Austria

Austria, Ischgl - at/37

Highway

Open invitation to tender, deadline 30th March, 2001, for road construction including 775 m-long tunnel for ATL, Innsbruck, fax +43 512 508 4005. Contact through www.ischgl.at 10/01.



Permalink

Austria, Linz - at/36

Tramway

Restricted tendering, deadline 12th February, 2001, for 1.8 km-long tramway tunnel. Contact LEFV, Linz fax +43 732 7801 7980. Visit http://ted.eur-op.eu.int 07/01.Award of contract to construct 1.8 km-long NATM tunnel to Hinterregger, Ostu-Stettin, Dyckerhoff & Widmann for completion 2004. Linzer Elektrizitats, fax +43 732780 17980. Visit www.dywidag.de 40/01.Negotiated procedure, deadline 24th August, 2007 for detailed planning for the Harter Plateau tramway line in Linz. This 5.5 km line includes a 2 x 900 m-long bored tunnel to access to the existing underground railway station. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=187258-2007, OJ S 150, or contact Linz Linien, Linz, +43 7323400157972. E-mail einkauf@linzag.at 33/07.Schimetta Consult, BHM Ingenieure and Laabmayr & Partner landed a EUR4.8 million contract to carry out the detailed planning for the 5.5 km Harter Plateau tramway line in Linz, which includes a 2 x 900 m-long bored tunnel to access to the existing underground railway station. Visit www.schimetta.at, www.bhm-ing.com, www.laabmayr.at 11/08.Negotiated procedure, deadline 14th August, 2008 for construction of a 2,070 m section of the Harter Plateau tramway line, including a nearly 1 km twin bored single-track tunnel, with four cross-passages, under the í–BB tracks in the area of main railway station, a 440 m cut-and-cover dual-track tunnel and other associated works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=192256-2008, OJ S 143, or contact Linz Linien, Linz, +43 7323400157972. E-mail einkauf@linzag.at 31/08.



Permalink

Invitation to tender by negotiated procedure, deadline 16.07.2009, for supply, installation and commissioning of ventilation equipment for tunnel section of the Harter Plateau tramway line. Contract duration 01.01.2010 - 31.12.2011. For more in German click here or contact Managementservice Linz GmbH, Linz, Ing.Markus Schopper, tel +43 7323400-8552, fax -158552, e-mail m.schopper@linzag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=173897-2009 27/09.



Permalink

Imtech Austria Anlagentechnik GmbH of Linz have secured the contract for supply, installation and commissioning of ventilation equipment for the tunnel section of the Harter Plateau tramway line. For more, contact Ing. Harald Grogger at Managementservice Linz GmbH in Linz, tel +43 7323400-7982, fax -157982, e-mail h.grogger@linzag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=059736-2010. 10/10.



Permalink

Austria, Feldkirch - at/35

Motorway

Open invitation to tender for construction of 3 km-long twin-tube highway tunnel, deadline 17th January, 2001. Details from Strassenbau Feldkirch, fax +43 552 2333 27885 or visit http://ted.eur-op.eu.int December 2000.



