Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Galicia - es/195

High Speed Railway


The Joint Venture Applus Norcontrol SLU from Sada (50%) and Eptisa Servicios de Ingenieria SL from Sada (50%) secured the EUR 1.30 million contract, excluding VAT. For consultancy and assistance to the general management during construction of a platform for urban integration and conditioning of the Ourense railway network (section Taboadela-Seixalbo, sub-section Rante tunnel – Seixalbo) Connection. Contact ADIF Alta Velocidad,  Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=025189-2022. Ref.n. 3.21/20830.0083 – CON 005/21. 03/22.  



Permalink