Closing Date: 23.04.2025 (Tender Closed)
Open invitation to tender, deadline 23/04/2025, for the design and construction works of the C1 Tymbark -Limanowa section on the railway line n. 104, part of project including the new railway line n.622 Podleze - Szczyrzyc - Tymbark/Mszana Dolna and also modernization of the existing railway line n. 104 Chabowka - Nowy Sacz - Stage II. In total 14 km of new tracks will be built with a new 2 km tunnel between Tymbark and Koszary. Click here for bid/tender documents and where tenders must be sent. Duration of contract 44 months. Contact PKP Polskie Linie Kolejowe SA, Warsaw, tel +48 224732488, email agata.biskupska@plk-sa.pl. Visit https://ted.europa.eu/en/notice/-/detail/186055-2025 and https://ted.europa.eu/en/notice/-/detail/104726-2025, https://www.podleze-piekielko.pl. Ref.n. 090/IRZR1/00635/00375/25/P. 16/25.
Permalink
For Currency Converter click HERE
20.05.2025 Romania
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
30.05.2025 Poland
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
13.06.2025 Norway
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.