Accelerated restricted procedure, deadline 5th May, 2004 for construction of lots IV and IV bis of the Trasversale delle Serre in Catanzaro province including 2.5 km of tunnel, whereof three two-way single bore tunnels totalling 1,242 m and seven cut-and-cover tunnels for the remaining length. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=055457-2004, OJ S 65, or contact ANAS, Rome, fax +39 064454956. Visit www.stradeanas.it 16/04.Technital, 3TI Progetti and Alpina have pocketed a contract for the detailed design and environment impact study as part of the upgrading of road SS 106 Jonica, section Squillace-Simeri Cricchi, lots 1 to 5, and the extension to road SS 280 Due Mari. The 22.4 km road, whereof 17.2 km for SS 106 and 5.2 km for SS 280, includes 11 tunnels and will cost EUR740 million to build. Visit www.technital-spa.com, www.3tiprogetti.it and www.alpina-spa.it 27/04.Condotte secured a nearly EUR84 million contract to build section 2 of the Palizzi bypass on trunk road SS 106 Jonica in Catanzaro province. The job requires four twin bored tunnels in Palizzi (427.71 m / 387.4 m), Ambusena (111.7 m / 67 m), Peristeri (969.4 m / 993.5 m) and San Antonino (632.6 m / 629.4 m). Support with steel-reinforced shotcrete combined with Swellex bolts, steel arches, and fore piling. Subscribe to E-News Weekly 27/2004. Visit www.condottespa.it 51-52/04.
Accelerated restricted procedure, deadline 30th March, 2005 for construction of the 4.1 km Marina di Gioiosa Jonica outer bypass on SS 106. It is a dual carriageway carrying two 3.75 m-wide lanes and two shoulders (1.75 m and 0.5 m) in each sense. The project includes three bored tunnels: Pantalogna (470 m / 461 m), Schiavo 1 (210 m / 170 m) and Schiavo 2 (503 m / 479 m) and the 216 m Romano cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=037332-2005, OJ S 39, or contact ANAS, Rome, fax +39 064454956. 11/05.Torno Internazionale, its affiliate Rabbiosi, SIG and Tecnovese clinched a EUR124 million deal to build contracts IV and IV bis of the Trasversale delle Serre in Catanzaro province including 2.5 km of tunnel, whereof three two-way single bore tunnels totalling 1,242 m and seven cut-and-cover tunnels for the remaining length. Visit www.torno.com 15/05.A consortium of Via Ingegneria, Cooprogetti and Girpa for the design and Immobilgi Federici Stirling, DE.MO.TER. and Fondazioni Speciali-Sicos for the civil works has been awarded a EUR76 million contract to build the 3.5 km Marina di Gioiosa Jonica bypass, including three twin bored tunnels: Pantalogna (460 m / 461 m), Schiavo 1 (210 m / 170 m) and Schiavo 2 (503 m / 479 m), and the Romano false tunnel (216 m). The bored tunnels will be dug in clay and marls, using an excavator equipped with hydraulic breaker and ripper. Canopies of steel pipes will previously be drilled around the tunnel contour by forepoling. The tunnel face will be supported by fibre glass nails, steel arches (double IPN 180) and fibre-reinforced shotcrete. Wire mesh will be installed at the portals. Click here. Visit www.immobilgi.com, www.demoter.net, www.fondazioni-speciali.com, www.cooprogetti.it and www.girpa.it 39/06.Anas, the operator of roads and motorways in Italy, has approved the construction project of the second mega lot of the new trunk road SS 106 on the Ionian coast, in Catanzaro province. The project consists in constructing a total of 22.4 km, namely the Squillace-Simeri Crichi section (17.2 km) and a new section on trunk road SS 280 "dei Due Mari" (5.2 km). The green light to the construction project means that the worksites will be opened in the next few weeks. A total of 11 tunnels will be built. The project has a total cost of EUR652.4 million. The final design and construction has been awarded to a JV of Astaldi and Nino Ferrari, who formed a company for the project named CO.MERI. Click here. Visit www.astaldi.com 50/06.