Permalink

Austria, Vienna - at/34

High Speed Railway

  IGT, Salzburg presenting designs for 76 sq m twin-tube and 120 sq m single tube alternatives for proposed 11.64 km Wienerwald tunnel on Vienna-St Polten line in flysch and molasse. Invitations to tender planned for 2001 with construction between 2002 and 2006, value $240-290 million. October 2000. A jv of iC consulenten, Elektrowatt Infra, Basler Hofmann and Strobl has been awarded the detailed design of the Wienerwald tunnel in May 2002. The 11.7 km-long railway tunnel with two single-track tubes will be designed and tendered for the option of TBM or NATM construction. Tenders for construction are scheduled for August 2003. More from Josef Daller at iC consulenten, Vienna, j.daller@ic-vienna.at. Visit www.ic-vienna.at 33/02.Award to ILF, Maidl and SMH of a €800,000 contract for engineering and consultancy for tender documents and tender planning for the Perschling tunnels consisting of three single double-track tubes on the new west railway Vienna-St Pölten. Lengths: 1,370 m + 3,293 m + 2,775 m. Width: 13 to 14 m. Construction methods: NATM or TBM in molasse. Tenders for construction to be invited at end-2003 or in mid-2004. Visit www.hl-ag.com and www.ilf.com 06/03.Open call for tenders, deadline 13th February, 2004 for construction of a 1.8 km section of the 10.9 km Wienerwald tunnel on the Vienna-St. Pölten section. The project also includes galleries and shafts for three emergency exits, one cavern and three ventilation shafts. The Wienerwald tunnel will be a dual-tube single-track tunnel with 22 cross passages every 500 m. The tunnel will be built in flysch and in molasse. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=175484-2003, OJ S 195, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186107. E-mail franz.bauer@hl-ag.com 43/03.Negotiated procedure, deadline 30th March, 2004 for geological and hydrogeological documents and geological consultancy during construction of the Wienerwald tunnel between Vienna and St Poelten. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024110-2004, OJ S 27, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186126. E-mail marko.koren@hl-ag.com 10/04.The four bidding groups for the 13 km Wienerwald tunnel on the Vienna-St Poelten line are Strabag, Oestu-Stettin, Hinteregger and Wayss & Freytag; Alpine Mayreder, Walter Bau, Beton- und Monierbau and Habau; Zueblin, Hochtief, Jaeger Bau and Swietelsky; and Porr and Bilfinger Berger. NATM will be used. The contract is worth EUR340 million. Award in June 2004. 11/04.Open invitation to tender, deadline 11th May, 2004 for geotechnical measurements during NATM or TBM construction of the 13 km Wienerwald tunnel on the new Vienna-St Polten line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=052226-2004, OJ S 61, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 16/04.Open call for bids, deadline 6th August, 2004 for construction of the Vienna-St. Poelten section, lot 3 Perschling tunnel succession, including three tunnels: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m) as well as shafts, emergency exits, portals and an at-grade section between the Stierschweiffeld and Raingruben tunnels. Each of these three tunnels has two tracks. Diameter of about 12.5 m. The expected geology is molasse and flysch. TBM or New Austrian Tunnelling Method, depending on the proposals. Bids to be opened in August 2004. Construction start in February 2005 for completion in October 2009. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079867-2004, OJ S 100, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186197 or 18957769457. E-mail ma-plwo4@hl-ag.com 24/04.Negotiated procedure, deadline 21st June, 2004 for construction management during excavation of the Reiseberg, Stierschweiffeld and Raingruben tunnels on the Vienna-St. Poelten line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=083406-2004, OJ S 102, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 24/04.Construction of the 2 x 13.1 km Wienerwald tunnel on the Vienna-St Poelten rail section has been awarded by Eisenbahn-Hochleistungsstrecken to Porr Tunnelbau and Bilfinger Berger, for EUR340 million. After thorough analysis of the construction methods, it has been decided that tunnel boring machines will be used on most of the tunnel route. It is the first time TBMs will be used outside urban areas in Austria. Two 10.7 m-diameter TBMs will excavate 2 x 10.7 km with an expected daily advance of about 25 m. Both tubes will be connected by 26 cross passages. Both machines will start in autumn 2005 from the west side and are expected to hole through in autumn 2007. From September 2004, some 2 x 2,400 m of tunnel will be driven by conventional means from the east portal in difficult ground conditions. Finishing work and equipment will take place until fall 2009. When it opens, the tunnel will cut trips from Vienna to Saint Poelten to 25 minutes. Technically challenging, the Wienerwald tunnel is the longest rail tunnel and second longest tunnel all types included ever launched in Austria. Visit www.hl-ag.com, www.porr.at and www.bilfinger.de 31-32/04.Negotiated procedure, deadline 9th September, 2004 for work inspection during construction of the 2 x 13.1 km Wienerwald tunnel on the Vienna-St Poelten rail section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=130222-2004, OJ S 150, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 35/04.Negotiated procedure, deadline 6th September, 2004 for construction supervision of the Perschling tunnel succession, including three 12.5 m-diameter dual-track tunnels: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=128347-2004, OJ S 148, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 36/04.Negotiated procedure, deadline 27th September, 2004 for geological consultancy services during preparatory and excavation works of the Perschling tunnel succession. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=141415-2004, OJ S 163, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail judith.engel@hl-ag.com 36/04.Open invitation to tender, deadline 5th November, 2004 for geotechnical services required within the construction of the Perschling tunnels in Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=156525-2004, OJ S 163, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail judith.engel@hl-ag.com 39/04.ILF and CCC Purrer will be responsible for the construction management during excavation of the Reiseberg, Stierschweiffeld and Raingruben tunnels (1,370 m, 3,293 m and 2,775 m) on the Vienna-St. Poelten line. Visit www.ilf.com 51-52/04.Strabag pocketed a EUR115 million contract to build the Perschling dual-track tunnels on the Vienna-St. Poelten section, including three tunnels in Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m) as well as shafts, emergency exits, portals and an at-grade section between the Stierschweiffeld and Raingruben tunnels. Visit www.strabag.at 53/04-01/05.Open call for tenders, deadline 15th March, 2005 for construction of lot LT 44 "Gueterschleife" of the 12.3 km Lainzer tunnel. This is a 2.2 km section including a 200 m cut-and-cover section, approx. 1 km of single-track and double-track tunnel, to be built using NATM, and a 450 m cut-and-cover section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=215964-2004, OJ S 250, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186197 or 18957769207. E-mail plw1@hl-ag.com 03/05.TKP Strobl, Stolitzka and Verbundplan secured a EUR883,600 contract for geotechnical services required within the construction of the Perschling tunnels in Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit www.verbundplan.at 08/05.IGT (Ingenieurgemeinschaft fuer Geotechnik und Tunnelbau) will be responsible for the work inspection during construction of the 2 x 13.1 km Wienerwald tunnel on the Vienna-St Poelten rail section. Visit www.igt.co.at 11/05.A JV of IGT (Ingenieurgemeinschaft fuer Geotechnik und Tunnelbau) and Metz Partner will be responsible for the construction supervision of the Perschling tunnels, including three 12.5 m-diameter dual-track tunnels: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit www.igt.co.at and www.metz-partner.at 11/05.Meringer and Technisches Buro fur and Geotechnik Geologie (TBGG) secured a EUR717,700 contract for geological and hydrogeological consultancy during construction of the Perschling tunnels, including three 12.5 m-diameter dual-track tunnels on the Vienna-St. Poelten line: Reiseberg (1,370 m), Stierschweiffeld (3,293 m) and Raingruben (2,775 m). Visit www.tgm-online.com and www.baugeologie.co.at 12/05.Negotiated procedure, deadline 18th July, 2005 for construction management for contract LT 44 of the 12.3 km Lainz tunnel. This 2.2 km section includes a 200 m cut-and-cover section, approx. 1 km of single-track and double-track tunnel, to be built using NATM, and a 450 m cut-and-cover section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=125027-2005, OJ S 126, or contact Eisenbahn-Hochleistungsstrecken, Vienna, fax +43 18172186216. E-mail marko.koren@hl-ag.com 27/05.Hinteregger, Oestu Stettin and Gebr. Haider will build lot LT 44 "Gueterschleife" of the 12.3 km Lainzer tunnel. This is a 2.2 km section including a 200 m cut-and-cover section, approx. 1 km of single-track and double-track tunnel, to be built using NATM, and a 450 m cut-and-cover section. Visit www.hinteregger.co.at and www.oestu-stettin.at 38/05.Open call for tenders, deadline 13th December, 2005 for construction of lot LT31 "Maxing" of the 12.3 km Lainzer tunnel. This is a 3,050 m tunnel, cross section 129.05 sq m, to be bored in soft ground. The main part of the geology is Tertiary sediments (sand, clay, coarse gravel). Construction method will be the NATM, with hammer and cutter. Shotcrete, steel arches, lattice girders and bolts as support. Spoil clearance with loader and dumper. Expected date for contract award is 5th May, 2006. Expected date for tunnelling start is 19th June, 2006. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=172165-2005, OJ S 173, or contact OEBB, Vienna, fax +43 19300045829. E-mail michael.emberger@hl-ag.com 39/05.Negotiated procedure, deadline 22nd December, 2005 for work supervision for lot LT 31 "Maxing" of the 12.3 km Lainzer tunnel. Click at/34. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=231313-2005, OJ S 234, or contact OEBB-Infrastruktur Bau, Vienna, fax +43 19300045829. E-mail Marko.Koren@bau.oebb.at 50-51/05.Open call for tenders, deadline 3rd March, 2006 for construction of a 3.5 km railway tunnel (contract LT 33 Hofjagdstrasse), as part of the Lainz tunnel. Single-tube double-track tunnel, cross section of 140 sq m approximately, to be built using the drill/blast method. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=246524-2005, OJ S 249, or contact OEBB, Vienna, fax +43 19300045829 or 18957769227. E-mail thomas.buisman@bau.oebb.at 05/06.A JV of Hochtief, Alpine Mayreder and Beton und Monierbau signed a EUR132.2 million contract to build lot LT31 "Maxing" of the 12.3 km Lainz tunnel. This is a 3,050 m single-tube tunnel stretch, cross section 129.05 sq m, to be bored in soft ground. Click at/34 for other details. Visit www.hochtief.com, www.alpine.at and www.bemo.net 22/06.A JV of ILF and Geoconsult received a EUR4 million contract for construction supervision services for contract LT 33 of the Lainzer tunnel. This is a 3.5 km-long single bored dual-track tunnel, to be built using the drilling and blasting. Visit www.ilf.com and www.geoconsult.at 04/07.Porr Tunnelbau, Strabag and Züblin bagged a EUR88.7 million contract to build contract LT 33 of the Lainzer tunnel. This is a 3.5 km-long single bored dual-track tunnel, featuring a cross section of 145 sq m and expected to be built using drilling and blasting in accordance with NATM. Works, which commenced on 13th November, 2006 will last 48 months until October 2010. Visit www.porr.at/tunnelbau, www.strabag.com and www2.zueblin.de 05/07.Restricted invitation to tender, deadline 16th April, 2008 for the medium and low voltage installations for the Tullnerfeld station and tunnel equipment for the Perschling chain of tunnels on the Vienna-St. Pölten high speed rail section. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=69917-2008, OJ S 51, or contact í–BB Infrastruktur Bau, Vienna, fax +43 19300045799. E-mail martin.neulinger@bau.oebb.at 12/08.



