Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Akershus - no/43

Railway

Closing Date: 20.02.2012 (Tender Closed)

Invitation to tender using negotiated procedure, deadline 20.02.2012, for installation of fire water and smoke ventilation measures in Oslo tunnel on Etterstad-Lysaker line. Contract duration 12.04.2012 to 23.12.2013. 4 km of fire water lines required with outlets at 100 m intervals. 2.1 MW installed power required, with 49 smoke ventilation fans. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=247975. Further information, specs and docs from Utbyggingsdivisjonen at Jernbaneverket in Oslo, tel +47 05280, fax +47 22455499, website www.jernbaneverket.no to where tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=024200-2012. 04/12.



Permalink

Peru

Peru, Moquegua - pe/27

Hydro

Electric Power Company of the South (Egesur) has awarded the EUR102 million contract to build the Moquegua 1 and 3 hydroelectric power plants in Peru, which have a total installed capacity of 34 MW, to the consortium composed of Sacyr (Spain) and GCZ Ingenieros (Perù).

Duration of the contract is 30 months. The Moquegua 1 project a hydroelectric power plant (CHM1) will be 15.3 MW of power. This project will include connection work with the current Huaracane channel, a conduit of 8,360 m, with three tunnels totalling 1,800 m in length, the engine house, the electric substation and the transport line.

The Moquegua 3 project (CHM3), is to supply 18.7 MW of power, and includes a water intake on the Sajena creek, a conduit of 7,211 m, with a tunnel of nearly 2,660 m, a machine room and unloading works to the Sajena ravine. In addition, an electrical substation and a transport line will be also built.

Visit http://www.sacyr.com and http://www.egesur.com.pe. 30/19.

 

http://www.sacyr.com=>http://www.sacyr.com/es_en/Channel/News-Channel/news/featuresnews/2019/Adjudicacion/20190719_Hidroelectricas_Peru.aspx

 

http://www.egesur.com.pe=>http://www.egesur.com.pe/SitePages/Proyectos%20de%20Inversi%C3%B3n.aspx



Permalink

Romania

Romania, Transylvania - ro/22

Metro


Prior information notice for the design and execution of Infrastructure works, Traffic automation, Power supply connection related to the project of the Giluu - Floresti - Cluj-Napoca - Baciu - Apahida - Jucu - Bonțida metro/train - stage I of the Cluj fast metropolitan transport system. Estimated date of publication of the contract notice will be 11/03/2022. The value of the contract is EUR 1.48 bn (RON7.33 bn), excluding VAT. Contact Municipiul Cluj-Napoca from Cluj-Napoca, tel +40 264596030, fax +40 264431575, email achizitiipublice@primariaclujnapoca.ro and/or Comuna Floresti, attn Marius Manu, Floresti, tel +40 0264265101, email primaria@floresticluj.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=086324-2022. Ref. n. 4305857-2022-19. 07/22. 

Romania-Cluj-Napoca: Underground railway works

2022/S 035-086324

Prior information notice

This notice is for prior information only

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Municipiul Cluj-Napoca
National registration number: 4305857
Postal address: Strada Moţilor, Nr. 1-3
Town: Cluj-Napoca
NUTS code: RO113 Cluj
Postal code: 400001
Country: Romania
Contact person: VIRGIL PORUTIU, RAMONA GABOR , LUCIA LUPEA, MARIA OPRIS
E-mail: achizitiipublice@primariaclujnapoca.ro
Telephone: +40 264596030
Fax: +40 264431575
Internet address(es):
Main address: www.primariaclujnapoca.ro
Address of the buyer profile: www.primariaclujnapoca.ro
I.1)Name and addresses
Official name: COMUNA FLORESTI
National registration number: 4485391
Postal address: Strada: AVRAM IANCU , nr. 170, Sector: -, Judet: Cluj, Localitate: Floresti, Cod postal: 407208
Town: Floresti
NUTS code: RO113 Cluj
Postal code: 407208
Country: Romania
Contact person: MARIUS MANU
E-mail: primaria@floresticluj.ro
Telephone: +40 0264265101
Internet address(es):
Main address: www.floresticluj.ro
I.2)Information about joint procurement
The contract involves joint procurement
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at:
Additional information can be obtained from the abovementioned address
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică) aferente obiectivului de investiție Magistrala I de metrou Cluj

Reference number: 4305857-2022-19
II.1.2)Main CPV code
45234122 Underground railway works
II.1.3)Type of contract
Works
II.1.4)Short description:

Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică aferente obiectivului de investiție


„Tren metropolitan Gilău – Florești – Cluj-Napoca – Baciu – Apahida – Jucu – Bonțida – etapa I a sistemului de transport metropolitan rapid Cluj: Magistrala I de metrou și tren metropolitan, inclusiv legătura dintre acestea. Componenta 1. Magistrala I de metrou Cluj”

II.1.5)Estimated total value
Value excluding VAT: 7 331 922 737.00 RON
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: RO113 Cluj
Main site or place of performance:

MUNICIPIUL CLUJ-NAPOCA si COMUNA FLORESTI, JUD CLUJ

II.2.4)Description of the procurement:

Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică aferente obiectivului de investiție


„Tren metropolitan Gilău – Florești – Cluj-Napoca – Baciu – Apahida – Jucu – Bonțida – etapa I a sistemului de transport metropolitan rapid Cluj: Magistrala I de metrou și tren metropolitan, inclusiv legătura dintre acestea. Componenta 1. Magistrala I de metrou Cluj”

II.2.14)Additional information
II.3)Estimated date of publication of contract notice:
11/03/2022

Section IV: Procedure

IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes

Section VI: Complementary information

VI.3)Additional information:

Documentatia de atribuire care face obiectul acestei proceduri va fi pusa la dispozitie celor interesati prin intermediul anuntului de participare.

