e Estacionamento de Lisboa (EMEL), Lisbon, email aprovisionamento@emel.pt. For further on the tender, please click here. Ref. CPI 34/2020. 03/21. 

 




Permalink


Imprensa Nacional-Casa da Moeda, S. A. (INCM) from Lisbon secured the EUR7.19 million, excluding VAT, for the refurbishment of the 1.5km Avenida Joao XXI road tunnel in Lisbon. Contact  Município de Lisboa, Lisbona, tel +351 217806100, email dmmc.dges.dle@cm-lisboa.pt. Visit https://ted.europa.eu/en/notice/-/detail/553475-2024. 38/24.



Permalink

Portugal, Centro - pt/43

Railway

Closing Date: 11.11.2019 (Tender Closed)

Open invitation to tender, deadline 11/11/2019, for the refurbishment of the 34km Pampilhosa-Santa Comba Dao section. This tender includes 10 tunnels and 8 bridges, which is part of the Beira Alta line and includes the construction of a 3.2km direct link between the North line and Beira Alta line. Value of the contract is EUR 66 million, excluding VAT. Duration of the contract 840 days. For bid documents please click here, here and here where offers must be sent. Contact Infraestruturas de Portugal SA, Almada, tel +351 212879780, fax +351 211021839, email marco.abreu@infraestruturasdeportugal.pt

Ref.n. 5010040955. 44/19.



Permalink

Postponed from 11/11/2019 to 19/11/2019 the deadline of the open invitation to tender for the refurbishment of the 34km Pampilhosa-Santa Comba Dao section. This tender includes 10 tunnels and 8 bridges, which is part of the Beira Alta line and includes the construction of a 3.2km direct link between the North line and Beira Alta line. Value of the contract is EUR 66 million, excluding VAT. Duration of the contract 840 days.  For bid documents click here and here where offers must be sent. Contact Infraestruturas de Portugal SA, Almada, tel +351 212879780, fax +351 211021839, email marco.abreu@infraestruturasdeportugal.pt.  Ref.n. 5010040955. 45/19.



Permalink

Portugal, Lisbon - pt/42

Flood prevention

Closing Date: 11.06.2018 (Tender Closed)

Open invitation to tender, deadline 11.06.2018, for the construction of the drainage tunnels and ancillary works in Lisbon. Value of the contract is EUR106.30 million, excluding VAT. Duration contract 1200 days. For bid documents http://www.acingov.pt/agingov/, where offers must be sent.

Contact Municipio de Lisboa, Lisbon, email dmpo.dges.dle@cm-lisboa.pt. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=478760-2017,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=517512-2017

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=129709-2018.

Ref.n. 0001/CPI/DGES/ND/2017. 15/18.



Permalink

Postponed until 31.10.2018 the deadline of the open invitation to tender for the construction of the drainage tunnels and ancillary works in Lisbon.

Value of the contract is EUR106.30 million, excluding VAT. Duration contract 1200 days. For bid documents http://www.acingov.pt/agingov/, where offers must be sent.

Contact Municipio de Lisboa, Lisbon, email dmpo.dges.dle@cm-lisboa.pt. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328684-2018 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=293428-2018 .

 Ref.n. 0001/CPI/DGES/ND/2017. 32/18.



Permalink

Invitation to tender, deadline 10.09.2018, for inspection services, coordination of safety, environmental and risk management during the construction of the drainage tunnels and ancillary works in Lisbon. Value of the contract is EUR2.75 million, excluding VAT. Duration contract 1200 days. For bid documents http://www.acingov.pt/agingov/, where offers must be sent. Contact Camara Municipal de Lisboa, Lisbon, email dmpo.dges.dle@cm-lisboa.ptt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=309337-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=157364-2018.

32/18.



Permalink

The contract  for the construction of the drainage tunnels and ancillary works in Lisbon was not awarded. Contact Municipio de Lisboa, Lisbon, email dmpo.dges.dle@cm-lisboa.pt. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118745

-2019 . Ref.n. 0001/CPI/DGES/ND/2017. 11/19.



Permalink

Open invitation to tender, deadline 13/01/2020, for the construction of two drainage tunnels between Monsanto and Santa Apolonia (TMSA, length 5 km, diameter 5.5 m) and between Chelas and Beato (TCB, length 1 km, diameter 5.5 m)  and ancillary works in Lisbon . Value of the contract is EUR140 million, excluding VAT. Duration of the contract is 1200 days. For bid documents click here and here , where offers must be sent. Contact Municipio de Lisboa, Lisbon, tel +351 217988000, fax +351 217988000, email geral@cm-lisboa.pt.

Ref.n. 01/CPI/DGES/ND/2019. 43/19.



Permalink


On the 03/02/2021 the consortium Mota Engil (leader) and Spie Batignolles secured the EUR 132.9 million contract, excluding VAT, for the construction of two drainage tunnels, one basin and 3 shafts for the Lisbon Drainage Master Plan.  The largest tunnel is between the Monsanto and Santa Apolonia river (TMSA, length 5 km, diameter 5.5 m) and the other tunnel is between Chelas and Beato (TCB, length 1 km). For tender documents please visit https://www.acingov.pt/acingovprod/1/. Contact Municipio de Lisboa, Lisbon, tel +351 217988000, fax +351 217988000, email geral@cm-lisboa.pt. Ref.n. 01/CPI/DGES/ND/2019.  05/21. 



