Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Innsbruck - at/32

Highway

Notice of award dated 12th October, 2000 of two tunnels on S16 Arlberg motorway Pians-Flirsch to jv of Beton u Monierbau/Universale/Alpine value $110 million of which up to 30% will be subcontracted. Sponsor is Otmar Alber, fax +43 512 520 12-134. Details at http://ted.eur-op.eu.int or visit www.bemo.co.at November 2000. Restricted invitation to tender, deadline 20th June, 2001, for design of 5.1 km-long twin-tube Roppener tunnel for Alpen Strassen, fax +43 512 520 12134. 26/01. Engineering planning contract awarded by Alpen StraíŸen to a jv of Bernard+Partner, Verbundplan, and Electrowatt Infra for the twin-tube Roppener tunnel, 5.1 km in length, on the A 12 highway for €533,000. Visit www.asg.co.at or www.ewi.ch 01/02.Restricted procedure, deadline 28th November, 2002 for engineering services for the Haiming-Tschirgant tunnel-Nassereith section of the A12 Inntal motorway. The tunnel will be 5 to 6 km in length. Planned date for work start in 2007. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=163983-2002, OJ S 207, or contact Alpen StraíŸen, Innsbruck, fax +43 51252012134. E-mail zentrale@asg.co.at 46/02.Preinformation notice for construction supervision of the second bore of the 5.1 km Roppener tunnel and refurbishment of the first tube, on the A12 Inn Valley highway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018666-2005, OJ S 19, or contact Asfinag, Vienna, fax +43 5010814482. E-mail otmar.alber@asfinag.at 05/05.Preinformation notice for geological consultancy of the second bore of the 5.1 km Roppener tunnel and refurbishment of the first tube, on the A12 Inn Valley highway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=018665-2005, OJ S 19, or contact Asfinag, Vienna, fax +43 5010814482. E-mail otmar.alber@asfinag.at 05/05.Restricted procedure, deadline 16th June, 2005 for assistance to project management for the planning, tendering and construction phase of the second tube of the 5.1 km Roppener tunnel on the A12 highway in the Inn Valley. Estimated cost of the project: EUR115 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=091217-2005, OJ S 92, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 21/05.Restricted procedure, deadline 30th June, 2005 for construction supervision and management for the second tube of the 5.1 km Roppener tunnel on the A12 highway in the Inn Valley. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=109775-2005, OJ S 110, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at or gabriele.moerwald@asfinag.at 24/05.Restricted procedure, deadline 20th February, 2006 for geotechnical measurements, control measurements and scanning of documents during construction of the second tube (5,100 m) of the Roppener tunnel on the Inn Valley highway A 12, including the cross passages and rehabilitation of the existing tube. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=07872-2006, OJ S 7, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at and gabriele.moerwald@asfinag.at 04/06.Restricted procedure, deadline 20th February, 2006 for geological measurements during construction of the second tube (5,100 m) of the Roppener tunnel on the Inn Valley highway A 12, including the cross passages and rehabilitation of the existing tube. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=07861-2006, OJ S 7, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010818020. E-mail baumanagement@asfinag.at and gabriele.moerwald@asfinag.at 04/06.Open call for bids, deadline 20th April, 2006 for construction of the second tube (5,097 m) of the Roppener tunnel on the Inn valley highway A 12, cross passages and refurbishment of the existing bore (5,100 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=047146-2006, OJ S 45, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 11/06.The deadline for bid submission for construction of the second tube (5,097 m) of the Roppener tunnel on the Inn valley highway A 12, cross passages and refurbishment of the existing bore (5,100 m) has been extended to 4th May, 2006. Click at/32. 15/06.Restricted call for tenders, deadline 19th June, 2006 for control and inspection during the remaining design phase and construction phase of the 4,310 m Tschirgant tunnel on the Inn valley highway A 12. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100812-2006, OJ S 94, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 23/06.Restricted call for tenders, deadline 2nd October, 2006 for construction management during excavation of the second Roppener tunnel (5.1 km) on the A 12 highway in the Inn valley, including also the cross passages to the existing tube and its rehabilitation. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188813-2006, OJ S 177, or contact ASFINAG, Vienna, fax +43 5010814020 or 5010814482. E-mail baumanagement@asfinag.at 39/06.Open call for tenders, deadline 22nd October, 2007 for supply and installation of ventilation equipment (semi-transversal ventilation) for the second, 5.1 km Roppener tunnel and upgrading in the existing tunnel on highway A 12 in Inn valley. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=205530-2007, OJ S 166, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 37/07.Open call for tenders, deadline 22nd October, 2007 for supply and installation of medium voltage supplies for the second, 5.1 km Roppener tunnel and upgrading in the existing tunnel on highway A 12 in Inn valley. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216592-2007, OJ S 177, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 39/07.Open call for tenders, deadline 20th December, 2007 for supply and installation of electromechanical equipment (low voltage, lighting, traffic management, traffic data acquisition, emergency call, telephones, cables, ventilation, etc.) in the new Innsbruck-bound Roppen tunnel and upgrading in the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251260-2007, OJ S 207, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 44/07.Open call for tenders, deadline 20th December, 2007 for supply and installation of instrumentation (video, emergency call, etc.) in the new Innsbruck-bound Roppen tunnel and upgrading in the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251254-2007, OJ S 207, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 44/07.Open invitation to tender, deadline 21st May, 2008 for radio equipment for the 2 x 5,050 m Roppener tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=82386-2008, OJ S 61, or contact Asfinag, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 15/08.Howden Ventilatoren will supply and install ventilation equipment (semi-transversal ventilation) in the second, 5.1 km Roppen tunnel and upgrade the existing tunnel on highway A 12 in Inn valley. Visit www.howden.com/en/Businesses/HowdenVentilatoren 36/08.Siemens Elin Buildings and Infrastructure has been contracted to supply and install medium voltage supplies in the second, 5.1 km Roppen tunnel and upgrade the existing tunnel on highway A 12 in Inn valley. This contract is worth EUR833,000. In addition, the company has been commissioned to supply and install electromechanical equipment (low voltage, lighting, traffic management, traffic data acquisition, emergency call, telephones, cables, ventilation, etc.) in the new Innsbruck-bound Roppen tunnel and upgrade the Bregenz-bound tube. The overall length is approx. 5,050 metres per tube. The contract totals EUR14.9 million. Visit www.siemenselin.at or www.siemens.com 36/08.Dürr pocketed a EUR6.4 million contract to supply and install instrumentation (video, emergency call, etc.) in the new Innsbruck-bound Roppen tunnel and upgrade the Bregenz-bound tube on the Inn valley highway A12. The overall length is approx. 5,050 metres per tube. Visit www.duerr-gruppe.at 36/08.



Permalink