VI.5)Date of dispatch of this notice:
15/02/2022



Permalink


Open invitation to tender, deadline 24/06/2022, for the design and execution of infrastructure works, traffic automation and power supply connection. The project is the Giluu - Floresti - Cluj-Napoca - Baciu - Apahida - Jucu - Bonțida metro/train - stage I of the Cluj fast metropolitan transport system. For tender documents, please click here. The value of the contract is EUR1.35 bn (RON6.67 bn), excluding VAT. Duration of the contract will be 96 months. Contact Municipiul Cluj-Napoca from Cluj-Napoca, tel +40 264596030, fax +40 264431575, email achizitiipublice@primariaclujnapoca.ro. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=211218-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=139764-2022. Ref. n. 4305857-2022-19. 17/22.

 

Romania-Cluj-Napoca: Underground railway works


2022/S 079-211218

Corrigendum

Notice for changes or additional information

Works

(Supplement to the Official Journal of the European Union, 2022/S 055-139764)

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: Municipiul Cluj-Napoca
National registration number: 4305857
Postal address: Strada: Moţilor, nr. 1-3
Town: Cluj-Napoca
NUTS code: RO113 Cluj
Postal code: 400001
Country: Romania
Contact person: VIRGIL PORUTIU, RAMONA GABOR, LUCIA LUPEA, MARIA OPRIS
E-mail: achizitiipublice@primariaclujnapoca.ro
Telephone: +40 264596030
Fax: +40 264431575
Internet address(es):
Main address: www.primariaclujnapoca.ro
Address of the buyer profile: www.e-licitatie.ro

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Proiectare și Execuție lucrări de Infrastructură (structură de rezistență, cale de rulare, finisaje, sisteme de instalații), Automatizare trafic, Racordare alimentare cu energie electrică aferente obiectivului de investiție Magistrala I de metrou Cluj


Reference number: 4305857-2022-19
II.1.2)Main CPV code
45234122 Underground railway works
II.1.3)Type of contract
Works

Section VI: Complementary information

VI.6)Original notice reference
Notice number in the OJ S: 2022/S 055-139764

Section VII: Changes

VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 09/05/2022
Read:
Date: 24/06/2022
Section number: IV.2.7
Instead of:
Date: 09/05/2022
Read:
Date: 24/06/2022
Section number: IV.2.6
Instead of:
Date: 09/03/2023
Read:
Date: 24/04/2023
VII.2)Other additional information:



Permalink

Rwanda

Rwanda, Western Province - rw/11

Hydro

Closing Date: 12.01.2022 (Tender Closed)


Restricted invitation to tender, deadline 12/01/2022, for the Ruzizi III EPC (engineering, procurement, construction) Turnkey Contract -Initial Selection. The Ruzizi III Regional Hydroelectric Power Plant, will be located on the Ruzizi River, at the border between (DRC- Democratic Republic of the Congo) and Rwanda. It will be part of the Ruzizi Cascade, already equipped by Ruzizi I and Ruzizi II projects, and will be located approximately 13 km downstream of the Ruzizi II dam. The contract includes the construction of a 3.8 km long, 6.7 m diameter, concrete-lined headrace tunnel from the dam reservoir to the powerhouse. Value contract EUR436 million, excluding VAT. Duration contract 56 months. Tenders must be sent to Ruzizi III Energy Ltd, attn Luciano Canale, Kigali, tel +25 0786674578, email luciano.canale@ruzizienergy.com. Contact Ruzizi III Energy Ltd, attn Lonceny Magassouba, Kigali, tel +224 622676247, email RuziziIII_EPC_InitialSelection@ruzizienergy.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=575634-2021. 46/21.

Rwanda-Kigali: Hydro-electric plant construction work

2021/S 220-575634

Contract notice

Works

Legal Basis:

EIB Guide to Procurement - Financed by the EIB

Section I: Contracting authority

I.1)Name and addresses

Official name: Ruzizi III Energy Limited
Postal address: Sanlam Towers, Wing 4A, 4th Floor, KN 67 St 10
Town: Kigali
NUTS code: RW Rwanda
Postal code: 3300
Country: Rwanda
Contact person: Luciano Canale (Project Director)
E-mail: luciano.canale@ruzizienergy.com
Telephone: +25 0781553634
Internet address(es):
Main address: www.ruzizi-iii.com

I.3)Communication

Access to the procurement documents is restricted. Further information can be obtained at:

Additional information can be obtained from another address:

Official name: Ruzizi III Energy Limited
Postal address: Cité chemin de fer, Commune de Kaloum, BP : 1463
Town: Kigali
NUTS code: RW Rwanda
Postal code: Rue KA 050
Country: Rwanda
Contact person: Loncény MAGASSOUBA
E-mail: RuziziIII_EPC_InitialSelection@ruzizienergy.com
Telephone: +224 622676247
Internet address(es):
Main address: www.ruzizi-iii.com

Tenders or requests to participate must be submitted to the following address:

Official name: Ruzizi III Energy Limited
Postal address: Sanlam Towers, Wing 4A, 4th Floor, KN 67 St 10
Town: Kigali
Postal code: Rue KA 050
Country: Rwanda
Contact person: Luciano Canale
Telephone: +25 0786674578
E-mail: luciano.canale@ruzizienergy.com
NUTS code: RW Rwanda
Internet address(es):
Main address: www.ruzizi-iii.com

I.4)Type of the contracting authority

Other type: Private company (SPV)

I.5)Main activity

Other activity: Electricity

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

Ruzizi III EPC Turnkey Contract – Initial Selection

II.1.2)Main CPV code

45251120 Hydro-electric plant construction work

II.1.3)Type of contract

Works

II.1.4)Short description:

The Ruzizi III Regional Hydroelectric Power Plant will be located on the Ruzizi River, at the border between DRC and Rwanda. It will be part of the Ruzizi Cascade, already equipped by Ruzizi I and Ruzizi II projects, and will be located approximately 13 km downstream of the Ruzizi II dam.

