Travipos SA from Constanti secured the EUR 1.62 million contract, excluding VAT, for the supply, transport and unloading of reinforced concrete block in the Mediterranean Corridor, section Castellbisbal-Murcia, subsection: Castellbisbal-Martorell. The contract is composed of 2 Lots: tunnel Martorell, double track, 1060 m-length (Lot 1) and tunnel Castellbisbal, double track, 870 m-length (Lot 2). Contact Adif, attn Rosa Cabrerizo Ruiz, Madrid, tel +34 913007689, fax +34 913006623, email rcabrerizo@adif.es. For tender information please click here
Ref.n. 3.18/27510.0108. 30/20.