Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Nordland - no/59

Road

Open call for bids, deadline 30th June, 2003 for construction of 14.4 km road section Gullersfjordbotn-Austerstraumen, including the 6.4 km Sí¸rdals tunnel. It is a 8.5 m-wide single-tube tunnel to be blasted in gneiss. Rockbolts and shotcrete will be implemented for the support and dumper trucks will be used for muck removal. Cost: NOK320 million approximately, financed by the national public roads administration. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=096200-2003, OJ S 107, or contact Statens Vegvesen Region nord, Bodí¸, fax +47 75552951. E-mail firmapost-nord@vegvesen.no and einar.karlsen@vegvesen.no 24/03.The three bidders for the construction of the Gullersfjordbotn-Austerstraumen road section including the 6.4 km Sí¸rdals tunnel through the Brynjulfslí¥ttheia mountain are Scandinavian Rock Group (lowest bidder with NOK212.7 million), Leonhard Nilsen & Sí¸nner (NOK224.7 million) and Mesta AS (NOK 233.4 million). 29/03.Scandinavian Rock Group (SRG) will build road section Gullersfjordbotn-Austerstraumen, including the 6.4 km-long 8.5 m-wide Sí¸rdals tunnel, a single bore to be blasted in gneiss. Contract value NOK212.7 million. Visit www.srg.no 36/03.Open invitation to tender, deadline 7th November, 2005 for the delivery of directional control fans for four tunnels: Soerdals (6,370 m), Ingelsfjord tunnel (1,240 m), Raftsund (1,530 m) and Fjoesdal (1,600 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=177580-2005, OJ S 179, or contact Statens vegvesen, Bodoe, fax +47 75586501. E-mail robjak@vegvesen.no 38/05.



Permalink

Norway, Rogaland - no/58

Road

Open call for bids, deadline 7th July, 2003 for construction of the Iversflaten tunnel, approximately 1 km, plus electro works on county road Rv 13. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=086656-2003, OJ S 96, or contact Statens Vegvesen region west, Leikanger, fax +47 57655986 or 51911791. E-mail reg-3@vegvesen.no and knut.utaaker@vegvesen.no 22/03.Open call for bids, deadline 16th May, 2006 for construction of a new 6.8 km road (Rv 519) from Hanasand to Ladstein. The project will supply a mainland connection to Finní¸y and Talgje islands from Hanasand. The project comprises an approx. 5.8 km subsea tunnel, T-crossings with access ramps in the main tunnel, an approx. 1.5 km tunnel to Talgje island and approx. 1.3 km of road in open air. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=056702-2006, OJ S 54, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986. E-mail rolf.harkestad@vegvesen.no 12/06.



Permalink

Norway, More & Romsdal - no/57

Roadway

Open call for bids, deadline 26th May, 2003 for collection, interpretation and reporting of refraction and reflection seismic measurements at sea and on land for three subsea tunnel projects named Langfjord connection, Sande mainland connection and Mí¸re connection. Length is still not decided but Langfjorden will be approximately 6.7 km, Sande approximately 6.2 km and Mí¸re around 7.5 km. Tunnel profile T8.5 (width 8.5 m for two lanes). Expected geology for the Mí¸re and Langfjorden connections will be mainly gneisses and for the Sande connection, some gneisses and some limestone/marble. Drill/blast tunnelling. Support with shotcrete, rock bolts and armed shotcrete arches. Projects in early design. Estimated costs: NOK400-800 million (Langfjorden), NOK350-800 million (Sande) and NOK450-1,000 million (Mí¸re). Financing probably by toll. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=060728-2003, OJ S 69, or contact Statens Vegvesen Region Midt, Molde, fax +47 71274101. E-mail torkild.andal@vegvesen.no 19/03.