II.1.5)Estimated total value

Value excluding VAT: 436 000 000.00 EUR

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.3)Place of performance

NUTS code: RW Rwanda

Main site or place of performance:

The Ruzizi III Regional Hydroelectric Power Plant will be located on the Ruzizi River, at the border between DRC and Rwanda. It will be part of the Ruzizi Cascade, already equipped by Ruzizi I and Ruz

II.2.4)Description of the procurement:

This is the Initial Selection process for the Ruzizi III Regional Hydroelectric Power Plant EPC contract. The contract will include the engineering, procurement, construction, testing and commissioning of a 45 m height embankment dam with associated spillway, low level outlet, and eco-flow small-hydro, a 3.8 km long, 6.7 m diameter, concrete-lined headrace tunnel from the dam reservoir to the powerhouse, penstock and unit penstocks, power station and switchyard, a 7.3 km long 220 kV double-circuit transmission line connecting the Ruzizi III substation to the regional dispatch station in Kamanyola (DRC), access roads from Bugarama (Rwanda) and Kamanyola (DRC) to the dam site, and all ancillary and related works. The power station will have three generating units and an eco-flow small-hydro, giving an installed capacity of 206 MW.

II.2.5)Award criteria

Price is not the only award criterion and all criteria are stated only in the procurement documents

II.2.6)Estimated value

Value excluding VAT: 436 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 56

This contract is subject to renewal: no

II.2.10)Information about variants

Variants will be accepted: no

II.2.11)Information about options

Options: no

II.2.13)Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: no

II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation

III.1.2)Economic and financial standing

Selection criteria as stated in the procurement documents

III.1.3)Technical and professional ability

Selection criteria as stated in the procurement documents

Section IV: Procedure

IV.1)Description

IV.1.1)Type of procedure

Restricted procedure

IV.1.3)Information about a framework agreement or a dynamic purchasing system

IV.1.8)Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: no

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 12/01/2022

Local time: 14:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

English, French

Section VI: Complementary information

VI.1)Information about recurrence

This is a recurrent procurement: no

VI.3)Additional information:

The Borrower (“the Contracting States (Burundi, Democratic Republic of Congo (DRC), Rwanda) and Ruzizi III Energy Limited (REL)”); REL a special purpose company who is going to be owned by Industrial Promotion Services and SN Power (owned by Scatec ASA) and the Contracting States.

The Borrower has currently secured from the African Development Bank, approval for part of the funding for the 206 MW (203 MW for the main powerhouse and 3 MW for the small-hydro on the ecological flow). In addition, the Borrower is currently negotiating the remaining financing from a number of other multilateral development banks, including the World Bank (WB), European Investment Bank (EIB), Kreditanstalt für Wiederaufbau (KfW), the French Development Agency (AFD), and the European Union (EU). This funding will be used towards the cost of developing the project, and the Borrower intends to apply part of the proceeds to payments for goods, works, and services to be procured under this project.

In this regard, Ruzizi III Energy Limited intends to initial select contractors and consortia to tender for the RIII-EPC contract. Initial Selection documents will be made available, in electronic format for free, in a dedicated electronic system. Interested applicants may request access to the electronic system by sending an email to the following address: RuziziIII_EPC_InitialSelection@ruzizienergy.com.

All queries related to the Initial Selection process should be sent via email to the following email address: RuziziIII_EPC_InitialSelection@ruzizienergy.com.

The RIII-EPC contract is planned to be tendered in Q4 2022 with work commencing in Q1 2023.

VI.4)Procedures for review

VI.4.1)Review body

Official name: Ruzizi III Energy Limited
Town: Kigali
Country: Rwanda

VI.5)Date of dispatch of this notice:

09/11/2021




Permalink

Saudi Arabia

Saudi Arabia, Mecca - sa/14

Metro

Closing Date: 26.05.2014 (Tender Closed)

The Employer, the Development Commission of Makkah and Mashaaer (DCOMM) is inviting  contractors to prequalify, deadline 26.05.2014, for Mecca (or Makkah) Public Transport Program (MPTP or “Program”) Metro Phase 1 Systems Works comprising of the following systems:

1) Track work (including 3rd Rail) for the Mainline and the Depot;

2) Rail Systems, including Rail Systems for Depot , to include Medium and Low Voltage Power Supply, Traction Power Supply, Signalling,  Telecommunication, AFC (Automatic Fare Collection), PSD (Platform Screen Doors) & SDO (Segregation Doors), ICS (Integrated Control System) & OCC (Operation and Control Center);

3) Architectural Works and Fit-Out for Stations, OCC, Headquarters, Depot and Various Ancillary Buildings

4) MEP (Mechanical, Electrical & Plumbing) for Stations, OCC, Headquarters, Depot and Various Ancillary Buildings and Tunnels

4) Overall System Integration

MPTP Metro Phase 1 consists of Section 1 and Section 2. Section 1, mostly underground, is about metro Line B and the northwestern part of metro Line C. Section 1 comprises 24.8 km of guideway and 12 stations. Section 2, above ground, is in southeastern part of metro Line C. Section 2 comprises 20.3 km of guideway and 10 stations, together with the Depot (civil shell and core).

