Bulgaria, Vidin, Montana, Vratsa and Sofia - bg/15

Railway

Closing Date: 21.05.2026

The deadline for the open procedure covering the modernisation of the Vidin–Sofia railway line (Vidin–Sratsimir section) has been postponed to 21/05/2026. 

Project Overview

The scheme involves the construction of a new 20 km railway section (p.k. 149+393 – p.k. 129+225), forming part of a wider upgrade between Medkovets and Vidin. The works aim to improve alignment, increase speeds, and enhance overall network performance.

The project includes:

  • One main railway tunnel: 2,975 m
  • One new station
  • Associated civil and railway infrastructure works 

Tunnel & Engineering Scope

Main Tunnel

  • A single tunnel of 2,975 m forms the core of the project
  • Designed to bypass existing curved sections, enabling a straighter and shorter alignment

Design & Build Contract

  • Open procedure covering both design and construction
  • Contractor responsibilities include:
    • Preparation of the working investment project in line with client specifications
    • Provision of author’s supervision during construction

Civil Works & Rail Infrastructure

Extensive works are required to upgrade the corridor, including:

  • Installation of heavier rail systems
  • Upgrades to catenary (electrification) systems
  • Construction of viaducts and bridges across challenging terrain
  • Integration of the tunnel within the new alignment 

Operational Performance

The upgraded line is designed for:

  • Passenger trains: up to 160 km/h
  • Freight trains: up to 120 km/h 

Strategic Importance

This section forms part of the Trans-European Transport Network (TEN-T) corridor and benefits from significant European Union support, highlighting its importance for regional and cross-border connectivity. 

Contract Details

Contract value: EUR 282.44 million (excluding VAT)

Duration: 1,520 days 

Tender Access

https://app.eop.bg/today/538626 (tender documents and bid submission) 

Contact

National Railway Infrastructure Company
Attn: Ivelina Kitina, Sofia
Tel: +359 29322059
Fax: +359 29310663
Email: i.kitina@rail-infra.bg

 

Further Information

Ref. no.: 538626. 13/26