FR Kummler+Matter EVT SA from Le Mont-sur-Lausanne secured the EUR 1.20 million (CHF1.14 million) contract, excluding VAT, for the adaptation of the lighting (upgrading to LED):
- of crossings in the Hauts-Geneveys tunnel (810 m), in the Malvilliers and Boudevilliers covered trenches;
- in the MontSagne (1355 m), Vue des Alpes (3250 m), Hauts-Geneveys (810 m) and Gorges du Seyon (m 1020 m, 860 m) tunnels, in the Malvilliers and Boudevilliers covered trenches;
- in the escape routes of the Boudevilliers covered trench and of the Gorges du Seyon tunnel (m 1020 m, 860 m);
- for the replacement of 2 traffic census stations
- for the delivery and installation (or renewal) of safety road signs (emergency exits, SOS niches, direction and distance of emergency exits, emergency exits in escape tunnels)