The MPTP Metro Phase 1 Metro Works will be procured on a design-build basis under four separate contracts. For application submission purposes contact Development Commission of Makkah and Mashaaer, MMRTC Office, Makkah Al Mukarramah, att.n Managing Director of Makkah Public Transport Program and CEO of Makkah Mass Rail Transit Company, tel + 966 12 567 3987, e-mail Metro@makkahtransit.org. Visit woth http://makkahtransit.com/Attachments/FINAL%20PQD%20for%20System%20Works%20-%2023%20March%202014%20Rev%2000.pdf. 13/14.

 



Permalink

Singapore

Singapore, Singapore - sg/27

Thomson Line

Closing Date: 12.06.2013 (Tender Closed)

Pre-qualification notice, deadline 12.06.2013, for the power supply system (Contract T253) for the 30 km Thomson Line (TSL). Contact LTA, att.n Ms Low Bee Eng/Ms Lim Pi Feei, tel 65-6396 1202/1623, fax  65-6396 1124, e-mail lta_contracts@lta.gov.sg. Visit http://app.lta.gov.sg/data/apps/tender/doc/3662/T253_PQ%20Notice_rev.pdf and http://www.gebiz.gov.sg/scripts/main.do?doctype=PQ&doc=LTA000EPQ13000016. Bid Code LTA000EPQ13000016. 21/13.