Permalink

Invitation to tender under restricted procedure, deadline 14.05.2009, for supply, delivery and installation of power supply system in the 6.6 km-long connecting tunnel, part of Lainzer project, Vienna. More information about the project here. Contract duration 01.09.2009 - 04.03.2013. Contact ES ET, Ing. Martin Neulinger, Wien, tel +43 193000457-85, fax -99, e-mail martin.neulinger@bau.oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=106354-2009, OJ S 73. 17/09.



Permalink

Open invitation to tender, deadline 14.10.2009, for fencing, railing and safety equipment installation work (Lot WT4) in the 11.64 km-long Wienerwald tunnel on the Vienna-St Polten-Wienerwald line. Contract duration 01.03.2010 - 30.04.2012. Contact Roland Fischer at Oebb-Infrastruktur Bau AG in Vienna, tel +43 193000-45734, e-mail roland.fischer@bau.oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=241453. 41/09.



Permalink

Invitation to tender by negotiated procedure, deadline 21.10.2009, for ancillary works for electricity power lines on the Vienna-St Polten-Wienerwald line, including the 11.64 km-long Wienerwald tunnel. Contract duration 01.02.2010 - 21.12.2012. Contact Matthias Müller at Oebb-Infrastruktur Bau Aktiengesellschaft, Engineering Services /Energietechnik, Projektmanagement Sankt Pölten, in Vienna, tel +43 274293000-3362, fax -3370, e-mail matthias.mueller@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=275341. 41/09.



Permalink

Porr Technobau und Umwelt AG, Swietelsky GmbH and Strabag bagged a EUR69 million contract for final equipment of the 3.5 km-long Lainzer tunnel. Contact Hd. von DI Andreas Pechhacker at í–BB Infrastruktur Bau AG in Vienna, tel +43 193000-45701, e-mail andreas.pechhacker@bau.oebb.at.Visit www.porr.at/tunnelbau, www.swietelsky.at and www.strabag.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=356847-2009. 02/10.



Permalink

Invitation to tender by negotiated procedure, deadline 20.04.2010, for track support system and ballast for Lainzer and Wienerwald tunnels. Contact Elke Heigl at Oebb-Infrastruktur AG in Wien, tel +43 6642864183, e-mail elke.heigl@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096331-2010. 14/10.



Permalink

Negotiated invitation to tender, deadline 07.09.2015, for equipment maintenance in tunnels on the new railways Vienna-St. Polten, Innsbruck-Kufstein in Unterintal and Koralm. The contract is composed of six lots of duration 01.01.2016 to 31.12.2018, with a optional extension to 31.12.2020. Contact OEBB-Infrastruktur AG, represented by OEBB Business Competence Center GmbH, att.n Florian Fuehrer, Vienna, tel +43 19300032927, e-mailflorian.fuehrer@oebb.at. For electronic access www.oebb.at/m2c. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291490-2015. Ref.n. 2015/M2C ID-N.3723. 34/15.