Permalink

Norway, Oslo - no/56

Highway

Open call for bids, deadline 2nd June, 2003 for construction plans, tender documents and follow-up during construction for a new 700 m immersed tunnel under the Oslo harbour at Bjí¸rvika between the Festnings tunnel and the Ekeberg tunnel on road E18, including connections with the existing road/street network. The works consist of engineering design services for big concrete constructions, complicated foundation works and rock tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=063650-2003, OJ S 72, or contact Norwegian national road administration, Oslo, fax +47 23054158 or 4001. E-mail svein.roed@vegvesen.no. Visit www.vegvesen.no/oslo/bjorvika/bjorvika.stm 16/03.Open procedure, deadline 20th May, 2005 for construction of the Bjoervika immersed tunnel under Oslo Harbour. It is a 675 m tunnel connecting the existing Festning and Ekeberg tunnels. The tunnel has 2 x 3 lanes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031938-2005, OJ S 33, or contact Statens vegvesen Region east, Lillehammer, fax +47 61257480 or 24058774. E-mail firmapost@vegvesen.no or sveroe@vegvesen.no. Subscribe to E-News Weekly 4/2005. 08/05.The Norwegian public roads administration announced its intention to award the Sjoedel contract to Skanska, Bam Civiel and Volker Stevin, who submit an offer of NOK968 million for the immersed tunnel piece in the Bjoervika project at Oslo harbour. The project consists of a 670 m-long 35 to 40 m-wide 6-element immersed tube at 112 m under the sea level. The contract is expected to be signed at the beginning of August with work on site starting at the beginning of September when the necessary detailed plans/documentation have been approved. Completion is expected in 2010. Another contract for this project has also been signed. Subscribe to E-News Weekly 28/2005 & 23/2005 and read E-News Weekly 4/2005. Visit www.skanska.no 28/05.Open call for tenders, deadline 5th November, 2007 for delivery of booster fans for the Bjí¸rvika tunnels in Oslo including a 675 m-long immersed tunnel under the harbour and its ramps, 503 m of cut-and-cover tunnels and ramps totalling 1.2 km with a rectangular shape for one, two or three lanes at Sí¸renga, a new 420 m-long 9.5 m-wide rock tunnel in Mosseveien/Grí¸nlia and 620 m of enlarged existing tunnels and the ramps. Read E-News Weekly 39/2007, 40/2005, 28/2005, 26/2005, 23/2005, 4/2005, 18/2002 & 10/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=223948-2007, OJ S 183, or contact Statens vegvesen Region east, Lillehammer, tel. +47 81522000 or 24058759. E-mail mari.barstad@vegvesen.no. Also visit www.vegvesen.no/bjorvika 40/07.Open call for tenders, deadline 22nd May, 2008 for fire protection of the Bjí¸rvika tunnel in Oslo. The contract includes delivery and installation of fire protection on the roof and walls (approx. 39,400 sq m and approx. 10,850 sq m, respectively), delivery and installation of fireproof seals in structure joints (approx. 350 m of element joints in the immersed tunnel section, approx. 1,300 m of segment joints in the immersed tunnel section and approx. 3,300 m, of section joints in the cast-on-site section of the tunnel), engineering design/detailed planning of fire protection/fireproof seals as described above. Read E-News Weekly 39/2007, 40/2005, 28/2005, 26/2005, 23/2005, 4/2005, 18/2002 & 10/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=279483-2007, OJ S 229, or contact Statens vegvesen region east, Lillehammer, tel. +47 81 522000 or fax +47 24058774. E-mail kjell.furre@vegvesen.no 49/07.Vifter & Miljí¸ received a NOK5 million contract for delivery of booster fans for the Bjí¸rvika tunnels in Oslo including a 675 m-long immersed tunnel under the harbour and its ramps, 503 m of cut-and-cover tunnels and ramps totalling 1.2 km with a rectangular shape for one, two or three lanes at Sí¸renga, a new 420 m-long 9.5 m-wide rock tunnel in Mosseveien/Grí¸nlia and 620 m of enlarged existing tunnels and the ramps. Visit www.vifter.no 12/08.Invitation to tender for delivery and installation of shaft fans and associated equipment at four ventilation towers at Bjorvika tunnels on highway E18 in Oslo. http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=268483-2008 OJ S202 Tender deadline 27.11.2008 for commencement of works on 19.01.2009 and completion by 01.11.2009. Contact e-mail kjetil.flotre@vegvesen.no tel +47 81 52 20 00. 43/08.



