The consortium Kolin Insaat, Turizm Sanayi Ve Ticaret Anonim Sirketi from Ankara secured the EUR335.85 million (PLN1.42 billion) contract for the design and construction of the S19 expressway on the Lutcza – Domaradz section (with a junction), approx. 6.43 km long and including the two-lane tunnel approximately 1 km long under Mount Hyb. Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Rzeszow, tel +48 17 853-40-71, email
sekretariatrzeszow@gddkia.gov.pl. Visit
https://ted.europa.eu/en/notice/-/detail/363401-2024. Ref.n. O.RZ.D-3.2410.8.2022. 25/24.