Permalink

Austria, Tyrol and Vorarlberg - at/33

Railway

Twin-track 2.4 km-long Blisadona rail tunnel on Arlberg railway extension project awarded to Beton & Monierbau. Visit www.bemo.net October 2000. Contract award worth €350,000 to Geoconsult for geotechnical services for the escape and rescue tunnel system between the 14 km tunnel on the S16 highway and the parallel 10 km railway tunnel in Arlberg. Includes six 3 m-wide 3.8 m-high cross passages with intermediate shafts, 11.5 m in diameter, 13-29 m-high, equipped with a spiral ramp, a 400 m cross connection, and a 400 parallel rescue tunnel. Design plans by Verbundplan and Bernard + Partner. Visit www.asg.co.at and www.geoconsult.at 50/01.Tenders invited, deadline 4th February, 2002 to supply and install telecomm systems in the 2.4 km Blisadona tunnel. Visit http://ted.eur-op.eu.int, document S 246-169715 or fax +43 19300025261, Vienna. Also visit www.oebb.at 02/02.Negotiated procedure, deadline 4th October, 2004 for phase 2 of the renovation of the 10 km Arlberg railway tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=151161-2004, OJ S 176, or contact Oesterreichische Bundesbahnen, Bludenz, fax +43 55526111522. E-mail karl.hartleitner@pe.oebb.at 38/04.A group of companies including Rhomberg Bahntechnik, Beton- und Monierbau, Porr Technobau und Umwelt and Heitkamp Rail secured a EUR89 million contract for phase 2 of the renovation of the 10 km Arlberg railway tunnel. Visit www.bemo.net 35/05.Negotiated call for tenders, deadline 14th December, 2007 for supply, installation and commissioning of radio systems in the 10,651 m-long Arlberg tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=271027-2007, OJ S 222, or contact OEBB, Innsbruck, fax +43 51293000 83864841. E-mail werner.winkler@oebb.at 48/07.Open invitation to tender, deadline 19th August, 2008 for supply and assembly of 10 kV medium voltage and low voltage plants and tunnel lighting systems in the 10,589 m Arlberg rail tunnel between Saint Anton and Langen. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195678-2008, OJ S 145, or contact í–BB-Infrastruktur Bau, fax +43 512930004625. E-mail karl.mayer@bau.oebb.at 32-33/08.



