Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Basque Country - es/100

High Speed Railway

Open call for bids, deadline 13th March, 2003 for consulting and assistance to the design of the Legutiano-Escoriatza section of the Vitoria-Bilbao-San Sebastií¡n high speed link. There is in particular a 4.6 km tunnel. Tender value: €1.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=022076-2003, OJ S 27, or contact GIF, Madrid, fax +34 913198535. 08/03.Open call for bids, deadline 26th April, 2004 for design and build contract for sections Arrazua/Ubarrundia-Legutiano (7.8 km) and Legutiano-Escoriatza (7.4 km) of the high speed line between Vitoria, Bilbao and San Sebastian in Alava province. Includes the Luko tunnel (961 m) and the Albertia tunnel (4.9 km). Tender budget for design: EUR2.15 million, time frame: six months. Tender budget for construction: EUR278.7 million, time frame: 46 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040295-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 26th April, 2004 for design and build contract for sections Amorebieta/Etxano-Lemoa (3.4 km), Lemoa-Galdakao (5.4 km) and Galdakao-Basauri (3.6 km) of the high speed line between Vitoria, Bilbao and San Sebastian in Biscay province. There are four tunnels in Ganzelai (1,359 m), San Roman (735 m), Galdakao (1,792 m) and Zaratamo (2,716 m). Tender budget for design: EUR1.6 million, time frame: six months. Tender budget for construction: EUR185 million, time frame: 38 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040296-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 26th April, 2004 for design and build contract for sections Hernialde-Zizurkil (5.8 km), Zizurkil-Urnieta (7.2 km) and Urnieta-Hernani (5.4 km) of the high speed line between Vitoria, Bilbao and San Sebastian in Guipuzcoa province. There are five tunnels in Anoeta (1,260 m), Inura (2,467 m), Andoain (1,706 m), Aduna (4,540 m) and Hernani (2,635 m). Tender budget for design: EUR2.8 million, time frame: eight months. Tender budget for construction: EUR343.7 million, time frame: 36 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040297-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 23rd April, 2004 for construction management for section Mondragon-Bilbao of the high speed line between Vitoria, Bilbao and San Sebastian. Tender budget: EUR11.9 million, time frame: 60 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040512-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 23rd April, 2004 for construction management for section Vitoria-Mondragon of the high speed line between Vitoria, Bilbao and San Sebastian. Tender budget: EUR11.8 million, time frame: 55 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=040545-2004, OJ S 47, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 23rd April, 2004 for construction management for section Hernialde-Bidasoa river of the high speed line between Vitoria, Bilbao and San Sebastian. Tender budget: EUR9.4 million, time frame: 60 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=041280-2004, OJ S 48, or contact GIF, Madrid, fax +34 913198535. 12/04.Open call for bids, deadline 30th October, 2004 for design of the Aramaio-Mondragon section on the Vitoria-Bilbao-San Sebastian line. Tender budget: 600,000 euros. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=163936-2004, OJ S 192, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for design of 7.4 km Legutiano-Escoriatza section on the Vitoria-Bilbao-San Sebastian line. This section includes the 4.6 km Albertia tunnel. Tender budget: EUR1.25 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=163917-2004, OJ S 192, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for design of the 5.6 km Escoriatza-Aramaio section on the Vitoria-Bilbao-San Sebastian line. Tender budget: EUR1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=164800-2004, OJ S 193, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for design of the 7.8 km Arruzaua/Ubarrundia-Legutiano section on the Vitoria-Bilbao-San Sebastian line. Tender budget: EUR900,000. This section includes the 961 m Luko tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=164801-2004, OJ S 193, or contact GIF, Madrid, fax +34 917005751. 42/04.Open call for bids, deadline 5th November, 2004 for construction supervision services for the Vitoria-Bilbao section on the Vitoria-Bilbao-San Sebastian line. Tender budget: EUR2.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=164738-2004, OJ S 193, or contact GIF, Madrid, fax +34 917005751. 42/04.Sener and Ineco secured a EUR1.6 million contract for construction supervision services for the Vitoria-Bilbao section on the Vitoria-Bilbao-San Sebastian line. Visit www.sener.es and www.ineco.es 02/05.Saitec will design the 7.8 km Arruzaua/Ubarrundia-Legutiano section on the Vitoria-Bilbao-San Sebastian high speed line. Contract value: EUR643,500. This section includes the 961 m Luko tunnel. Visit www.saitec.es 03/05.Proser will design the 7.4 km Legutiano-Escoriatza section on the Vitoria-Bilbao-San Sebastian high speed line. Contract value: EUR912,550. This section includes the 4.6 km Albertia tunnel. Visit www.proser.es 03/05.Proser will design the 7.4 km Legutiano-Escoriatza section on the Vitoria-Bilbao-San Sebastian line, which includes the 4.6 km Albertia tunnel. Visit www.proser.es 05/05.Synconsult secured a EUR633.600 million contract to design section Escoriatza-Aramaio on the Y-shaped high speed line which will link Vitoria, Bilbao and San Sebastian. The 5.6 km section includes four tunnels totalling 3,366 m. 11/05.Open call for tenders, deadline 7th April, 2005 for construction of section Ordizia-Itsasondo in Gipuzkoa province. This section includes a 3 km tunnel approximately. Tender estimate: EUR55 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=045076-2005, OJ S 47, or contact the Basque government, San Sebastian, fax +34 945019742 or 945019787. E-mail transyop@ej-gv.es 12/05.A JV of Vigiconsult, Euroconsult and ICYE secured a EUR491,700 contract to design section Abadino-Durango on the so-called Y line, the high speed railway between Vitoria, Bilbao and San Sebastian. This 3.5 km section includes two tunnels for a total length of 1,488 m. Subscribe to E-News Weekly 10/2005. Visit www.vigiconsult.com and www.euroconsult.es 22/05AEPO and S.M.D. pocketed a EUR873,300 contract to design section Amorebieta/Etxano-Amorebieta/Etxano on the same line. This 5.1 km section includes four tunnels, for a total length of 1,575 m. Subscribe to E-News Weekly 10/2005. Visit www.aepo.es 22/05.Idom and Geoconsult Espaí±a secured a EUR798,400 contract to design section Durango-Amorebieta/Etxano (4.6 km) on the Vitoria-Bilbao-San Sebastian line, which includes three tunnels totalling 2,295 m. Subscribe to E-News Weekly 10/2005. Visit www.idom.es and www.geoconsult.es 23/05.Euroestudios secured a EUR619.800 contract to design section Lemoa-Galdakao (5.4 km) on the Vitoria-Bilbao-San Sebastian line, which includes a 1,792 m tunnel. Subscribe to E-News Weekly 10/2005. Visit www.euroestudios.es 23/05.Intraesa and Noega Ingenieros secured a EUR542,300 contract to design section Amorebieta/Etxano-Lemoa (3.4 km) on the Vitoria-Bilbao-San Sebastian line, which includes three tunnels totalling 2,394 m. Subscribe to E-News Weekly 10/2005. Visit www.intraesa.com 23/05.Ayesa secured a EUR493,450 contract to design section Galdakao-Basauri (3.6 km) on the Vitoria-Bilbao-San Sebastian line, which includes a 2,716 m tunnel. Subscribe to E-News Weekly 10/2005. Visit www.ayesa.es 23/05.Eptisa secured a EUR820,500 contract to design the 4.4 km Mondragon-Elorrio section on the Vitoria-Bilbao-San Sebastian line, including a 3,168 m tunnel. Subscribe to E-News Weekly 10/2005. Visit www.eptisa.es 24/05.Open call for tenders, deadline 16th February, 2006 for safety and health coordination during construction of the Vitoria-Bilbao-San Sebastian high speed line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=09024-2006, OJ S 8, or contact ADIF, fax +34 917005751. 05/06.Open call for tenders, deadline 12th April, 2006 for work supervision during construction of section Arrazua/Ubarrundia-Legutiano (7.8 km) on the high speed link between Vitoria, Bilbao and San Sebastian. This section includes the 960 m-long Luko tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=053725-2006, OJ S 51, or contact ADIF, Madrid, fax +34 917005751. 13/06.ADIF, the authority responsible for managing the construction of high speed lines, has awarded the first contract on the line that will connect the three capitals of the Basque autonomous region (Vitoria-Gasteiz, Bilbao and San Sebastian) to a JV of Tecsa and Altuna y Uria, for EUR34.3 million and a construction period of 24 months. It is the 5.2 km-long Arrazua/Ubarrundia-Legutiano section which includes a 139 m underpass beneath the Vitoria-Gasteiz-Eibar motorway and the 970 m-long 95 sq m Luko tunnel. Visit www.adif.es, www.tecsa.es and www.altunayuria.com 15/06.Periodic notice for work control of section Mondragon-Elorrio (4.4 km), which includes a 3,168 m tunnel. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074706-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Abadino-Durango (3.5 km), which includes a 1,488 m tunnel. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074707-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Lemoa-Galdakao (5.4 km), which includes a 1,792 m tunnel. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074708-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Arrazua/Ubarrundia-Legutiano (7.8 km), which includes the Luko tunnel (961 m). This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074709-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Legutiano-Escoriatza (7.4 km), which includes the Albertia tunnel (4.6 km). This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074711-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06. Periodic notice for work control of section Durango-Amorebieta/Etxano (4.6 km), which includes three tunnels for a total length of 2,295 metres. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074712-2006, OJ S 71, or contact ADIF, Madrid, fax +34 917005751. 17/06.Periodic notice for work control of section Amorebieta/Etxano-Lemoa (3.4 km), which includes three tunnels totalling 2,400 metres. This periodic notice is a call for tenders which objective is to reduce the time for receipt of bids. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=075664-2006, OJ S 72, or contact ADIF, Madrid, fax +34 917005751. 19/06.Prointec and Cipsa Consulpal bagged a EUR945,800 contract for safety and health coordination during construction of the Vitoria-Bilbao-San Sebastian high speed line. Visit www.prointec.es and www.cipsaconsulpal.es 24/06.Saitec has won a EUR1.6 million contract for work supervision during construction of section Arrazua/Ubarrundia-Legutiano (7.8 km) on the high speed link between Vitoria, Bilbao and San Sebastian. This section includes the 960 m-long Luko tunnel. Visit www.saitec.es 24/06.Open call for tenders, deadline 25th August, 2006 for work supervision for the 7.4 km Legutiano-Escoriatza section, subsections I and II on the Basque high speed link between Vitoria, Bilbao and San Sebastian. The section includes the 4.6 km Albertia tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=152911-2006, OJ S 142, or contact ADIF, Madrid, fax +34 917005751. 33-34/06Open call for bids, deadline 13th November, 2006 for construction supervision of section Abadino-Durango on the new Vitoria-Bilbao-San Sebastian high speed line. This 3,520 m section includes two tunnels: Eguskiza, 664 m and Mendigain, 960 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=209611-2006, OJ S 197, or contact ADIF, Madrid, fax +34 917005751. Read E-News Weekly 41/2006. 