Permalink


Mota-Engil, Engenharia e Construcao SA from Porto secured the EUR139 million contract, excluding VAT, for the construction of two drainage tunnels between Monsanto and Santa Apolonia (TMSA, length 5 km, diameter 5.5 m) and between Chelas and Beato (TCB, length 1 km, diameter 5.5 m)  and ancillary works in Lisbon . Contact Municipio de Lisboa, Lisbon, tel/fax +351 217988000, email geral@cm-lisboa.pt. For further on the tender, please click here. Ref.n. 01/CPI/DGES/ND/2019. 18/21. 

 




Permalink

Portugal, Madeira - pt/41

Irrigation

Closing Date: 10.04.2017 (Tender Closed)


Open invitation to tender, deadline 10.04.2017, for the Levada do Norte - Lanço Sul - Tunel do Espigao project, which involves the  renovation of existing infrastructure for conveying and storing water for irrigation purposes, and to reduce  water losses. The contract includes the construction of a 4.9m tunnel between Ameixieira and Espigao to be used for irrigation water transport and for water storage (minimum 15 000 m3) and other ancillary works.Value of the contract is EUR13.5 million, excluding VAT. Duration contract 640 days. Contact ARM - Aguas e Residuos da Madeira SA, Funchal, tel +351 291201020, fax +351 291201021, email geral@aguasdamadeira.pt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=068227-2017. Ref.n. 06.0039. 08/17.




Permalink

Postponed until 29.09.2017 is the deadline of the open invitation to tender for the Levada do Norte - Lanço Sul - Tunel do Espigao project, which involves the  updating of existing infrastructure for conveying and storing water for irrigation purposes, and to reduce  water losses. The contract includes the construction of a 4.9m tunnel between Ameixieira and Espigao to be used for irrigation water transport and for water storage (minimum 15 000 m3) and other ancillary works. The value of the contract is EUR15.5 million, excluding VAT. Duration of the contract is 900 days. Contact ARM - Aguas e Residuos da Madeira SA, Funchal, tel +351 291201020, fax +351 291201021, email geral@aguasdamadeira.pt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216647-2017. Ref.n. 06.0039. 24/17.



Permalink

The open invitation to tender, deadline 16.10.2017, for the Levada do Norte - Lanço Sul - Tunel do Espigao project, which involves the renovation of existing infrastructure for conveying and storing water for irrigation purposes, and to reduce  water losses and the construction of a 4.9m tunnel between Ameixieira was not awarded.  Contact ARM - Aguas e Residuos da Madeira SA, Funchal, tel +351 291201020, fax +351 291201021, email geral@aguasdamadeira.pt. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=521361-2017

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=371946-2017 .

Ref.n. 06.0039. 52/17.



Permalink

Open invitation to tender, deadline 05.02.2019, for the Levada do Norte - Lanço Sul - Tunel do Pedregal, project, involving the construction of a 5405 m tunnel between Ameixieira (Serra d'Água) and Pedregal (Ribeira Brava) and of a 200 m tunnel between the main tunnel and Ribeira da Varanda for conveying and storing water for irrigation purposes. Value of the the contract is EUR17.5 million, excluding VAT. Duration of the contract is 660 days. Contact ARM - Aguas e Residuos da Madeira SA, Funchal, tel +351 291201020, fax +351 291201021, email geral@aguasdamadeira.pt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=542825-2018 .

Ref.n. 06.0039. 50/18.



Permalink

The JV between Afavias, Engenharia e Construções SA from Calheta and Tecnovia Madeira, Sociedade de Empreitadas SA fromFunchal secured the EUR16.60 million contract, excluding VAT, for the Levada do Norte - Lanço Sul - Tunel do Pedregal, project, involving the construction of a 5405 m tunnel between Ameixieira (Serra d'Água) and Pedregal (Ribeira Brava) and of a 200 m tunnel between the main tunnel and Ribeira da Varanda for conveying and storing water for irrigation purposes. Contact ARM - Aguas e Residuos da Madeira SA, Funchal, tel +351 291201020, fax +351 291201021, email geral@aguasdamadeira.pt. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221303-2019.

Ref.n. 06.0039. 20/19.



Permalink

Portugal, North Region - pt/40

Hydropower


The consortium headed by Ferrovial Agroman, of which local company MSF is also a member, has been selected by Iberdrola to build the Gouvaes hydroelectric plant on the Tamega river, in northern Portugal. The project will cost EUR80 million and is to be completed in 47 months. It comprises construction of the underground main machine hall (120 m long, 20 m wide and 44 m high) to hold four 220 MW generators (880 MW in total) and the underground transformer hall (80 m long, 17 m wide, 14 m high). Ferrovial Agroman will also be in charge of digging 5 km of tunnels and 8 vertical shafts measuring up to 320 m and with a diameter of 7 m. Visit https://www.iberdrola.com. 03/17.




Permalink