Permalink

Austria, Innsbruck - at/32

Highway

Notice of award dated 12th October, 2000 of two tunnels on S16 Arlberg motorway Pians-Flirsch to jv of Beton u Monierbau/Universale/Alpine value $110 million of which up to 30% will be subcontracted. Sponsor is Otmar Alber, fax +43 512 520 12-134. Details at http://ted.eur-op.eu.int or visit www.bemo.co.at November 2000. Restricted invitation to tender, deadline 20th June, 2001, for design of 5.1 km-long twin-tube Roppener tunnel for Alpen Strassen, fax +43 512 520 12134. 26/01. Engineering planning contract awarded by Alpen StraíŸen to a jv of Bernard+Partner, Verbundplan, and Electrowatt Infra for the twin-tube Roppener tunnel, 5.1 km in length, on the A 12 highway for €533,000. Visit www.asg.co.at or www.ewi.ch 01/02.Restricted procedure, deadline 28th November, 2002 for engineering services for the Haiming-Tschirgant tunnel-Nassereith section of the A12 Inntal motorway. The tunnel will be 5 to 6 km in length. Planned date for work start in 2007. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=163983-2002, OJ S 207, or contact Alpen StraíŸen, Innsbruck, fax +43 51252012134. E-mail zentrale@asg.co.at 46/02.Preinformation notice for construction supervision of the second bore of the 5.1 km Roppener tunnel and refurbishment of the first tube, on the A12 Inn Valley highway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018666-2005, OJ S 19, or contact Asfinag, Vienna, fax +43 5010814482. E-mail otmar.alber@asfinag.at 05/05.Preinformation notice for geological consultancy of the second bore of the 5.1 km Roppener tunnel and refurbishment of the first tube, on the A12 Inn Valley highway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018665-2005, OJ S 19, or contact Asfinag, Vienna, fax +43 5010814482. E-mail otmar.alber@asfinag.at 05/05.Restricted procedure, deadline 16th June, 2005 for assistance to project management for the planning, tendering and construction phase of the second tube of the 5.1 km Roppener tunnel on the A12 highway in the Inn Valley. Estimated cost of the project: EUR115 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=091217-2005, OJ S 92, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 21/05.Restricted procedure, deadline 30th June, 2005 for construction supervision and management for the second tube of the 5.1 km Roppener tunnel on the A12 highway in the Inn Valley. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=109775-2005, OJ S 110, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at or gabriele.moerwald@asfinag.at 24/05.Restricted procedure, deadline 20th February, 2006 for geotechnical measurements, control measurements and scanning of documents during construction of the second tube (5,100 m) of the Roppener tunnel on the Inn Valley highway A 12, including the cross passages and rehabilitation of the existing tube. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=07872-2006, OJ S 7, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at and gabriele.moerwald@asfinag.at 04/06.Restricted procedure, deadline 20th February, 2006 for geological measurements during construction of the second tube (5,100 m) of the Roppener tunnel on the Inn Valley highway A 12, including the cross passages and rehabilitation of the existing tube. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=07861-2006, OJ S 7, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at and gabriele.moerwald@asfinag.at 04/06.Open call for bids, deadline 20th April, 2006 for construction of the second tube (5,097 m) of the Roppener tunnel on the Inn valley highway A 12, cross passages and refurbishment of the existing bore (5,100 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=047146-2006, OJ S 45, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 11/06.The deadline for bid submission for construction of the second tube (5,097 m) of the Roppener tunnel on the Inn valley highway A 12, cross passages and refurbishment of the existing bore (5,100 m) has been extended to 4th May, 2006. Click at/32. 15/06.Restricted call for tenders, deadline 19th June, 2006 for control and inspection during the remaining design phase and construction phase of the 4,310 m Tschirgant tunnel on the Inn valley highway A 12. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100812-2006, OJ S 94, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 23/06.Restricted call for tenders, deadline 2nd October, 2006 for construction management during excavation of the second Roppener tunnel (5.1 km) on the A 12 highway in the Inn valley, including also the cross passages to the existing tube and its rehabilitation. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188813-2006, OJ S 177, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010814482. E-mail baumanagement@asfinag.at 39/06.Open call for tenders, deadline 22nd October, 2007 for supply and installation of ventilation equipment (semi-transversal ventilation) for the second, 5.1 km Roppener tunnel and upgrading in the existing tunnel on highway A 12 in Inn valley. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205530-2007, OJ S 166, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 37/07.Open call for tenders, deadline 22nd October, 2007 for supply and installation of medium voltage supplies for the second, 5.1 km Roppener tunnel and upgrading in the existing tunnel on highway A 12 in Inn valley. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216592-2007, OJ S 177, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 39/07.Open call for tenders, deadline 20th December, 2007 for supply and installation of electromechanical equipment (low voltage, lighting, traffic management, traffic data acquisition, emergency call, telephones, cables, ventilation, etc.) in the new Innsbruck-bound Roppen tunnel and upgrading in the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251260-2007, OJ S 207, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 44/07.Open call for tenders, deadline 20th December, 2007 for supply and installation of instrumentation (video, emergency call, etc.) in the new Innsbruck-bound Roppen tunnel and upgrading in the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251254-2007, OJ S 207, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 44/07.Open invitation to tender, deadline 21st May, 2008 for radio equipment for the 2 x 5,050 m Roppener tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=82386-2008, OJ S 61, or contact Asfinag, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 15/08.Howden Ventilatoren will supply and install ventilation equipment (semi-transversal ventilation) in the second, 5.1 km Roppen tunnel and upgrade the existing tunnel on highway A 12 in Inn valley. Visit www.howden.com/en/Businesses/HowdenVentilatoren 36/08.Siemens Elin Buildings and Infrastructure has been contracted to supply and install medium voltage supplies in the second, 5.1 km Roppen tunnel and upgrade the existing tunnel on highway A 12 in Inn valley. This contract is worth EUR833,000. In addition, the company has been commissioned to supply and install electromechanical equipment (low voltage, lighting, traffic management, traffic data acquisition, emergency call, telephones, cables, ventilation, etc.) in the new Innsbruck-bound Roppen tunnel and upgrade the Bregenz-bound tube. The overall length is approx. 5,050 metres per tube. The contract totals EUR14.9 million. Visit www.siemenselin.at or www.siemens.com 36/08.Dürr pocketed a EUR6.4 million contract to supply and install instrumentation (video, emergency call, etc.) in the new Innsbruck-bound Roppen tunnel and upgrade the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit www.duerr-gruppe.at 36/08.



Permalink


Open invitation to tender, deadline 17.02.2016, for refurbishment of the twin tube Wilten tunnel (542m) and its E&M equipment on the A12 in Innsbruck. Contact Asfinag, attn Eng. Martin Jaeger, Vienna, tel +43 5010814276, fax +43 5010814272, e-mail martin.jaeger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=456675-2015. Ref.n. 2015/PROVIA ID-N.2154. 53/15.




Permalink


Ingenieurburo DI Andreas Brandner from Innsbruck secured the EUR 322,203 contract, excluding VAT, for the general management during the refurbishment of the twin tube Wilten tunnel (542 m) on the A12 in Innsbruck. For further information contact Asfinag, attn Eng. Martin Jaeger, Vienna, tel +43 5010814276, fax +43 5010814272, e-mail martin.jaeger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205903-2016. Ref. 2015/@AVA ID-N. 41541. 25/16. 




Permalink

Open invitation to tender, deadline 16.10.2017, for data collection, bypass study and impact analysis for the 6.5km  Landecker tunnel on the A12 in Innsbruck. The duration of the contract is from 04/12/2017 to 30/09/2018. Contact Asfinag, Vienna, tel +43 5010814276, fax +43 5010814272, email martin.jaeger@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=350577-2017. Ref.n. 2017/PROVIA ID-N.11427. 36/17.



Permalink

The open invitation to tender, deadline 16.10.2017, for data collection, bypass study and impact analysis for the 6.5km  Landecker tunnel on the A12 in Innsbruck has not been awarded. Contact Asfinag, Vienna, tel +43 5010814276, fax +43 5010814272, email martin.jaeger@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=090311-2018.

Ref.n. 2017/PROVIA ID-N.11427. 09/18.



Permalink

The Joint Venture ARGE between Amberg Engineering AG / SKAVA Consulting ZT GmbH from Regensdorf-Watt secured the EUR315,985.78 contract, excluding VAT, for a bypass study  for the 6.5km  Landecker tunnel on the A12 in Innsbruck.

Contact Asfinag, Vienna, tel +43 50108/14273, fax +43 5010814272, email karl.praxmarer@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022088-2019.

Ref.n. 2018/PROVIA ID-N.18665. 03/18.