43/06.Open call for bids, deadline 13th November, 2006 for construction supervision of section Mondragon-Elorrio on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain, 410 m and Udalaitz, 3,160 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=209609-2006, OJ S 197, or contact ADIF, Madrid, fax +34 917005751. Read E-News Weekly 41/2006. 43/06.Open call for bids, deadline 13th November, 2006 for construction of the Legutiano-Escoriatza section, subsection I on the new Vitoria-Bilbao-San Sebastian high speed line. The main structure on this 5 km section is the first 2.7 kilometres of the Albertia tunnel, which totals 4.8 km. It is a twin bored tunnel, 57 sq m for each tube. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210177-2006, OJ S 198, or contact ADIF, Madrid, fax +34 917005751. 44/06.Open call for bids, deadline 27th November, 2006 for construction of the Legutiano-Escoriatza section, subsection II on the new Vitoria-Bilbao-San Sebastian high speed line. The main structure on this 2.4 km section is the final 2.1 kilometres of the Albertia tunnel. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210202-2006, OJ S 198, or contact ADIF, Madrid, fax +34 917005751. 44/06.Open call for tenders, deadline 5th December, 2006 for work supervision for sections Eskoriatza-Aramaio and Aramaio-Mondragon on the Y-shaped high speed line between the three Basque capitals (Bilbao, Vitoria and San Sebastian). The first section is 5,580 m long and includes four tunnels: Uruburu 1 (474.7 m), Uruburu 2 (460.1 m), Mazmela, (384.3 m), and Induspe (2,224 m). The Aramaio-Mondragon section is 3,386 m long and includes the 550 m-long Achetarri tunnel. The route is for a double high speed track, IUC gauge. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215174-2006, OJ S 202, or contact ADIF, Madrid, fax +34 91 7005751. 45/06.Open call for bids, deadline 11th December, 2006 for construction of the Mondragon-Elorrio section on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain, 410 m and Udalaitz, 3,160 m. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215828-2006, OJ S 203, or contact ADIF, Madrid, fax +34 917005751. 45/06.Open call for bids, deadline 11th December, 2006 for construction of the Abadino-Durango section on the new Vitoria-Bilbao-San Sebastian high speed line. This 3,520 m section includes two tunnels: Eguskiza, 664 m and Mendigain, 960 m. Read E-News Weekly 41/2006. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215829-2006, OJ S 203, or contact ADIF, Madrid, fax +34 917005751. 45/06.Typsa secured a EUR4.2 million contract for site supervision and work management for the 7.4 km Legutiano-Escoriatza section, subsections I and II on the Basque high speed link between Vitoria, Bilbao and San Sebastian. The section includes the 4.8 km Albertia tunnel. Visit www.typsa.es 51-52/06.Open call for tenders, deadline 19th February, 2007 for construction of the 5.6 km Escoriatza-Aramaio section on the Vitoria-Bilbao-San Sebastian high speed link. This section includes the Uruburu 1, Uruburu 2, Mazmela and Induspe twin-track tunnels, with respective length of 475 m, 460 m, 384 m and 2,224 m and cross section of 85 sq m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=4101-2007, OJ S 4, or contact ADIF, Madrid, fax +34 917005751. 03/07.A EUR65 million contract has been awarded to a JV of Comsa and Cycasa to build the 5 km-long subsection I on the Legutiano-Escoriatza section in Alava province. Construction will take 46 months. This subsection includes the first 2.7 kilometres of the Albertia twin bored tunnel, which totals 4.8 km and has a 57 sq m cross section. Visit www.comsa.com and www.cycasa.com 03/07.A JV between Ferrovial Agroman and Fonorte has been awarded a EUR65.7 million contract to build the 2.4 km-long subsection II on the Legutiano-Escoriatza section in Alava province. Construction will take 45 months. The subsection includes the final 2.1 kilometres of the Albertia tunnel. Visit www.ferrovial.com and www.fonorte.com 03/07.Euroconsult and ICYF pocketed a EUR3.8 million contract for site supervision of section Mondragon-Elorrio on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain, 410 m and Udalaitz, 3,160 m. Visit www.euroconsult.es 07/07.Eurocontrol and Compaí±í­a Vasca de Ingenierí­a signed a EUR2.4 million contract for construction supervision of the 3,520 m-long Abadií±o-Durango section on the new Vitoria-Bilbao-San Sebastian high speed line. The section includes the Eguskiza and Mendigain tunnels, respectively 664 m and 960 m long. Read E-News Weekly 41/2006. Visit www.eurocontrol.es 09/07.Eptisa pocketed a EUR3.3 million contract for work supervision for the Eskoriatza-Aramaio and Aramaio-Mondragon sections on the Y-shaped high speed line between the three Basque capitals (Bilbao, Vitoria and San Sebastian). The first section is 5,580 m long and includes four tunnels: Uruburu 1 (474.7 m), Uruburu 2 (460.1 m), Mazmela, (384.3 m), and Induspe (2,224 m). The Aramaio-Mondragon section is 3,386 m long and includes the 550 m-long Achetarri tunnel. Visit www.eptisa.es 09/07.Construction of the Abadií±o-Durango section on the Vitoria-Bilbao-San Sebastian high speed line has been commissioned to a JV formed by Construcciones Moyua, Construcciones y Promociones Balzola, and Azvi, each with 33.33%. The contract totals EUR50.7 million. This 3,520 m section includes the Eguskiza and Mendigain tunnels, of 664 m and 960 m respectively. Visit www.moyua.com, www.balzola.com and www.azvi.es 11/07.Obras Subterraneas secured a EUR69.7 million contract to build the Mondragon-Elorrio section on the Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes the Karraskain and Udalaitz