Geological investigation commencing to establish alignment of $90 million, 5.7 km-long, single tube Erzberg tunnel on B198 between existing Ralegg and Monzabon tunnels. Invitation to tender for design contract expected 2002 for construction start in 2004. Contact AVL, Bregenz fax +43 557 451 127233. Visit www.bregenz.at 17/01.11.4 km-long, $120 million section of S35 motorway between Lueckenschluss Stausee and Roethelstein will include three tunnels: 1.1 km-long second tube of Kaltenbach; 2.8 km-long Kirchdorf; and 725 m-long single-tube Maustatt. Construction start in 2003 for opening 2006. Contact via www.stmk.gv.at 21/01.