Permalink


Open invitation to tender, deadline 16/11/2020, for the upgrading of the E&M equipment for the 2 x 5,050 m Roppener tunnel on the A12 motorway. Duration of the contract is from 01/02/2021 to 01/08/2024. For further information on the tender click here. Contact Asfinag, attn Mario Patigler, Vienna, tel +43 50108-14574, fax +43 50108-14482, email mario.patigler@asfinag.at. Ref. 2020/PROVIA ID-n.53893. 44/20. 

 




Permalink


LLP Engineering GmbH/Ingenieurburo fur Elektrotechnik from Salzburg secured the EUR410,553.44 contract, excluding VAT, for the upgrading of the E&M equipment for the 2 x 5,050 m Roppener tunnel on the A12 motorway. For further information on the tender click here. Contact Asfinag, attn Mario Patigler, Vienna, tel +43 50108-14574, fax +43 50108-14482, email mario.patigler@asfinag.at. Ref. 2020/PROVIA ID-n.53893. 07/21.  

 




Permalink


Open invitation to tender, deadline 02/11/2021, for A12 Sab Landecker Tunnel (6.5km ), Escape and Rescue Paths, Stsg and General Renovation – Planning. Duration of the contract is from 01/01/2022 to 31/12/2029. Contact Asfinag, Vienna, tel 43 66460108-14485, email ulrich.engbert@asfinag.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=endocid=495932-2021. Ref.n. 2021/PROVIA ID-N. 60000. 41/21



Permalink


Open invitation to tender, deadline 25/11/2022, for boreholes for geological exploration to be carried out in preparation for the overall project for the A12 Landecker Tunnel, escape and rescue routes, STSG and general renovation. The drilling starting points are in the existing road tunnel, both in the actual traffic area and in the breakdown bays.  The drilling lengths are in the range of 40 m to 50 m. Duration of the contract is from 01.04.2023 to 30.06.2023. Contact ASFINAG Construction Management GmbH, attn Eng. Engbert Ulrich, tel +43 664 6010814485, email ulrich.engbert@asfinag.at. Visit http://www.provia.at/. Ref.n. 2022/PROVIA n. 90015. 45/22. 



Permalink


Prior information notice, deadline 18/09/2023, for a safety tunnel and bypasses, for the A12 Landecker tunnel renovation. Estimated date of publication of contract notice: 18/09/2023. Contact ASFINAG, Vienna, tel +43 6010814484, email richard.loidl@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=487624-2023. 32/23. 



Permalink

 

Open invitation to tender, deadline 10/10/2023, for the partial renovation of the 2 x 5,050 m Roppener tunnel on the A12 motorway. The contract includes also upgrading of operational & safety technology. Duration of the contract is from 22/04/2024 to 26/09/2025. Click here for tender documents. Contact Asfinag, attn Mario Patigler, Vienna, tel 43 6646010814574, email mario.patigler@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=581151-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=542743-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=504737-2023.  Ref. 2023/PROVIA n.103138. 40/23. 




Permalink


The contract about the open invitation to tender, deadline 10/10/2023, for the partial renovation of the 2 x 5,050 m Roppener tunnel on the A12 motorway was not awarded. Contact Asfinag, attn Mario Patigler, Vienna, tel 43 6646010814574, email mario.patigler@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=708416-2023.  Ref. 2023/PROVIA n.103138. 47/23.  



Permalink


Prior information notice for the partial renovation of the 2 x 5,050 m Roppener tunnel on the A12 motorway. The contract also includes upgrading of operational & safety technology. Click here for tender documents. Estimated date of publication of contract notice 08/04/2024. Contact Asfinag, attn Mario Patigler, Vienna, tel 43 6646010814574, email mario.patigler@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040706-2024.  Ref. n. 111571. 04/24. .  




Permalink

Open invitation to tender, deadline 21/03/2024, for local construction supervision during the partial refurbishment of construction and operational & safety equipment of the 5.1k Roppen tunnel, Romedi tunnel and bridge on the Pigerbach river on highway A 12. Click here http://provia.at/ for bid documents and where tenders must be sent. Duration of contract from 03/06/2024 to 31/12/2027. Contact ASFINAG Bau Management GmbH, attn Tobias Cologna, Vienna, tel +43 6646010814658, email tobias.cologna@asfinag.at. Visit https://ted.europa.eu/en/notice/-/detail/100573-2024. Ref.n. PROVIA n. 112909. 07/24.



Permalink


Bernard Gruppte ZT GmbH from Hall in Tirol have secured the EUR 233,333 contract, excluding VAT, for local construction supervision during the partial refurbishment of construction and operational & safety equipment of the 5.1k Roppen tunnel, Romedi tunnel and bridge on the Pigerbach river on highway A 12. Contact ASFINAG Bau Management GmbH, attn Tobias Cologna, Vienna, tel +43 6646010814658, email tobias.cologna@asfinag.at. Visit https://ted.europa.eu/en/notice/-/detail/355576-2024. Ref.n. PROVIA n. 112909. 25/24.



Permalink


Open invitation to tender, deadline 04/11/2024, for a safety tunnel and bypasses, for the 6.5km Landecker tunnel on A12. Duration of contract from  08/01/2025 to 30/12/2032. Contact ASFINAG, attn Dagmar Eder, Vienna, tel +43 664 6010810847, email dagmar.eder@asfinag.atVisit https://ted.europa.eu/en/notice/-/detail/555744-2024. Ref. PROVIA n. 124244. 38/24.