Permalink

Open invitation to tender, deadline 11.05.2009, for delivery of 23 controllable barriers with foundations for newly established closing points in Festning, Bjorvika and Ekeberg tunnels and other associated places on E18 highway. Contract to start 08.06.2009 for completion 01.03.2011. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091065-2009Open invitation to tender, deadline 12.05.2009, for 12 LED variable information boards and road signs for Bjorvika tunnel on E18 highway. Contract to start 09.06.2009 for completion 15.02.2010. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091066-2009More information, including specs and docs for both bids, from Kjetil Flotre at Statens vegvesen in Lillehammer, tel +47 8152 2000, e-mail kjetil.flotre@vegvesen.no. 14/09.



Permalink

Contract for concrete elements for fireproofing walls of concrete tunnels in the Havnelageret, Sjodelen and Sorenga areas of Bjorvika project awarded to BetongPartner AS, Teglversveien 18, Andalsnes, Norway, value EUR3,467,613 excluding VAT. Typical dimensions of the concrete elements, which are to be tiled on the side facing traffic, are 12-15 cm thickness, 3.5 m height, and 3.3 m length, and a total area of 21,200 sq m is required. See tunnelbuilder archive no/56 for project history. More from BetongPartner, tel +47 712277-40, fax -41, e-mail kontor@betong-partner.no. Further project details from Kjell Furre at Statens vegvesen in Lillehammer, tel +47 81522000, e-mail kjell.furre@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098031-2009 15/09.



Permalink

Open invitation to tender, deadline 10.06.2009, for delivery and installation of pumps with associated equipment at the pumping station in the Gronlia tunnel of the E18 Bjorvika project. Contract to commence 10.07.2009 for completion 20.11.2009. Specs and docs from Kjetil Flotre at Statens vegvesen in Oslo, tel +47 81522000, e-mail kjetil.flotre@vegvesen.no to whom tenders or requests to participate should be sent. 19/09. Site inspection scheduled for 11.05.2009 at 12.00. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124622-2009. 19/09.



Permalink

Open invitation to tender, deadline 24.02.2017, for the renovation of Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, the eastern part of the Opera tunnel. The VALUE Range of the contract is EUR44 - 60.49 million, excluding VAT.

For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/150443. Tenders must be sent to the Norwegian Public Roads Administration, Eastern Region, attn Kjetil Flotre, Oslo, tel  +47 91139522, e-mail kjetil.flotre@vegvesen.no. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer,  tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=456612-2016. Ref.n. 16/73369. 52/16.



Permalink

Skanska has signed the EUR54.56 million contract for the renovation of the Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, Norway. The project consists mainly of electrical work, fire protection and improved cleaning solutions for the tunnels. In addition, new technical buildings will be built, evacuation routes will be upgraded, a new layer of asphalt will be added and all signs will be replaced. The work will begin in the summer of 2017 and will be completed before summer 2019. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer,  tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://group.skanska.com/media/203108/Skanska-renovates-tunnels-in-Oslo%2c-Norway%2c-for-NOK-516M%2c-about-SEK-550M. Ref.n. 16/73369. 19/17.



Permalink

Skanska Norge AS from Oslo secured the contract for the renovation of the Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, which is the eastern part of the Opera tunnel. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer,  tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318393-2017. Ref.n. 16/73369. 32/17.



Permalink

Competitive procedure with negotiation, deadline 04.02.2019, for the renovation of the Festning tunnel on the E18 highway in Oslo, also the western part of the Opera tunnel and the pump station at Bygdoylokket. The value of the contract is EUR19.42 million, excluding VAT, and the duration of the contract is 17 months. For bid documents and further information  http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=225727&B=VEGVESEN where offers must be sent. Contact Norwegian Public Roads Administration in Oslo, attn Bjorn Oystein Kroken, tel +47 47272268, email bjorn.kroken@vegvesen.no.Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=004419-2019.

Ref.n. 18/222374. 02/19.