Permalink

Singapore, Downtown - sg/23

Metro

Open invitation to tender, deadline 12th March, 2007 for design, construction and completion of tunnels between Promenade station and Marina Bay (contract 905, ITT No. LTA000ETT06000160) for the Downtown line, Phase 1. Contact Land and Transport Authority, Ms Low Bee Eng or Ms Monica Wong, tel. +65 63961205 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg, bee_eng_low@lta.gov.sg and monica_wong@lta.gov.sg. Visit www.gebiz.gov.sg Open invitation to tender, deadline 5th February, 2007 for design, construction and completion of Cross Street station and associated tunnels (contract 908, ITT No. LTA000ETT06000126) for the Downtown line, Phase 1. Contact Land and Transport Authority, Ms Low Bee Eng or Ms Monica Wong, tel. +65 63961205 / 1202, fax +65 63961124, e-mail bee_eng_low@lta.gov.sg and monica_wong@lta.gov.sg. Visit www.gebiz.gov.sgOpen invitation to tender, deadline 8th February, 2007 for design, construction and completion of Chinatown station and associated tunnels (contract 909, ITT No. LTA000ETT06000125) for the Downtown line, Phase 1. Contact Land and Transport Authority, Ms Low Bee Eng or Ms Monica Wong, tel. +65 63961205 / 1202, fax +65 63961124, e-mail bee_eng_low@lta.gov.sg and monica_wong@lta.gov.sg. Visit www.gebiz.gov.sgThe Downtown line extension is a 3.4-km long, fully underground section with five stations (Promenade, Bayfront, Landmark, Cross Street, Chinatown), which will run from the Circle line's Millenia station at Temasek Avenue along Cross Street to link up with the North East line's Chinatown station. 01-02/07.Invitation to tender, deadline 14th September, 2007 for construction and completion of Bayfront station including associated tunnels (contract 906) for Downtown Line Stage 1. Contact Land Transport Authority, Ms Monica Wong or Ms Low Bee Eng, fax +65 63961124. Visit http://www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Invitation to tender, deadline 14th September, 2007 for construction and completion of Landmark station including associated tunnels (contract 907) for Downtown Line Stage 1. Contact Land Transport Authority, Ms Monica Wong or Ms Low Bee Eng, fax +65 63961124. Visit www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Invitation to tender, deadline 7th September, 2007 for advanced engineering study (contract 9151) for proposed Downtown Line Stage 2 (Section 1). Contact Land Transport Authority, Ms Chan Mei Yin or Ms Low Bee Eng, fax +65 63961124. Visit www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Invitation to tender, deadline 7th September, 2007 for advanced engineering study (contract 9152) for proposed Downtown Line Stage 2 (Section 2). Contact Land Transport Authority, Ms Chan Mei Yin or Ms Low Bee Eng, fax +65 63961124. Visit www.lta.gov.sg/tender_info/index_tender_info.htm 36/07.Excavation and structural work on the SGD12 billion Downtown Line (DTL) will be started during the last quarter of 2007. The Land Transport Authority (LTA) awarded contracts for Phase 1 of the DTL worth nearly SGD500 million to three construction firms which have extensive experience in large-scale projects in Singapore. The first deal (contract 905) went to Japanese construction giant Shimizu, which bagged a SGD102.8 million contract to design and build tunnels between the Promenade station, Marina Bay and the integrated resort (IR) development. Visit www.shimz.com.sgThe second contract (contract 908) goes to the Samsung-Soletanche Bachy joint venture with a contract worth SGD224.9 million to design and build Cross Street station and associated tunnels. The work will involve the construction of a temporary two-lane viaduct along Cross Street from Central Boulevard to keep traffic in the area flowing smoothly as construction work goes on. Visit www.secc.co.kr/e_secc/index.asp and www.bachy-soletanche.com.sgThe third contract (contract 909) has been awarded to Gammon Construction, which will design and build DTL's Chinatown station and the tunnels connected to it. The contract is worth SGD160.3 million. Gammon Construction built the existing Chinatown station on the North-East Line (NEL). Visit www.gammonconstruction.comThe 4.3 km first stage of the DTL, due for completion in 2013, will connect Bugis station on the East-West Line (EWL) to Chinatown station on the NEL. The DTL will have six stations and will provide a vital link to new developments such as the Marina Bay Financial Centre and the Marina Bay Sands Integrated Resort. Read E-News Weekly 24/2007, 12/2007 & 1/2007. Visit www.lta.gov.sg 36/07.The Land Transport Authority (LTA) has awarded Taisei Corporation the civil works contract 907 for the Landmark station, tunnels and the main trunk road above the station, as part of Stage 1 of the Downtown Line (DTL). The contract is valued at SGD230 million. Visit www.taisei.com 10/08.Contract 906 for the Bayfront station has been awarded to Sembawang Engineers & Constructors. The contract is valued at SGD463 million. The scope of the contract covers the construction and completion of the Bayfront station including associated tunnels. The Bayfront station will serve as an interchange station for the Circle and Downtown lines with the station's twin-stacked tunnels connected to the Marina Bay and Landmark stations. Visit www.sembawangenc.com 10/08.To date, five contracts have been awarded for Stage 1. The remaining two contracts, for Bugis and Promenade stations and tunnels, will be awarded by year-end. The LTA on 12th February marked the start of construction of Stage 1 of the 40 km line with a groundbreaking ceremony for the Chinatown station. The 4.3 km fully underground Stage 1 comprises six stations (Chinatown, Cross Street, Landmark, Bayfront, Promenade and Bugis) and will be completed by 2013. The DTL will be built in three stages, with Stage 2 to be completed in 2015 and Stage 3 in 2016. Read E-News Weekly 24/2007, 12/2007 & 1/2007. 10/08.Prequalification, deadline 20th June, 2008 for the design, supply, installation, testing, commissioning and putting into service of major electrical and mechanical systems for the Downtown Line (contracts 953, 976 and 977). Contract 953 is for the power supply system. Contract 976 is for wagons and contract 977 is for locomotives. The Downtown Line will consist of 33 underground stations and some of which will serve as civil defence shelters. The line is approximately 40 km long. Contact Land Transport Authority (LTA), Tender Division, 1 Hampshire Road, Block 2, Level 1, Singapore 219428 or Ms Monica Wong and Ms Low Bee Eng, tel. +65 63961205 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 22/08.Tender notice, deadline 15th September, 2008 for construction and completion of the Bugis station including associated tunnels (contract 903) for the Downtown Line, Phase 1. The station is to be an interchange with the East West Line (EWL). Contact Land Transport Authority (LTA), Tender Division, 1 Hampshire Road, Block 2, Level 1, Singapore 219428 or Ms Monica Wong and Ms Low Bee Eng, tel. +65 63961205 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg or visit www.gebiz.gov.sg 30/08.Tender notice, deadline 14th November, 2008 for design, construction and completion of the Beauty World station and tunnels (contract 916) for the Downtown Line, Phase 2. Contact Land Transport Authority (LTA), Tender Division, 1 Hampshire Road, Block 2, Level 1, Singapore 219428 or Ms Chan Mei Yin and Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg or visit www.gebiz.gov.sg 30/08.The Land Transport Authority (LTA) has awarded a SGD231.9 million contract for the design, construction and completion of the Downtown Line 1 Promenade station and its associated tunnels to Shanghai Tunnel Engineering Co. (STEC). The Downtown Line 1 Promenade station is adjacent to the existing Circle Line Promenade station and will be constructed below the Circle Line Promenade station. Construction is scheduled to commence in the last quarter of 2008 and is targeted to be completed in 2013. When completed, Downtown Line 1 will be a 4.3 km fully underground rail transit system with six stations that will connect the East-West Line at Bugis station to the North-East Line at Chinatown station. Visit www.stec.net or www.tunnelling.cn 34-35/08.Invitation to tender, deadline 9th January, 2009 for design and construction of stations at Petir and tunnels (contract 912) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 23rd January, 2009 for design and construction of tunnels between stations at Beauty World and Hillview (contract 915) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 14th November, 2008 for design and construction of station at Beauty World and tunnels (contract 916) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 28th November, 2008 for design and construction of stations and tunnels at Rochor and Little India (contract 921) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 30th December, 2008 for electrical and mechanical consultancy services (contract 9158A) for the Downtown Line Stage 2. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.Invitation to tender, deadline 30th December, 2008 for electrical and mechanical consultancy services (contract 9158B) for the Downtown Line Stage 3. Contact Land Transport Authority (LTA), Tender division, Ms Chan Mei Yin / Ms Low Bee Eng, tel. +65 63961190 / 1202, fax +65 63961124, e-mail lta_contracts@lta.gov.sg 41/08.



