Sistemas y Montajes Industriales secured the EUR65,706 contract, VAT included, for the management of civil protection equipment in the four tunnels Vado Yeso (1,684 m), Gobantes (861 m), Gaitan/El Chorro (5,321 m) and Duran (469 m) on the Bobadilla-Malaga line. The aim of this work is to ensure power supply in the tunnels, located in the province of Malaga. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/D8EF03BE7AC9DF97C1257B80003A9A7B?Opendocument. 25/13.