Permalink

Austria, Linz - at/31

Highway

Neumarkt tunnel with length 1.3 km and cross-section 70 sq m to be bid in 2001. Construction by NATM techniques using drill/blast, rockbolts and shotcrete. In design by Laabmayr & Partner for completion 2003 at value $17.5 million. Enquire at laabmayr-sbg@aon.at October 2000.Open invitation to tender for construction of 3 km-long Neumarkt tunnel, deadline 22nd June, 2001. Contact BSV, Linz, fax +43 722 987 80522. Enquire at laabmayr-sbg@aon.at 22/01.Restricted call for bids, deadline 14th September, 2005 for project management during the design phase (2006-2009) of the west orbital motorway A26 in Linz. The 8,350 m project includes tunnels on each bank of the Danube and a bridge across the river. The south tunnel is 3.2 km and the north tunnel is 2.8 km in length. Read E-News Weekly 30/2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=154275-2005, OJ S 154, or contact ASFINAG, Vienna, fax +43 5010814320. E-mail baumanagement@asfinag.at 36/05.Restricted call for bids, deadline 25th October, 2005 for environmental coordination during the design phase (2006-2009) of the west orbital motorway A26 in Linz. The 8,350 m connection includes two tunnels (3.2 km and 2.8 km) on each bank of the Danube. Read E-News Weekly 30/2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=179264-2005, OJ S 181, or contact ASFINAG, Vienna, fax +43 5010814320. E-mail baumanagement@asfinag.at 39/05.Restricted call for tenders, deadline 27th January, 2006 for design of the south and north sections of the west orbital highway A 26 in Linz (approx. 8,350 m), a dual carriageway including tunnel designs (south tunnel of approx. 3,200 m and north tunnel of approx. 2,800 m). Read E-News Weekly 30/2004. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=242934-2005, OJ S 246, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 02/06.A JV formed by ILF, Retter + Partner and Kirsch Muchitsch & Partner received a EUR2.4 million contract to design the south and north sections of the west orbital highway A 26 in Linz (approx. 8,350 m), a dual carriageway including tunnel designs (south tunnel of approx. 3,200 m and north tunnel of approx. 2,800 m). Visit www.ilf.com, www.ib-retter.at and www.kmp.co.at 48/06.Restricted call for bids, deadline 19th February, 2007 for geology and soil mechanics for the west ring road A26 in Linz. The project begins at Bindermichl, then follows the west railway, runs in tunnel until the fourth Danube bridge, and continues, still in tunnel, on the opposite bank ending by a connection with the A7. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=11420-2007, OJ S 10, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 04/07.Open call for tenders, deadline 21st June, 2007 for planning of the E&M and safety equipment for the south section of Linz's west ring road A 26. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=112101-2007, OJ S 91, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at. Click at/31. 20/07.BGG Consult and ESW Consulting scooped a EUR241,400 contract for geology and soil mechanics for the west ring road A26 in Linz. The project begins at Bindermichl, then follows the west railway, runs in tunnel until the fourth Danube bridge, and continues, still in tunnel, on the opposite bank ending by a connection with the A7. Visit www.bgg.at and www.wruss.at 52/07-01/08.



Permalink

Prior information notice of invitation to tender for the construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail klaus.mittermayr@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028952-2015. Ref.n. L-564572-5121. 05/15.



Permalink

Prior information notice of invitation to tender for geotechnical and tunnelling services for the construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail klaus.mittermayr@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028933-2015. Ref.n. L-564573-5121. 05/15.



Permalink

Prior information notice of invitation to tender for general management during construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail klaus.mittermayr@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028932-2015. Ref.n. L-564570-5121. 05/15.



Permalink

Prior information notice of invitation to test E&M equipment on A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Eng. Robert Pany, Vienna, tel +43 5010814544, fax +43 5010814362, e-mail robert.pany@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028930-2015. Ref.n. L-564574-5121. 05/15.



Permalink

Prior information notice of invitation for general management about E&M, ventilation and other equipment on A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, attn Eng. Robert Pany, Vienna, tel +43 5010814544, fax +43 5010814362, e-mail robert.pany@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028919-2015. Ref.n. L-564571-5121. 05/15.



Permalink


Ingenieurbüro. ste.p ZT GmbH from Vienna secured the geotechnical and tunnelling services for the construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km long tunnel. Contact ASFINAG Bau Management GmbH, attn Mrs Renate Schmiedmaier, Vienna, tel +43 5010814453, fax +43 5010814120, e-mail renate.schmiedmaier@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=357903-2015. Ref.n. L-564573-5121. 42/15.





Permalink


Postponed from 20.10.2015 to 27.10.2015, the deadline of the open invitation to tender for general management during construction of the A26 ring road of Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with 4 km in tunnel. Contact ASFINAG Bau Management GmbH, att.n Franz Sempelman, Vienna, tel +43 5010814458, fax +43 5010814452, e-mail franz.sempelmann@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=296907-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=361317-2015. Ref.n. L-564570-5121. 42/15.




Permalink


Dr. Hugo Kofler Ziviltechnikerkanzlei from Pernegg an der Murfor secured the contract for the construction of the A26 ring road in Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. The new highway will be 4.7 km-long with a 4 km long tunnel. Contact ASFINAG Bau Management GmbH, attn Nicole Dobretsberger, Vienna, tel +43 5010814450, fax +43 5010814120, e-mail nicole.dobretsberger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=124584-2016. Ref.n. L-564572-5121. 15/16. 




Permalink

Prior information notice of invitation for the construction of  ramps in the tunnel connecting with the Stahlhange bridge (Donau) on the A26 ring road in Linz (Phase 1), linking the A7 Linz Hummelhof interchange with the B127 Rohrbacherstrasse. Contact ASFINAG Bau Management GmbH, attn Eng. Franz Sempelmann, Vienna, tel +43 5010814450, fax +43 5010814120, e-mail nicole.dobretsberger@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378289-2017. Ref.n. L-632109-7920. 39/17.



Permalink

Prior information notice of invitation for planning services for tunnel ventilation on the A26 Linz Motorway, Section 2, from Waldeggstrasse to Donau-Sud including the 3.2km Freinberg tunnel. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14545, fax +43 50108-14362, e-mail ingrid.ellmer@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195468-2018 .Ref.n L-648248-854. 19/18.