Permalink

Skanska Norge AS from Oslo secured the EUR27.59 million (NOK267.19 million) contract, excluding VAT, for the renovation of the Festning tunnel on the E18 highway in Oslo, also the western part of the Opera tunnel and the pump station at Bygdoylokket. Contact Norwegian Public Roads Administration in Oslo, attn Bjorn Oystein Kroken, tel +47 47272268, email bjorn.kroken@vegvesen.no.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285725-2019.

Ref.n. 18/222374. 26/19.



Permalink

Norway, Hordaland - no/55

Hydropower

Periodic information notice, deadline 17th March, 2003 for construction of the Blí¥fjell power station including a 6.2 km tunnel and a new underground power house. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=038359-2003, OJ S 44, or contact Sunnhordland Kraftlag, Stord, fax +47 53414170. E-mail dagfinn.vatne@sunnhordland-kraftlag.no 11/03.NCC is building the Sima hydro power project in Eidfjord for Statkraft Energi at a cost of NOK31.5 million. The project includes a 1.6 km water tunnel, excavated section 11 sq m, and a 160 m access tunnel, excavated section 14 sq m. Other underground structures include a short shaft (3-5 m) to the inlet concrete construction in Onevatn and another short shaft (2 m) to the existing water tunnel with connection to the Sima power plant. Concrete plug with steel pressure gate in the access tunnel. The excavation method is drill and blast with three drives for the water tunnel. First, 2 x 450 m is bored in alternate excavation from the access tunnel's end. Then, approx. 700 m will be excavated in one-way excavation. One Atlas Copco AC 282 jumbo (model approx. 1995) is used. The geology is massive bedrock (gneiss, granite and megmatite). Support with Orsta bolts, in average 0.2 per metre of tunnel. Loading and haulage with one Toro 301 underground loader equipped with 3 cu m bucket (2 tractors with strengthened trailers). The site is without road access, located approx. 1,000 m above sea level. All equipment transportation is done by helicopter and snow vehicles. The tunnel started on 15th May, 2005 and is expected to finish on 15th October, 2005. All works (except final clearing of the tunnel and inlet sites) to be finished on 1st December, 2005. Visit www.ncc.no, www.atlascopco.com, www.toro.sandvik.com and www.orstastaal.no 35/05.



Permalink

Norway, Vestfold - no/54

Highway

Statkraft Grí¸ner has been awarded a NOK3.5 million engineering design of the Kopstad-Gulli section of highway E18 in Vestfold county, including three bored tunnels: Flí¥r (west tube, 870 m / east tube 850 m), Dí¸vik (west tube, 570 m / east tube, 600 m) and Hem (west tube, 910 m / east tube, 940 m). All T9.5 profile (9.5 m in width). Also two cut-and-cover tunnels: Steinbjí¸rnrí¸d (2 x 110 m, 11 m-wide) and Gulli (2 x 175 m, 13 m-wide). Visit www.vegvesen.no/vestfold and www.statkraftgroner.no 08/03.Open invitation to tender, deadline 26th March, 2004 for construction of a new four-lane section of motorway E 18 from Kopstad to Gulli. Lot 1 Kopstad-Solerí¸d is 5.5 km in length and includes two dual-lane rock tunnels: Flí¥r (west tube, 870 m / east tube 850 m) and Dí¸vik (west tube, 570 m / east tube, 600 m) and one dual-lane cut-and-cover tunnel: Steinbjí¸rnrí¸d (2 x 110 m, 11 m-wide). Lot 2 Solerí¸d-Gulli is 7 km in length and includes one dual-lane rock tunnel: Hem (west tube, 910 m / east tube, 940 m) and two dual-lane cut-and-cover tunnels: Gulli (2 x 175 m, 13 m-wide) and Svartedal (2 x 60 m, 11.5 m-wide). Planned method for rock tunnels is drill/blast with rockbolts and sprayed concrete as support. Work periods: August 2004-October 2007 (lot 1) and October 2004-October 2007 (lot 2). Cost for all tunnels: NOK424 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=174131-2003 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=174131-2003, OJ S 193, or contact Statens vegvesen Region sí¸r, Arendal, fax +47 33371640. E-mail karl.hoiland@vegvesen.no 43/03.Open call for tenders, deadline 5th October, 2005 for the delivery of booster fans for 3 two-lane tunnels on the E18, section Kopstad-Gulli. Total length: 2 x 2,300 m. Click no/54. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=132093-2005, OJ S 133, or contact Statens vegvesen Region south, Arendal, fax +47 33049995. E-mail oyvinp@vegvesen.no 29/05.