tunnels, of 410 m and 3,160 m respectively. Visit www.obrassubterraneas.es 11/07.ADIF, the high speed railway administration, awarded Acciona Infraestructuras and Excavaciones Viuda de Sainz a EUR80.9 million contract to build the Eskoriatza-Aramaio section on the high speed link in the Basque Country. The JV pledged to complete construction in 29 months. This 5.58 km section includes a 2,224 m twin-track tunnel. Visit www.acciona.es 15/07.Periodic notice which is a call for tenders aimed at reducing the time for bid submission for construction supervision of the Ordizia-Itsasondo section in Gipuzkoa province. This section includes a 2.8 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=94534-2007, OJ S 77, or contact Red Ferroviaria Vasca, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 19/07.Open call for tenders, deadline 19th June, 2007 for construction supervision of the Amorebieta/Etxano-Lemoa and Amorebieta/Etxano-Amorebieta/Etxano section on the Vitoria-Bilbao-San Sebastian high speed line. The 3,449 m-long Amorebieta/Etxano-Lemoa includes three tunnels (Ganzelai, 1,365 m; San Roman, 727 m; and Marrageruena, 326 m). The 5 km Amorebieta/Etxano-Amorebieta/Etxano includes four tunnels (Arteako, 330 m; Orranpe, 505 m; Erribaso, 330 m; and Arizbakarro, 385 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103583-2007, OJ S 84, or contact ADIF, Madrid, fax +34 917005771. 19/07.Open call for tenders, deadline 3rd July, 2007 for construction of the 3.4 km Amorebieta/Etxano-Lemoa high speed rail section in Biscay province. This section includes the Ganzelai, San Romí¡n and Morrageruena tunnels, respective lengths of 1,365 m, 727 m and 326 m and cross-section of 85 sq m for the first and third tunnels and 95 sq m for the San Romí¡n tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111747-2007, OJ S 91, or contact ADIF, Madrid, fax +34 917005751. 20/07.Open call for tenders, deadline 4th June, 2007 for site supervision and work inspection during construction of the Lemoa-Galdakao and Galdakao-Basauri high speed rail sections in Biscay province. The 5.4 km Lemoa-Galdakao section includes the 1,820 m-long Galdakao tunnel. The 3.6 km Galdakao-Basauri section includes a 2,728 m-long tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105790-2007, OJ S 86, or contact ADIF, Madrid, fax +34 917005751. 21/07.Open call for tenders, deadline 4th June, 2007 for site supervision and work inspection during construction of the Durango-Amorebieta/Etxano high speed rail section in Biscay province. The 4.6 km section includes four mined tunnels: San Andres (703 m), Urzelai (661 m), Olabarrie I (481 m), Olabarrie II (409 m) and the Olabarrie cut-and-cover tunnel (172 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105787-2007, OJ S 86, or contact ADIF, Madrid, fax +34 917005751. 21/07.Open call for tenders, deadline 16th August, 2007 for construction of the 4.6 km-long Durango-Amorebieta/Etxano section, including four mined tunnels: San Andres (703 m, 100 sq m), Urzelai (661 m, 95 sq m) and Olabarrie I and II (481 m and 409 m, 85 sq m), and the Olabarrie cut-and-cover tunnel (172 m) between the last two. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160500-2007, OJ S 131, or contact ADIF, Madrid, fax +34 917005751. 29/07.Open call for bids, deadline 18th September, 2007 for construction of the 5.4 km Lemoa-Galdakao section on the Vitoria-Bilbao-San Sebastian high speed link. This section includes the 1,827 m-long Galdakao bored tunnel and the 230 m-long Galdakao cut-and-cover tunnel, each 85 square metres in cross-section. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183739-2007, OJ S 148, or contact ADIF, fax +34 917005751. 33/07.Periodic notice, no deadline specified, being a call for competition aiming at reducing time limits for the receipt of tenders for design of the Mondragon-Bergara-Elorrio section on the new Vitoria-Bilbao-San Sebastian high speed line. This 4,440 m section includes two tunnels: Karraskain (410 m) and Udalaitz (3,160 m). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162510-2007 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162509-2007, OJ S 132, or contact ADIF, Madrid, fax +34 917005751. E-mail mjmoro@adif.es 34/07.Open call for bids, deadline 8th October, 2007 for construction of the Ordizia-Itsasondo section in Gipuzkoa province. This section includes a 2.8 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=195748-2007, OJ S 157, or contact Basque government and Red ferroviaria vasca, Bilbao, fax +34 945019451 and 946572601. E-mail ets@ets-rfv.es 35/07.Euroestudios and Fulcrum teamed up to get a EUR4.3 million contract for site supervision and work inspection during construction of the Lemoa-Galdakao and Galdakao-Basauri high speed rail sections in Biscay province. The 5.4 km Lemoa-Galdakao section includes the 1,820 m-long Galdakao tunnel. The 3.6 km Galdakao-Basauri section includes a 2,728 m-long tunnel. Visit www.euroestudios.es and www.fulcrum.es 35/07.Ayesa and Azierta Ingenieria secured a EUR4.3 million contract for site supervision of the Amorebieta/Etxano-Lemoa and Amorebieta/Etxano-Amorebieta/Etxano section on the Vitoria-Bilbao-San Sebastian high speed line. The 3,449 m-long Amorebieta/Etxano-Lemoa includes three tunnels (Ganzelai, 1,365 m; San Roman, 727 m; and Marrageruena, 326 m). The 5 km Amorebieta/Etxano-Amorebieta/Etxano includes four tunnels (Arteako, 330 m; Orranpe, 505 m; Erribaso, 330 m; and Arizbakarro, 385 m). Visit www.ayesa.es and www.geoteyco.es 35/07.Paymacotas and Apia XXI have been awarded a EUR4.3 million contract for site supervision and work inspection during construction of the Durango-Amorebieta/Etxano high speed rail section in Biscay province. The 4.6 km section includes four mined tunnels: San Andres (703 m), Urzelai (661 m), Olabarrie I (481 m), Olabarrie II (409 m) and the Olabarrie cut-and-cover tunnel (172 m). Visit www.paymacotas.com and www.apiaxxi.es 35/07.Open call for tenders, deadline 30th October, 2007 for site supervision and work control during construction of the Ordizia-Itsasondo section of the high speed line. This 2,859 m-long section runs almost fully in tunnel (2,814 metres). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221722-2007, OJ S 181, or contact Euskal Trenbide Sarea-Red Ferroviaria Vasca, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 40/07.Open call for tenders, deadline 12th November, 2007 for construction of the 3.5 km Galdakao-Basauri section in Biscay province, including the 2,728 m-long 85 sq m Zaratamo tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=242863-2007, OJ S 200, or contact ADIF, Madrid, fax +34 917005751. 43/07.ADIF has awarded the 4.6 km Durango-Amorebieta/Etxano section on the Vitoria-Bilbao-San Sebastian high speed line to a joint venture formed by Ví­as y Construcciones (75%) and Nortíºnel (25%). The contract is worth EUR70 million and the time frame totals 30 months. The section includes several tunnels: San Andres (703 m), Urzelai (661 m), Olabarrie I and II (481 and 409 m respectively) and, between these two, the 172 m Olabarrie cut-and-cover tunnel. The cross-section is 100 sq m for the San Andres tunnel, 95 sq m for the Urzelai tunnel and 85 sq m for the Olabarrie tunnels. Visit www.vias.es and www.nortunel.com 44/07.Construction of the 5.03 km Amorebieta/Etxano-Amorebieta/Etxano section has been awarded to a joint venture of Construcciones y Promociones Balzola, Construcciones Moyua, and AZVI for an amount of EUR68 million and a time frame of 27 months. The project includes two bored tunnels: Arteako (330 m) and Orranpe (505 m) and two cut-and-cover tunnels: Erribaso (330 m) and Arizbakarra (385 m). Visit www.balzola.com, www.moyua.com and www.azvi.es 44/07.Construction of the Amorebieta/Etxano-Lemoa section has been commissioned to a joint venture formed by Urazca Construcciones and Corsí¡n Corviam, for a cost of EUR45 million and a time frame of 26 months. This 3.45 km section includes the Ganzelai, San Romí¡n and Marrageruena tunnels, respectively 1,365 m, 725 m and 326 m long. Visit www.urazca.com and www.corsan-corviam.es 44/07.A consortium led by Construcciones Ortiz will build the Lemoa-Galdakao section for EUR69 million. This 5.4 km section includes the 1,827 m-long Galdakao bored tunnel and the 230 m-long Galdakao cut-and-cover tunnel, each 85 square metres in cross-section. Visit www.grupoortiz.com 44/07.FCC, Construcciones Olabarri, Guihor Estructuras de Hormigí³n, and Construcciones Donosti scooped a EUR50.5 million contract to construct the 2,859 m Ordizia-Itsasondo section in Gipuzkoa province. This section includes a 2.8 km tunnel (98% of the route). Time frame for construction is 27 months. Visit www.fcc.es, www.olabarri.com and www.codosa.com 50-51/07.ACS, through its affiliate Dragados in partnership with Iza Obras y Promociones, will be responsible for the construction of the 3.53 km Galdakao-Basauri section in Biscay province. Their contract is worth EUR49.4 million and includes the construction of the 2.72 km Zaratamo tunnel. Visit www.dragados.com 02/08.Periodic notice, deadline unspecified, which is a call for tenders with the objective of reducing the time for receipt of bids, for design of the 5.4 km Urnieta-Hernani section, including the 2,638 m Urnieta tunnel and the 815 m Hernani tunnel. Both will be single bore tunnels with a cross section of 95 square metres. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285494-2007, OJ S 234, or contact Red Ferroviaria Vasca, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 03/08.Open call for tenders, deadline 3th March, 2008 for design of the Urnieta-Hernani section in Gipuzkoa province, including the 2,638 m 95 sq m Urnieta single bored tunnel and the 815 m 95 sq Hernani tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=20675-2008, OJ S 16, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 06/08.Open call for tenders, deadline 3th March, 2008 for design of the Hernani-Astigarraga section in Gipuzkoa province, including Tunnel 3.3, a 700 m 95 sq m single bored tunnel, and the 230 m 95 sq m single bored Loyola tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=20673-2008, OJ S 16, or contact ETS-RFV, Bilbao, fax +34 946572601. E-mail ets@ets-rfv.es 06/08.Eptisa landed a EUR1.2 million contract for site supervision and work inspection during construction of the Ordizia-Itsasondo section of the high speed line. This 2,859 m-long section runs almost fully in tunnel (2,814 metres). Visit www.eptisa.es 07/08.Sener scooped a EUR1.3 million contract to design the 5.4 km Urnieta-Hernani section, including the 2,638 m tunnel and the 815 m Hernani tunnel. Each tunnel is a dual-track tunnel, featuring a 95 sq m cross-section. Visit www.sener.es 25/08.Fulcrum will design the Hernani-Astigarraga section in Gipuzkoa province, including Tunnel 3.3, a 700 m 95 sq m single bored tunnel, and the 230 m 95 sq m single bore Loyola tunnel. The contract is worth EUR2.8 million. Visit www.fulcrum.es 25/08.Open invitation to tender, deadline 12.03.2009, for construction of 2,159 m section of high speed railway at Beasain entirely in tunnels and viaducts. Estimated value EUR40.8 million, duration 35 months. Specs and docs from Cianoplan, tel +34 944-231520, fax -316895. Tenders or requests to participate must be sent to Comision Central de Contratacion in Vitoria-Gasteiz, tel +34 94501-8931, fax -9018, www.contratacion.info Enquiries to Department of Transport and Public Works in Vitoria, tel +34 94501-8931, fax -9018. For full construction history of this project see tunnelbuilder archive es/100. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=034391-2009. 06/09.