Permalink

Singapore, - sg/15

Circle Line - Metro

Circle Line - sg/15Metro Feasibility study by LTA for an orbital metro route connecting the suburbs to the west, north and east of the island's city centre. Preferred route links Paya Lebar on the West line to Bishan on the MRT North line, Serangoon on the North East line and Buona Vista on the East line. Construction to start 2005, following completion of the NEL, Changi Airport branch and the first phase of the Marina line. Island's rail network will be virtually doubled from 83 to 154 route-km by 2005. Four more metro routes are included in the long-term development strategy for completion by 2030, with the ring line to be followed by new routes serving Jurong, Bukit Timah and Tampines in the east. December 1999.   First stage now called Marina Line Extension, from Boulevard station at national stadium to rail staging yards at Upper Paya Lebar. Tenders for consultancy contract have closed and announcement of award pending. Visit www.gov.sg/gitis/ 15/01.   Invitation by LTA to contractors to pre-qualify for Stage 2 with route length 5.5 km from Stadium Boulevard with stations at Old Airport Road (OAR), Tanjong Katong (TKT), Paya Lebar (PYL), Macpherson (MPS) and Upper Paya Lebar (UPL), and an underground depot at Kim Chuan. PYL station will interchange with the existing Paya Lebar (East-West Line) MRT station. All stations except PYL and UPL will be designed as underground civil defence stations. Visit www.gov.sg/gitis and www.lta.gov.sg 35/01. Maunsell Consultants proceeding with $436m design contract for Circle Line second stage, with 5.5 km of bored and cut-and-cover tunnels and five underground stations. Construction to start by end-2002 for completion in 2006. Visit www.lta.gov.sg/projects 42/01. A jv of Econ Corporation Ltd and NCC has been awarded contract C822 for approximately S$338.6 million for construction of the MacPherson and Upper Paya Lebar underground stations and tunnels. Visit www.gov.sg/lta and www.ncc.se 33/02.Lum Chang Building Contractors Pte Ltd and Nishimatsu have won a S$321.6 million order for contract C823. The partners will build the Old Airport Road, Tanjong Katong and Paya Lebar underground stations and 3,300 m of bored tunnels. EPB shield machines to be used, outer diameter 6.63 m. Visit www.gov.sg/lta and www.nishimatsu.co.jp. C822 and C823 are part of Circle Line stage 2. Contract periods from 1st August, 2002 to 30th August, 2006. 33/02. The Land Transport Authority (LTA) has issued several open invitations to tender for the construction of tunnels and underground stations as part of Stage 3 of the Circle Line (CCL). Contract C852, deadline 28th April, 2003 is for the construction of Serangoon interchange station and associated tunnels between Bartley and Serangoon stations and between Serangoon and Lorong Chuan stations. Contract C853, deadline 21st April, 2003 is for the construction of Marymount station and associated tunnels between Lorong Chuan and Bishan stations and Bishan and Marymount stations. Contract C851A, deadline 16th April, 2003 is for the construction of Bartley station. Contract C852A, deadline 16th April, 2003 is for the construction of Lorong Chuan station. Contract C853A, deadline 25th April, 2003 is for the design and construction of Bishan interchange station. Contact Land Transport Authority, Projects & Engineering Office, Contracts & Process Division, Tenders Section, 1 Hampshire Road, Block 1, Singapore 219428. Contact Mr Kho Cheong Kiat, tel.+65 63961180 or Ms Low Bee Eng, tel. +65 63961202. E-mail bee_eng_low@lta.gov.sg. Tenders have already been invited for electrical services, tunnel ventilation and environmental control systems, and fire protection systems. Read E-News Weekly # 62.Stage 3 will extend the line from Upper Paya Lebar Road/Bartley Road to Marymount Road. This stretch with five underground stations is 5.7 km-long. Construction will start in the third quarter of 2003 to end in early 2008. Construction cost of about S$1.2 billion. The CCL is an orbital line linking all radial metro lines running into the city. It will run from Dhoby Ghaut to Paya Lebar, Serangoon, Bishan, Buona Vista and Harbour Front. Visit www.lta.gov.sg 10/03. The 12 prequalified tenderers for contract C852, which is the construction of Serangoon interchange station and associated tunnels between Bartley and Serangoon stations and between Serangoon and Lorong Chuan stations, are Econ / NCC International; Hyundai Engineering & Construction; Leighton; Nishimatsu; Obayashi; Penta-Ocean Construction; Samsung / Tiong Seng; Taisei; Tobishima / Wan Soon Construction; Woh Hup / Shanghai Tunnel Engineering / Alpine Mayreder; Züblin / Koh Brother Building & Civil Engineering; and Ssang Yong Engineering & Construction.The 11 prequalified candidates for contract C853, which is the construction of Marymount station and associated tunnels between Lorong Chuan and Bishan stations and Bishan and Marymount stations, are Greatearth Construction / United Engineers / Sato Kogyo; Hyundai Engineering & Construction; Leighton; Obayashi; Penta-Ocean Construction; Samsung; Taisei; Tobishima / Wan Soon Construction; Woh Hup / Shanghai Tunnel Engineering / Alpine Mayreder; Züblin / Koh Brother Building & Civil Engineering; and Ssang Yong Engineering and Construction. Visit www.lta.gov.sg 16/03. Contract C852A for construction of the Lorong Chuan station has been awarded to Sato Kogyo for S$65 million. The contract is part of Stage 3 of the Circle Line. The contract involves civil, structural, architectural, plumbing, drainage and reinstatement works for the station. More in E-News Weekly # 28/2003. Visit www.lta.gov.sg and www.satokogyo.com.sg 28/03.Prequalification, deadline 25th July, for civil construction of the stations and tunnels for Stages 4 and 5, contracts 854, 855 and 856. The internal diameter of the bored tunnels will be 5.8 m approximately. Contract 854 is for construction of 5.3 km of twin bored tunnels, 320 m of cut-and-cover tunnels, and three underground stations. Contract 855 is for construction of 4 km of twin bored tunnels, 350 m of cut-and-cover tunnels, civil works for three underground stations, and architectural and building services for another four stations. Contract 856 is for construction of 3.4 km of twin bored tunnels, 640 m of cut-and-cover tunnels, civil works for four underground stations, and architectural and building services for five more stations. Tunnelling using both slurry and EPB TBMs. Contact Land Transport Authority, Project & Engineering Office, Contracts & Process Division, Tenders Section, Section 1, Hampshire Road Block 1, Singapore 219428, Mr Kho Cheong Kiat, tel. +65 63961180 or Ms Low Bee Eng, tel. +65 63961202, e-mail bee_eng_low@lta.gov.sg. Visit www.gebiz.gov.sg 29/03.Civil works contract C852 for Stage 3 of the Circle Line (CCL), worth S$155.9 million, has been awarded to to the Woh Hup / Shanghai Tunnel Engineering Co. (STEC) / Alpine Mayreder JV. This contract involves the construction and completion of Serangoon interchange station, the interconnecting tunnels from Serangoon station to Lorong Chuan station, and from Serangoon station to Bartley station. Visit www.wohhup.com, www.stec.net and www.alpine.at 43/03.Contract C853 for the construction and completion of Marymount station including the tunnels between Lorong Chuan and Bishan stations and Bishan and Marymount stations has been awarded to Taisei Corporation for S$167.7 million. This contract involves the civil, structural, architectural, plumbing, drainage and reinstatement works for the station including the twin bored tunnels. Visit www.taisei.co.jp/english 43/03.Contract C851A for the construction of Bartley station has been awarded to Wan Soon Construction for S$63.5 million. This contract involves the civil, structural, architectural, plumbing, drainage and reinstatement works for the station. Visit www.wansoon.com.sg 43/03.Contract C853A for the design, construction and completion of Bishan interchange station has been awarded to a JV between Econ Corporation and Eng Lim Construction for S$82.2 million. This contract involves the civil, structural, architectural, plumbing, drainage and reinstatement works for the station. Visit www.econ.com.sg 43/03.Stage 3 of the CCL is 5.7 km-long with five stations, running from Bartley Road to Marymount Road, with interchange stations at Serangoon (with the North East Line) and Bishan (with the North-South Line). It will cost about S$1.2 billion to build. Visit www.lta.gov.sg 43/03.As part of Stages 4 and 5 of the CCL, the twelve prequalified applicants for contract C854 are Züblin / Koh Brothers; Gammon Skanska; Hyundai / Straits Construction; Leighton; Obayashi; Penta Ocean; Sato Kogyo / Greatearth Construction; Sembcorp; SsangYong; Taisei; Tobishima / Wan Soon; and Wayss & Freytag. Contract 854 comprises 5.3 km of 5.8 m-diameter twin bored tunnels, 320 m of cut-and-cover tunnels, and three underground stations. 