The consortium Gulermak SA (leader)/ Budimex SA from Warsaw secured the EUR455.69 million (PLN1.91 bn) contract, excluding VAT, for the design and construction of the 5.25 km Jawornik - Lutcza section of the S19 expressway. The section includes the T-2 road tunnel (a 3km bitube tunnel). Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Rzeszow, tel +48 17 853-40-71, email sekretariatrzeszow@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/718670-2024. Ref.n. O.RZ.D-3.2410.5.2022. 48/24.