Permalink

Award of contract to UTE Dragados-Iza Obras y Promociones-Obras Subterraneas-Campezo, value EUR38,434,711.81 excluding VAT, for construction of 2,159 m-long tunnelled section of high speed railway at Beasain. Duration 32 months. More from Ana Maria Alonso Ciriano at OPT in Vitoria-Gasteiz, tel +34 945019-752, fax -018, e-mail am-aciriano@ej-gv.es. 32/09.



Permalink

Prior information of expected start of award procedures on 03.05.2010 for construction of 2.493 km-long Ezkio/Itsaso-Beasain section including two tunnels and one viaduct, value EUR52 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10474-2010. 02/10.Prior information of expected start of award procedures on 03.05.2010 for construction of 3.835 km-long Tolosa-Hernialde section including three tunnels, two false tunnels and four viaducts, value EUR85 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10475-2010. 02/10.Prior information of expected start of award procedures on 04.07.2010 for construction of 5.25 km-long Urneita-Hernani section including two tunnels and two viaducts, value EUR105 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10477-2010. 02/10.Prior information of expected start of award procedures on 04.07.2010 for construction of 2.78 km-long Andoain-Urnieta section including one tunnel and two viaducts, value EUR64 million, excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=10479-2010. 02/10.More on these four impending bids from Inaki Amondarain at Department for Public Works and Transport in Vitoria-Gasteiz, tel +34 9450197-54, fax -42, e-mail respcontract-trans@ej-gv.es. For history of this project since March, 2003 visit tunnelbuilder archive es/100. 03/10.



Permalink

Open invitation to tender, deadline 08.07.2010, for construction of 2.493 km-long Ezkio/Itsaso-Beasain section including two tunnels and one viaduct. Contract value EUR52 million excluding VAT, duration 32 months. Offers to Central de contratacion, Direccion de Patrimonio y Contratacion, Gobierno Vasco, Vitoria-Gasteiz, tel +34 945019-572730, fax -018, e-mail am-aciriano@ej-gv.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=160988-2010. 23/10.



Permalink

Open invitation to tender, deadline 08.09.2010, for construction of 3.835 km-long Tolosa-Hernialde section including three tunnels, two false tunnels and four viaducts. Contract duration 31 months, estimated value EUR95,321,241. More from Eugenia Ugartondo Segura at Department for Public Works and Transport in Vitoria-Gasteiz, tel +34 94501-8931, fax -9018, e-mail e-ugartondo@ej-gv.es, to whom tenders or requests to participate must be sent. Time limit for requests to access documents 07.09.2010 at 14.00h. Specs and docs from Copisteria Cianoplan in Bilbao, tel +34 944-231520, fax -316895, website www.contratacion.info. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216988-2010. 30/10.



Permalink

Open invitation to tender, deadline 30.09.2010, for track construction works on 2.78 km-long Andoain-Urnieta section including one tunnel and two viaducts. More information from Gobierno Vasco in Vitoria Gasteiz, tel +34 9450189-31, fax -50, e-mail ab-perez@ej-gv.es to whom tenders or requests to participate should be sent. Specs and docs from Copisteria Cianoplan in Bilbao, tel +34 944231520, fax +34 944316895, website www.contratacion.info. Time limit for accessing documents 29.09.2010. Contract value EUR67,859,964 excluding VAT, duration 34 months. For project history visit tunnelbuilder archive es/100. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=257360-2010. 35/10.



Permalink

Contract, value EUR48,659,842 excluding VAT, for construction of 2.493 km-long Ezkio/Itsaso-Beasain section with two tunnels and a viaduct awarded to UTE Ortiz Construcciones y Proyectos SA/Construcciones Murias SA/Excavaciones Viuda de Sainz SA. Contract duration 32 months. For seven-year project history visit tunnelbuilder archive es/100. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358119-2010. 49/10.



Permalink

Contract, value EUR88,753,608 excluding VAT, for construction of 3.835 km-long Tolosa-Hernialde section with three tunnels, two false tunnels and four viaducts awarded to UTE Corsan-Corviam Construccion SA/Geotunel SL. Contract duration 31 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358122-2010. 49/10.



Permalink

Contract award to UTE Ferrovial Agroman/Construcciones Amenabar, value EUR64,127,666 excluding VAT, for track construction works on 2.78 km-long Andoain-Urnieta section including one tunnel and two viaducts. More information from Gobierno Vasco in Vitoria Gasteiz, tel +34 9450189-31, fax -50, e-mail ab-perez@ej-gv.es, website www.contratacion.info. Contract duration 34 months. For extensive project history visit tunnelbuilder archive es/100. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=012420-2011. 03/11.



Permalink


Open call for bids, deadline 06.11.2015, for the design of civil protection and safety installations in the Vitoria-Bilbao section of tunnels on the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 12 months from the award. Value of the contract is about EUR708,525.00 excluding VAT. Contact Adif, Madrid, tel  +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es.Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=327220-2015. Ref. n. 3.15/20830.0113 (P007/15). 39/15.




Permalink


The joint venture TRN Ingenieria y Planificacion de Infraestructuras and Sistemas Globales de Infraestructuras de Transporte secured the EUR279 867,57 contract, excluding VAT, for the design of civil protection and safety installations in the Vitoria-Bilbao section of tunnels on the Vitoria-Bilbao-San Sebastian high speed line. Fpr further information please contact Adif, Madrid, tel  +34 917744804, fax +34 917745814, e-mail pmardaiz@adif.es.Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=55393-2016. Ref. n. 3.15/20830.0113 (P007/15). 08/16.




Permalink

Prior information notice without call for competition for the project to build new emergency exits in the tunnels on the Bergara-Astigarraga section, on the Vitoria-Bilbao-San Sebastian high speed line. The 58.67km section includes 18 cut&cover tunnels and the 23 rock tunnels Kortatxo – Sakon (3706 m) with safety tunnel (2.720 m), Zumarraga (5455 m), Atsusain (555 m), Sorozarreta (1730 m), Arriaran (479 m), Itola (219 m), Loinaz (370 m), Beasain Este (1967 m), Ordizia Itsasondo (2832 m), Legorreta (2941 m), n.1 (1518 m), n.2 (1455 m), Aldaba Txiki (687 m), Auzo Txikia (210 m), Montezkue (1544 m), Anoeta (1372 m), Asteasu (2576 m), Zizurkil (845 m), Aduna (4718 m), Andoain (1939 m), Urnieta (2157 m), Hernani (770 m).  Duration of the contract is 18 months from the award. Value of the contract is about EUR11.7 million, excluding VAT. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=143369-2017. 17/17.



Permalink

Open call for bids, deadline 16.04.2018, to build new safety tunnels for the Induspe (2205 m), Udalaitz-1 (3157 m), Mendigain (1035 m), Olabarrie (1078 m), Ganzelai (1381 m), Galdaakao (1789 m) and Zaratamo (2709 m) tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 18 months from the award.

Value of the contract is about EUR29.83 million, excluding VAT. For bid documents http://www.adifaltavelocidad.es/es_ES/empresas_servicios/licitaciones/licitaciones_en_curso.shtml.

Contact Adif, Madrid, tel  +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es.Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=088926-2018.

Ref. n. 3.18/20830.0008 (ON 002/18). 11/18.



Permalink

The contract of the open call for bids to build new safety tunnels for the Induspe (2205 m), Udalaitz-1 (3157 m), Mendigain (1035 m), Olabarrie (1078 m), Ganzelai (1381 m), Galdaakao (1789 m) and Zaratamo (2709 m) tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line, was not awarded. Contact Adif, Madrid, tel  +34 917744804, fax +34 917674490, email mjmoro@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=234702-2018.

Ref. n. 3.18/20830.0008 (ON 002/18). 25/18.



Permalink

Prior information notice without call for competition for the design of the new safety exits in tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Value of the contract EUR743.801,65, excluding VAT. Duration of the contract is 24 months from the award. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=188932-2018.

25/18.



Permalink

Open invitation to tender, deadline 31.01.2019, to build new emergency exits in the tunnels on the Bergara-Astigarraga section, on the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 21 months from the award. Value of the contract is about EUR15,9 million, excluding VAT. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=547310-2018

and

https://apps.euskadi.eus/w32-1084/es/contenidos/anuncio_contratacion/expjaso16048/es_doc/es_arch_expjaso16048.html?ruta=/w32-1084/es/v79aWar/comunJSP/v79aSubmitBuscarAnuncioFiltro.do?estado=AL&origenSubHome=busquedaPersonalizada.

Ref.n. P20018381. 02/19.



Permalink

Open invitation to tender, deadline, 25.02.2019, for support service to the works management during construction of the new emergency exits in the tunnels of  the Vitoria-Bilbao-San Sebastian high speed line. Duration of the contract is 23 months from the award. Value of the contract is about EUR1.078 million, excluding VAT. For bid documents http://www.contratacion.euskadi.eus/ where offers must be sent. Contact Euskal Trenbide Sarea (ETS), att.ne Matxalen Elordi, Bilbao, tel +34 946572600, fax +34 946572601, email ets@ets-rfv.eus. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=021761-2019.

Ref. n. P20018528. 03/19.



Permalink

Open invitation to tender, deadline 15.02.2019, for the construction of the new safety exits in tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Value of the contract is EUR32.56 million, excluding VAT. The duration of the contract is 27 months from the award. For bid documents http://www.adif.es/AdifWeb/licitaciones/listadoLicitaciones.jsp?TIPO_BUSQUEDA=EN_CURSO&i=es_ES where offers must be sent. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email pmardaiz@adif.es. Visit

http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=025048-2019.

Ref.n. 3.18/20830.0410 - ON 044/18. 03/19.




Permalink

Icyfsa Ingenieria from Tres Cantos (Madrid) secured the EUR300,000 contract, excluding VAT, for consulting services, technical support and monitoring of tunnel construction on the Madrid- Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian High Speed Railway, Nudo Mondragon-Elorrio-Bergar section. Contact Ineco, Madrid, tel  +34 914526767, email elh@ineco.com. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=043804-2018.

Ref.n.20180612-00416. 06/19.




Permalink

Periodic indicative notice without call for competition for the construction of the new safety exits for tunnels on the Vitoria-Bilbao-San Sebastian high speed line, Vitoria-Bilbao section. The value of the contract is EUR32.56 million, excluding VAT. The duration of the contract is 27 months. Contact Adif-Alta Velocidad, Madrid, email gestionadministrativaAV@adif.es.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108681-2019.

11/19.



Permalink

Periodic indicative notice without call for competition for general management during the construction of the new safety exits for tunnels on the Vitoria-Bilbao-San Sebastian high speed line, Vitoria-Bilbao section.

Value of the contract is EUR2 million, excluding VAT. Contact Adif-Alta Velocidad, Madrid, email gestionadministrativaAV@adif.es.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104203-2019.

11/19.



Permalink

Open invitation to tender, deadline, 25.04.2019, for consultancy services and technical assistance for the works management during construction of the new emergency exits in the tunnels of  the Vitoria-Bilbao-San Sebastian high speed line, Vitoria-Bilbao section. Value of the contract is EUR2 million, excluding VAT and the duration of the contract is 30 months. For bid documents http://www.adif.es/AdifWeb/licitaciones/listadoLicitaciones.jsp?TIPO_BUSQUEDA=EN_CURSO&i=es_ES.

Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123275-2019.

Ref. n. 3.19/20830.0026 (CON 006/19). 14/19.



Permalink

The JV Esteyco SA (60 %)/Team Ingenieria y Consultoria SL (40 %) from Madrid secured the EUR 1,197,796.92 contract, excluding VAT, for consulting and technical assistance for the general management  during the construction of new emergency exits in tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, section Vitoria-Bilbao.  Contact Adif-Alta Velocidad, Madrid, tel +34 917744804,  email contrataciondcc@adif.es. For bid/tender documents click here.


Ref.n. 3.19/20830.0026- CON 006/19. 42/19.



Permalink

Obras Subterraneas SA (OSSA) from Madrid secured the EUR 25.22 million contract, excluding VAT, for the construction of the new safety exits in tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high speed line. Contact Adif-Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email pmardaiz@adif.es. For bid/tender documents click here.