43/03.The eleven prequalified proponents for contract C855 are Züblin / Koh Brothers; Hyundai / Straits Construction; NCC; Nishimatsu / Lum Chang; Obayashi; Samsung; Sato Kogyo / Greatearth Construction; Shimizu / United Engineer; Taisei; Tobishima / Wan Soon; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 855 comprises 4 km of 5.8 m-diameter twin bored tunnels, 350 m of cut-and-cover tunnels, civil works for three underground stations, and architectural and building services for another four stations. 43/03.The twelve prequalified candidates for contract C856 are Gammon Skanska; Leighton; NCC; Nishimatsu / Lum Chang; Obayashi / Sato Kogyo; Penta Ocean; Samsung; Sembcorp; Shimizu / United Engineer; SsangYong; Wayss & Freytag; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 856 comprises 3.4 km of 5.8 m-diameter twin bored tunnels, 640 m of cut-and-cover tunnels, civil works for four underground stations, and architectural and building services for five more stations. All bored tunnels to be driven using slurry and EPB TBMs. Visit www.lta.gov.sg 43/03.There have been changes in the prequalified JVs for Stages 4 and 5 of the Circle Line. There are now six prequalified applicants for contract C854 instead of 12 before. They are Zueblin / Koh Brothers / NCC; Hyundai / Straits Construction; Obayashi / Sato Kogyo / Greatearth Construction; Sembcorp; Taisei; and Tobishima / Wan Soon. Contract 854 comprises 5.3 km of 5.8 m-diameter twin bored tunnels, 320 m of cut-and-cover tunnels, and three underground stations. 17/04.There are now ten prequalified proponents for contract C855 instead of eleven. They are Zueblin / Koh Brothers / NCC; Hyundai / Straits Construction; Nishimatsu / Lum Chang; Obayashi; Sato Kogyo / Greatearth Construction; Shimizu / United Engineer; Taisei / Sembcorp; Tobishima / Wan Soon; Wayss and Freytag / China State Construction Engineering Corporation; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 855 comprises 4 km of 5.8 m-diameter twin bored tunnels, 350 m of cut-and-cover tunnels, civil works for three underground stations, and architectural and building services for another four stations. 17/04.The nine prequalified candidates for contract C856, instead of 12 previously, are Leighton; NCC; Nishimatsu / Lum Chang; Obayashi / Sato Kogyo; Penta Ocean; Shimizu / United Engineer; Taisei / Sembcorp ; Wayss & Freytag; and Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder. Contract 856 comprises 3.4 km of 5.8 m-diameter twin bored tunnels, 640 m of cut-and-cover tunnels, civil works for four underground stations, and architectural and building services for five more stations. All bored tunnels to be driven using slurry and EPB TBMs. Visit www.lta.gov.sg 17/04.A Nishimatsu / Lum Chang JV has emerged as the lowest bidder for contract C855 as part of Stage 4 of the 33 km Circle Line. The contract is for the construction of the Holland, Buona Vista and National University Hospital stations, 4 km of 5.8 m-diameter twin bored tunnels and 350 m of cut-and-cover tunnels. Nishimatsu-Lum Chang's bids were between SGD376.4 million and SGD389 million. The next lowest bids, from the Woh Hup-Shanghai Tunnel Engineering Co.-Alpine Mayreder consortium, were between SGD391 million and SGD398 million. The other bids came from Obayashi (SGD400.3 million), SembCorp Engineers (between SGD399 million and SGD404 million) and a team formed by Shimizu and United Engineers (between SGD448.8 million and SGD452.6 million). If the lowest bid has the best chance of winning, because of the Nicoll Highway collapse, the authorities will take longer to deliberate on who should be given the job. Visit www.lta.gov.sg. Subscribe to E-News Weekly 22/2004. 23/04.Taisei put in the lowest bid to win a SGD391.6 million contract to build a section of stages 4 and 5 of the MRT Circle Line. Its bid was almost SGD30 million less than the next lowest. The contract is the first of three civil works contracts for the two stages of the underground Circle Line. It involves the building of Adam and Farrer stations, twin tunnels of 6.3 km each, provisions for future stations in Bukit Brown and Thomson Road, as well as the construction of commuter facilities. Visit www.lta.gov.sg and www.taisei.co.jp/english 30/04.A civil works contract, worth SGD399.9 million, for the construction and completion of Holland, Buona Vista and National University Hospital stations, including fit out works and tunnels for One-North station has been awarded to the Woh Hup / Shanghai Tunnel Engineering Co. / Alpine Mayreder JV, as part of Stages 4 and 5 of the Circle Line. This is the second of three civil works contracts to be awarded for these two stages. Visit www.lta.gov.sg 35/04.This JV already won contract C852 as part of Stage 3 and has purchased Black Diamond Cutters' single and twin 17 inch cutter assemblies for use on the two Herrenknecht TBMs for this project, with diameter 6.3 m on 2 x 3 km drives. Delivery is for October 2004. Visit www.blackdiamondcutters.com.au 35/04. SembCorp Engineers has clinched the final civil works contract for the Circle Line with the lowest bid of SGD335.4 million. The scope of work covers the construction of tunnels and four new stations at West Coast, Pasir Panjang, Alexandra and Telok Blangah as well as HarbourFront station fit out works. West Coast station has been earmarked as a future station as the area around it is not fully developed. Only structural provisions will be made at this station to facilitate future construction. The first stage of the line was supposed to be ready by 2007, but is likely to be delayed for at least a year because of the tragic collapse at the Nicoll Highway stretch of tunnels in April. Visit www.lta.gov.sg and www.sembcorpenc.com 42/04.The Land Transport Authority (LTA) has awarded the civil works contract 901 for the Circle Line (CCL) to Hock Lian Seng Infrastructure. The contract is valued at SGD348.4 million. Contract 901 is for the construction and completion of the Marina Bay station and tunnels. The scope of the contract also includes addition and alteration works to the existing North South Line (NSL) at Marina Bay station, diversions as well as demolition of an underpass. Visit www.hlsgroup.com.sg 10/08.The LTA also awarded contract 830A for the electrical and mechanical systems for the CCL to the consortium of Alstom Transport and Singapore Technologies Electronics. The contract is valued at approximately SGD106 million. Contract 830A covers the design, supply, delivery to site, installation, testing and commissioning of major electrical and mechanical systems, such as signalling system, platform screen doors, communications system, integrated supervisory control system, power supply system (high tension and traction power), trackworks and travel information system. Visit www.transport.alstom.com and www.stengg.com 10/08.