Permalink

Open invitation to tender, deadline 20.05.2011, for construction contract 1, Gulli-Holmene, comprising major upgrade of 6.7 km of 24 km-long E18 Gulli-Langaker highway. Completion deadline 30.10.2014. Further information, specs and docs from Oyvind Pettersen-Dahl at Statens vegvesen Region south in Arendal, tel +47 81548000/33371652/91780274, to whom tenders or requests to participate must be sent. Tender conference at 12.00 on 08.04.2011 at SV project office at Sem in Tonsberg. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=226163. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=093074-2011. 12/11.



Permalink

Open invitation to tender, deadline 12.08.2011, for construction contract 3, Tassebekk-Langaker, comprising major upgrade of 10.2 km of 24 km-long E18 Gulli-Langaker highway. Further information, specs and docs from Arvid Veseth at Statens vegvesen Region south in Sem, tel +47 33355612/91823741, to whom tenders or requests to participate must be sent. Tender conference at 12.00 on 24.05.2011 at SV project office at Sem in Tonsberg. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=230635. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=156396-2011. 20/11.



Permalink

Award of contract, value EUR97.12 million excluding VAT, to Skanska Norge of Oslo for construction contract 3, Tassebekk-Langaker, comprising major upgrade of 10.2 km of 24 km-long E18 Gulli-Langaker highway. Further information from Arvid Veseth at Statens vegvesen Region south in Arendal, tel +47 81548000/33355612, e-mail arvid.veseth@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=309814-2011. 40/11.



Permalink

Open invitation to tender, deadline 02.04.2013, for electro and SRO works on 24 km-long E18 Gulli-Langaker highway. Completion deadline 30.10.2014. Register interest at www.doffin.no/Search/Search_Switch.aspx?ID=279335. Further information, specs and docs from Oyvind Pettersen-Dahl at Statens vegvesen Region south in Arendal, tel +47 91780274, e-mail oyvinp@vegvesen.no, to whom tenders or requests to participate must be sent. Tender number 2013002973. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=019758-2013. 04/13.



Permalink

Award of contract 2013002973 to Scanmatic Elektro AS of Staubo, Norway for electro and SRO works on 24 km-long E18 Gulli-Langaker highway. Contract completion deadline 30.10.2014. Further information from Oyvind Pettersen-Dahl at Statens vegvesen Region south in Arendal, tel +47 02030, e-mail firmapost-sor@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=280152-2013. 34/13.



Permalink

Norway, Vest-Agder - no/53

Highway

Negotiated procedure, deadline 15th January, 2003 for a DBFO contract for the 18 km-long Handeland-Feda section of the 38 km-long Lyngdal-Flekkefjord highway. Eight kilometres will run in tunnel. Tender value NOK1-1.2 billion. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=155614-2002, OJ S 197 or contact Norwegian public roads administration, Oslo, fax +47 22073673. E-mail firmapost@vegvesen.no 42/02.



Permalink

Open invitation to tender, deadline 15.08.2014, for the renovation of three tunnels on the E39 at Flekkefjord in Vest-Agder county. The three tunnels are Austad (1,040 m), Drangeid (765 m) and Loga (840 m). Contact Statens vegvesen Region South, att.n Oystein Lien, Arendal, tel +47 02030, e-mail oystein.lien@vegvesen.no.  Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=208442-2014. Ref. n. 2014040867. 26/14.



Permalink

Risa A/S of Naerbo secured the EUR17.67 million contract, excluding VAT, for the renovation of three tunnels on the E39 at Flekkefjord in Vest-Agder county. The three tunnels are Austad (1,040 m), Drangeid (765 m) and Loga (840 m). Contact Statens vegvesen Region South, att.n Oystein Lien, Arendal, tel +47 02030, e-mail oystein.lien@vegvesen.no.  Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=372879-2014. Ref. n. 2014040867. 45/14.



Permalink


Negotiated invitation to tender, deadline 05/10/2020, for engineering design, construction of and warranty responsibility for a new four-lane motorway E39 Lyngdal East - Lyngdal West. The stretch between the Herdalen junction and Royskar junction in Lyngdal municipality, includes approx. 2.5 km open air road,  the 3.4km Rossas and the 2.7 km Kalas tunnels, the two bridges Kvelland (over Lygna river) and Harikstad (170 m), two motorway junctions with connections to the existing road network. The value of the contract is EUR288.83 million (NOK2.9 bn), excluding VAT. Duration of the contract is from 28/05/2021 to 31/12/2024. Contact Nye Veier, attn Ruben Ramsland, Kristiansand, email anskaffelser@nyeveier.no. For further on the tender, please click here and here. 37/20.   




Permalink


Nye Veier, planner and operator of Norwegian motorways selected the Joint Venture of Implenia (69%) and Stangeland (31%) as preferred suppliers for the motorway E39 Lyngdal east - Lyngdal west. The route is part of the development E39 Sorvest between Kristiansand and Stavanger, and runs between Herdal and Roysgard in Lyngdal municipality. The legally binding decision and contract award is expected in the middle of July, 2021. It is a EUR 288.83 million (NOK2.9 bn) turnkey contract. Approximately 10 km of four-lane motorway will be built, of which 6.2 km will be tunnels, bridges and level crossings. Construction is scheduled to start in autumn 2021 and will continue until summer 2025.  

Implenia will plan and construct the tunnels as well as the concrete structures while Stangeland will be in charge of building the roads. Sweco Norway has been chosen as the design consultant and will be responsible for the detailed design of bridges, structures, tunnels and roads. Visit https://implenia.com/en and https://www.tsmaskin.no/. 19/21 

 




Permalink


The JV Implenia Stangeland E39 Lyngdal ANS from Lysaker  secured the EUR 279.47 million (NOK4.9 bn) contract, excluding VAT, for engineering design, construction of and warranty responsibility for a new four-lane motorway E39 Lyngdal East - Lyngdal West. The stretch between the Herdalen junction and Royskar junction in Lyngdal municipality, includes approx. 2.5 km open air road,  the 3.4km Rossas and the 2.7 km Kalas tunnels, the two bridges Kvelland (over Lygna river) and Harikstad (170 m), two motorway junctions with connections to the existing road network. Contact Nye Veier, attn Ruben Ramsland, Kristiansand, email anskaffelser@nyeveier.no. For further on the tender, please click here. 28/21.   

 




Permalink

Norway, Bergen - no/52

Ring Road

Norconsult has secured a €2.8 million contract to design a 10 km section of the city's ring road including three double-tube tunnels (1.6 km, 2.6 km, and 3.5 km), cross sections 2 x 55 sq metres, to be built in hard rock, probably using drill/blast. Work may start in 2004-2005. Norconsult is also responsible for the geological studies. Project cost around €250 million. Financing by the Norwegian public roads administration and toll. Visit www.norconsult.no 42/02.Three double-tube tunnels are planned on the west ring road in Bergen with connection to Flesland airport. From south to north, they are Birkelandsvatnet-Dolvik (1,640 m), which is partly a subsea tunnel, Dolvik-Sandeidet (2,600 m) with branch to existing road at Straume, and Sandeidet-Liavatnet (3,670 m). In Sandeidet, there is a second alternative with an underground connection. In that case, there will be one continuous tunnel from Dolvik to Liavatnet. Distance between tubes is about 10 m. Connections between the tubes every 250 m. Cross sections 2 x 53.5 sq m. Geology consisting of mostly of gneiss and amphibolite in the northern section, granite and gabbro in the south. Drill/blast method. In case of a continuous tunnel in Sandeidet, there may be a short cut-and-cover section. Support with rockbolts and shotcrete. Permanent lining of 4.5 m high concrete elements at the tunnel walls. Type of lining in the tunnel roof has not been decided yet. Project awaiting final approval of the plans and financing. Estimated work start in 2005. The project may be divided in several stages depending on financing. Geology studies by the University in Bergen. Experts from Statens Vegvesen - the Norwegian public roads administration - have investigated the risk for water leakages in the subsea sections. Risk analysis by Safetec Risk Management. Cost approx. NOK2.2 billion. Toll financing. Visit www.vegvesen.no 12/03.Open call for bids, deadline 12th July, 2004 for detailed plans and tender documents for national roads Rv 556 and Rv 557 between the airport road and Sandeide in Bergen. The assignment includes the Ytrebygsvegen, a 2 km two-lane road including roundabouts, and section Dolvik-Sandeide, a 3 km four-lane road including tunnels and intersections, part of the Bergen toll ring road system. The first stage includes one tunnel between Dolvik and Sandeidet. This tunnel will be lengthened to Liavatnet in a second stage without any open stretch at Sandeidet. There will be four separate on/off ramps with underground connection to the main tubes. The total tunnel length from Dolvik to Liavatnet will be about 6.5 km. Length of first stage is about 2.5 km. The length of the Kokstad tunnel south of Dolvik is about 1,650 m. Twin tubes of 50 sq m. Drilling and blasting, mostly in gneiss, with rock bolts and fibre-reinforced shotcrete as support. Mucking-out method to be decided by the contractor. Dates for work start depends on final financing. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079929-2004, OJ S 100, or contact Statens vegvesen Region west, Leikanger, fax +47 55168715. E-mail kjell.myre@vegvesen.no 24/04.Open call for bids, deadline 4th May, 2006 for first construction stage of Bergen's west ring road, national road 557, consisting of a four-lane road between Dolvik and Sandeide and including a first 6.8 km tunnel section and other works. There will be six tunnel portals in all. View alignment map here. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=049609-2006, OJ S 47, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986. E-mail ottar.midtkandal@vegvesen.no 11/06.Norconsult got the contract for the detailed plans for all the roads of the west ring road in Bergen. Value: NOK6,846,500. Visit www.norconsult.no 11/06.Mesta has submitted the low bid for a section of the Bergen west ring road, including a 6.8 km tunnel and other works, with NOK601,323,771. The other bidders are: Skanska (NOK610,137,387), NCC (NOK648,619,919) and Veidekke (NOK690,358,848). Click no/52. Visit www.mesta.no 24/06.Open call for tenders, deadline 15th January, 2008 for impulse ventilators with a combined driving power of 72-80 kN for fire ventilation in a new 2.6 km-long tunnel on Bergen's west ring road, section Dolvik-Sandeide. The maximum impeller diameter of the ventilator is 1.6 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=269769-2007, OJ S 221, or contact Stateng vegvesen Region west, Leikanger, tel. +47 281544010. E-mail gunnlo@vegvesen.no 47/07.Bemel Norge, Witt & Sohn's partner in Norway, pocketed a NOK7.2 million contract to supply impulse ventilators with a combined driving power of 72-80 kN for fire ventilation in a new 2.6 km-long tunnel on Bergen's west ring road, section Dolvik-Sandeide of road Rv 557. Visit www.bemel.no and www.wittfan.de 17/08.Open invitation to tender, deadline 23.02.2009, for planning and engineering design services for 4 km-long section of Bergen ring road west between Sandeide and Liavatnet with four-lane road in twin tube tunnel. Contract period 01.04.2009 to 31.12.2013. The assignment also includes detail plans, tender documents, and follow-up during the construction phase. Further information from Elzbieta Tysper at Statens Vegvesen, Leikanger, tel +47 8154 4010, e-mail elzbieta.tysper@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=012039-2009 03/09.