Permalink

Open invitation to tender, deadline 13.02.2019, for planning services for construction of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud. Contact Asfinag Bau Management GmbH, attn. Eng. Klaus Mittermayr, Vienna, tel +43 5010814453,

fax +43 5010814452, email klaus.mittermayr@asfinag.at. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=56419-2019,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=526394-2018,

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=446281-2018

and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=353607-2018.

Ref. 2018/PROVIA n.15729. 06/19.




Permalink

The JV IGT Geotechnik und Tunnelbau ZT GmbH/IL – Ingenieurbüro Laabmayr & Partner GesmbH from Salzburg secured the EUR1.28 million contract, excluding VAT, for planning services for construction of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14453,  fax +43 50108-14452, email bmg.baubueroA26@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=235614-2019.

Ref. 2018/PROVIA n.15729. 21/19.



Permalink

Open invitation to tender, deadline 17/09/2019, for construction static analysis of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud. For bid documents www.provia.at.

Duration of the contract is from 01/11/2019 to 30/12/2023. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14454,  fax +43 50108-14120, email bmg.baubueroA26@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=388025-2019.

Ref. 2019/PROVIA n. 32576. 34/19.



Permalink

ILF Consulting Engineers Austria GmbH/ILF Consulting Engineers Austria GmbH from Rum bei Innsbruck secured the EUR244,047.50 contract for the construction static analysis of the 3.2km Freinberg tunnel on the A26 Linz Highway, Section 2, from Waldeggstrasse to Donau-Sud.

Contact Asfinag Bau Management GmbH, attn Klaus Mittermayr, Vienna, tel +43 50108-14453,  fax +43 50108-14120, email klaus.mittermayr@asfinag.at. For tender information please click here. Ref. 2019/PROVIA n. 32576. 05/20.



Permalink

Austria, Grabern - at/30

Highway

Management of design and construction of western tube awarded by OSAG to engineering consortium of IC Consulenten, Bautechnik Linz, and Chiari & Partner. Sept 2000. Construction of the 2,148 m-long 78 sq m western tube of the Gräbern tunnel on the A2 motorway is underway by a jv between í–stu Stettin, Hinteregger and PAT for €25 million. Completion in April 2003. Visit www.oesag.at and www.oestu-stettin.at 14/02.Parallel 2.15 km-long tube being driven from both ends in variable rock conditions by Oestu Stettin, Hinteregger, Porr Tunnelbau joint venture using spiles, self drilling anchors, Super Swellex, lattice arches and shotcrete. Mechanical excavation at south, drill/blast using Atlas Copco Rocket Boomer L3 C at north. Visit www.oestu-stettin.at 32/02.



Permalink


Open invitation to tender, deadline 10.03.2017, for the refurbishment of the Grabern tunnels (2148 m and 2144 m) on the A2 motorway. The contract includes construction and E&M works. The duration of the contract is 29 months. Contact Asfinag Bau Management GmbH, Vienna, tel +43 50108-14360, fax +43 50108-14362, email ulia.korber@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=055353-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=218071-2016. 07/17.




Permalink

Austria, Lainberg - at/29

Motorway

Open invitation to tender for construction of twin-tube 1.453 km-long tunnels on Kienberg motorway, deadline 23rd August, 2000. Contact OAS in Vienna, fax +43 1534 0333. Check European Gazette or visit http://ted.eur-op.eu.int section 45 221 240. July 2000. Award of construction contract for 1.453 km-long twin-tube Kienberg A9 motorway tunnels to jv of Strabag and Alpine. Visit www.strabag.at 06/01.Preinformation notice for construction of the second tube of the Lainberg tunnel (2.3 km) on the Pyhrn motorway A 9. Work start in February 2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221741-2003, OJ S 249, or contact í–SAG, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at 02/04.Restricted procedure, deadline 30th March, 2004 for work supervision during construction of the second tube and renovation of the first tube of the Lainberg tunnel (2.3 km) on the Pyhrn motorway A 9. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=037708-2004, OJ S 43, or contact OESAG, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at 12/04.Negotiated procedure, deadline 4th November, 2004 for assistance to control in the planning and construction phases for the second bore of the Lainberg tunnel (2.3 km) as well as roadworks on the Pyhrn highway A9. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=164898-2004, OJ S 193, or contact Asfinag, Vienna, fax +43 15313410420. E-mail manfred.philipp@asfinag.at 42/04.Open call for bids, deadline 4th October, 2005 for construction of the second tube of the Lainberg tunnel (2.1 km) and the second tube of the Kurz cut-and-cover tunnel (170 m), as well as rehabilitation of the existing tube of the Lainberg tunnel on the Pyhrn motorway A9. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=159765-2005, OJ S 160, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 36/05.Open call for tenders, deadline 25th November, 2005 for geotechnical measurements during construction of the second tube (2.1 km) of the Lainberg tunnel on the A9 Pyhrn motorway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=191623-2005, OJ S 194, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 42/05.Open call for tenders, deadline for 16th January, 2007 for E&M equipment for the 2.1 km second tube of the Lainberg tunnel on the A9 Pyhrn motorway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=232786-2006, OJ S 217, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 47/06.



Permalink

Austria, Unterwald - at/28

Railway

European Gazette pre-announcement of intention by Austrian Railways to construct section of railway with 1 km-long tunnel. Contact OBB planning and engineering department, Vienna, fax +43 19 3000 25984. Visit http://ted.eur-op.eu.int June 2000.Restricted invitation to tender for 4 km railway line section including 1 km tunnel for Austrian Railways, Vienna, fax +43 19 3000 25984. See Official Journal of the European Community 11/07/2000 or visit http://ted.eur-op.eu.int for further details. July 2000.



Permalink