Permalink

Spain

Spain, Madrid - es/184

Road


Prior information notice for the power supply for public lighting, tunnels, ornamental hydraulic installations and service tunnels of the Madrid City Council. For tender documents please click here. Contact Area de Gobierno de Obras y Equipamientos, Madrid, email sgcontratacionobras@madrid.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=547196-2021. Ref. n. 300/2021/00704. 43/21. 

 

Spain-Madrid: Electricity

2021/S 209-547196

Notice on a buyer profile

This notice is related to following: Prior information notice

Supplies

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: Área de Gobierno de Obras y Equipamientos
National registration number: P2807900B
Postal address: Alcalá, 45
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28014
Country: Spain
Contact person: Área de Gobierno de Obras y Equipamientos
E-mail: sgcontratacionobras@madrid.es
Internet address(es):
Main address: http://www.madrid.es
Address of the buyer profile: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=FzqTvj596R3nSoTX3z%2F7wA%3D%3D
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=K31B2d7QhIEBPRBxZ4nJ%2Fg%3D%3D
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Contrato de suministro de energía eléctrica destinada al alumbrado público, túneles, instalaciones hidráulicas ornamentales y galerías de servicios del Ayuntamiento de Madrid

Reference number: 300/2021/00704
II.1.2)Main CPV code
09310000 Electricity
II.1.3)Type of contract
Supplies
II.2)Description
II.2.3)Place of performance
NUTS code: ES300 Madrid
II.2.4)Description of the procurement:

Contrato de suministro de energía eléctrica destinada al alumbrado público, túneles, instalaciones hidráulicas ornamentales y galerías de servicios del Ayuntamiento de Madrid

Section VI: Complementary information

VI.3)Additional information:
VI.5)Date of dispatch of this notice:
22/10/2021



Permalink

Spain, Galicia - es/172

Railway

Sistemas y Montajes Industriales secured the EUR65,706 contract, VAT included, for  the management of civil protection equipment in the four tunnels Vado Yeso (1,684 m), Gobantes (861 m), Gaitan/El Chorro (5,321 m) and Duran (469 m) on the Bobadilla-Malaga line. The aim of this work is to ensure power supply in the tunnels, located in the province of Malaga. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/D8EF03BE7AC9DF97C1257B80003A9A7B?Opendocument. 25/13.



Permalink

Page: