The JV Esteyco SA (60 %)/Team Ingenieria y Consultoria SL (40 %) from Madrid secured the EUR 1,197,796.92 contract, excluding VAT, for consulting and technical assistance for the general management during the construction of new emergency exits in tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, section Vitoria-Bilbao. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, email contrataciondcc@adif.es. For bid/tender documents click here.
Ref.n. 3.19/20830.0026- CON 006/19. 42/19.