Permalink

Open invitation to tender, deadline 12.01.2011, for contract K20 construction of second stage of ring road west, comprising extension of existing T9 section two-lane, twin-tube tunnel 3.9 km from Sandeide to Liavatnet with concrete portals and 700 m of exit ramps and associated infrastructure. Ground injection necessary in some areas. Water table and vibration restrictions apply beneath habitation and nature areas. Contract duration 14.03.2011-15.06.2015, value EUR98 million - EUR123 million. Further information from Ottar Midtkandal at Statens vegvesen Region vest in Leikanger, tel +47 81544010, fax +47 57655986, e-mail ottar.midtkandal@vegvesen.no. For project history visit tunnelbuilder archive no/52. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=319976-2010. 43/10.



Permalink

Award of contract to Af Gruppen Norge AS of Oslo, value EUR104.4 million excluding VAT, for contract K20 construction of second stage of ring road west, comprising extension of existing T9 section two-lane, twin-tube tunnel 3.9 km from Sandeide to Liavatnet with concrete portals and 700 m of exit ramps and associated infrastructure. Further information from John Fallmyr at Af Gruppen Norge, tel +47 90882280, e-mail john.fallmyr@afgruppen.no and Ottar Midtkandal at Statens vegvesen Region vest in Leikanger, tel +47 81544010, fax +47 57655986, e-mail ottar.midtkandal@vegvesen.no. For project history visit tunnelbuilder archive no/52. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=181323-2011. 23/11.



Permalink

Open invitation to tender, deadline 06.06.2013, for stage 2 K26 electrical and SRO installation work on Fv557 Ringveg Vest Construction section between Sandeide and Liavatnet with four-lane road in twin tube tunnel. Contract value EUR13-17 million, excluding VAT. Register interest at http://www.doffin.no/Search/Search_Switch.aspx?ID=287280. Further information, specs and docs from Terje Gundersen at Statens vegvesen in Leikanger, tel +47 02030, e-mail terje.gundersen@vegvesen.no, to whom tenders or requests to participate must be sent. Time limit for requests for documents 23.05.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=133497-2013. 17/13.



Permalink

Norway, More & Romsdal - no/51

Highway

Open tendering, deadline 22nd August, 2002 for lengthening by approximately 2,050 m of the existing Rotsethorn tunnel, on state road 651 in Volda municipality. Cross section 63 sq m (profile T8.5), two 3.25 m-wide lanes. Drill/blast method in gneiss. Support with shotcrete and rockbolts. Work to begin in July 2002. Opening to traffic in June 2004. Total cost NOK110 million financed on public funds. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 118, document 92050-2002 or contact Statens Vegvesen Mí¸re og Romsdal, í…lesund, fax +47 70175076. 26/02.



Permalink

The joint venture between KA Aurstad AS from  Hovdebygda, BKK Enotek AS from Kokstad and Norsk Bergsikring AS from Stongfjorden secured the contract for tunnel improvements for the Sunnmore – Tender 3 of the E39 Rotsethorn Tunnel. Contact Statens Vegvesen Oslo, attn Ronnaug Bersas, tel +47 02030, email ronnaug.bersaas@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=373592-2018.

Ref.n. 16/171594. 35/18.



Permalink

Norway, í˜stfold - no/50

Highway

Open tendering, deadline 16th August, 2002 for detailed plans, development and construction plans for widening from two to four lanes the E6 highway, sections Alvim-Bjí¸rnstad and Bjí¸rnstad-Rí¥de totalling 10.2 km. On the latter section, there is a 900 m tunnel plus a cut-and-cover tunnel in soft soil. Contract duration from September 2002 to January 2004. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 116, document 90638-2002 or contact Statens Vegvesen í˜stfold, Moss, fax +47 69243501. 26/02.



Permalink

Open invitation to tender, deadline 16.01.2012, for construction of 4 km of two-lane E18 from Homsvedt to Melleby in Larvik including four bridges and a short tunnel. Contract commences 01.03.2012 for completion 01.07.2014. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=243865. Time limit for accessing documents 16.12.2011. Further information, specs and docs from Jorn Pettersen at Statens vegvesen Region east in Mysen, tel +47 90540874, e-mail jorn.pettersen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=367150-2011. 47/11.



Permalink