The JV Implenia Oesterreich GmbH/Hochtief Infrastructure GmbH/Thyssen Schachtbau GmbH – pA Implenia Oesterreich GmbH of Salzburg secured the EUR456.555.964, excluding VAT, for construction of eastern section twin single-track tubes of lot SBT1.1 at the Gloggnitz tunnel, part of the Semmering base tunnel. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, tel + 43 193000-45812, fax -45829, e-mail richard.polaczek@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231104-2015. Ref.n. AVA30444, B13047. NUTS-Code AT12. 27/15