The consortium NDI S.A. from Sopot (Leader), Dogus Insaat Ve Ticaret AS from Maslak (Sariyer) and Dogus Construction Poland from Varsaw secured the EUR1.25 bn (PLN5.31 bn) contract, including VAT, for the technical design, the executive design and the construction of the S6 Western road bypass of Szczecin - Section 3 Police - Goleniow (from km 27+403 to km 50+810.20), including a 5km bi-tube tunnel under Oder river. Contact GDDKiA (Generalna Dyrekcja Drog Krajowych i Autostrad), attn Iwona Gabska, Szczecin, tel +48 914325320, email igabska@gddkia.gov.pl. Visit https://gddkia.eb2b.com.pl/ and https://www.gov.pl/. Ref.n. OSz.D-3.2410.11.2024. 44/25.