Ref.n. 3.18/20830.0410 - ON 044/18. 42/19.



Permalink

Open invitation to tender, deadline 26/12/2019, for consulting and technical assistance services for the construction design of civil protection and safety facilities in the tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, Vitoria-Bilbao section. Value of the contract is  EUR 484 235.56,  excluding VAT. Duration of the contract is 10 months. For tender documents please click here and here.

Tenders must be sent to https://elicitadores.ADIF-AV.es. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Ref. n. CON 034/19- 3.19/30830.0281. 48/19.



Permalink


The JV Ayesa Ingenieria y Arquitectura SAU (60 %)/Geoconsult Espana Ingenieros Consultores SAU (40 %) secured the EUR348,649.60 contract,  excluding VAT, for consulting and technical assistance services for the construction design of civil protection and safety facilities in the tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, Vitoria-Bilbao section. For tender documents please click here. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Ref. n. CON 034/19- 3.19/30830.0281. 03/21. 

 




Permalink

Periodic indicative notice for construction of new safety  exits in the tunnels of the Vitoria-Bilbao-San Sebastian/Donostia high-speed line, Vitoria-Bilbao section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR 25.2 million, excluding VAT. Duration of the contract will be 22 months. Estimated date of publication of contract notice: 31/12/2022. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123083-2022. 13/22.  

  



Permalink


Periodic indicative notice for construction of new safety exits in the tunnels of the Vitoria-Bilbao-San Sebastian/Donostia high-speed line, Vitoria-Bilbao section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR25.2 million, excluding VAT. Duration of the contract will be 22 months. Estimated date of publication of contract notice: 31/12/2022. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123083-2022. 13/22. 

Spain-Madrid: Railway construction works

2022/S 047-123083

Periodic indicative notice – utilities

This notice aims at reducing time limits for receipt of tenders

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: ADIF-ALTA VELOCIDAD
National registration number: Q2802152E
Postal address: Avda. Pío XII, 110 – Caracola 16
Town: MADRID
NUTS code: ES300 Madrid
Postal code: 28036
Country: Spain
E-mail: contrataciondcc@adif.es
Telephone: +34 917744804
Fax: +34 917674490
Internet address(es):
Main address: www.adifaltavelocidad.es
Address of the buyer profile: http://www.adifaltavelocidad.es/es_ES/empresas_servicios/licitaciones/licitaciones.shtml
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

PROYECTO DE CONSTRUCCIÓN DE NUEVAS SALIDAS DE EMERGENCIA EN LOS TÚNELES DE LA LÍNEA DE ALTA VELOCIDAD VITORIA - BILBAO - SAN SEBASTIÁN. TRAMO: VITORIA - BILBAO

II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 25 200 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES España
II.2.6)Estimated value
Value excluding VAT: 25 200 000.00 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 22
II.3)Estimated date of publication of contract notice:
31/12/2022

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for the receipt of applications for an invitation to tender or to negotiate / Time limit for receipt of expressions of interest
IV.2.5)Scheduled date for start of award procedures:
31/12/2022

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
03/03/2022



Permalink


Periodic indicative notice for the civil protection and safety equipment in the tunnels of the Vitoria-Bilbao-San Sebastian/Donostia high-speed line, Vitoria-Bilbao section. Estimated date of publication of contract notice: 30/06/2023.Value of the contract is EUR 15 million, excluding VAT. Duration of the contract will be 12 months. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=156534-2023. 11/23. 

España-Madrid: Trabajos de construcción ferroviaria


2023/S 053-156534

Anuncio periódico indicativo – sectores especiales

El presente anuncio tiene por objeto reducir los plazos de recepción de ofertas

Obras

Base jurídica:
Directiva 2014/25/UE

Apartado I: Entidad adjudicadora

I.1)Nombre y direcciones
Nombre oficial: ADIF-ALTA VELOCIDAD
Número de identificación fiscal: Q2802152E
Dirección postal: Avda. Pío XII, 110 – Caracola 16
Localidad: MADRID
Código NUTS: ES300 Madrid
Código postal: 28036
País: España
Correo electrónico: contrataciondcc@adif.es
Teléfono: +34 917744804
Fax: +34 917674490
Direcciones de internet:
Dirección principal: www.adifaltavelocidad.es
Dirección del perfil de comprador: https://contrataciondelestado.es/wps/poc?uri=deeplink:perfilContratante&idBp=DUt%2BH4MbPkQQK2TEfXGy%2BA%3D%3
I.3)Comunicación
Puede obtenerse más información en la dirección mencionada arriba
Las ofertas o solicitudes de participación deben enviarse a la dirección mencionada arriba
I.6)Principal actividad
Servicios de transporte ferroviario

Apartado II: Objeto

II.1)Ámbito de la contratación
II.1.1)Denominación:


PROYECTO DE CONSTRUCCIÓN DE INSTALACIONES DE PROTECCIÓN CIVIL Y SEGURIDAD EN LOS TÚNELES DE LA LAV VELOCIDAD VITORIA-BILBAO-SAN SEBASTIÁN.TRAMO: VITORIA-BILBAO


II.1.2)Código CPV principal
45234100 Trabajos de construcción ferroviaria
II.1.3)Tipo de contrato
Obras
II.1.4)Breve descripción:


PROYECTO DE CONSTRUCCIÓN DE INSTALACIONES DE PROTECCIÓN CIVIL Y SEGURIDAD EN LOS TÚNELES DE LA LAV VELOCIDAD VITORIA-BILBAO-SAN SEBASTIÁN.TRAMO: VITORIA-BILBAO


II.1.5)Valor total estimado
Valor IVA excluido: 15 000 000.00 EUR
II.1.6)Información relativa a los lotes
El contrato está dividido en lotes: no
II.2)Descripción
II.2.2)Código(s) CPV adicional(es)
45222300 Trabajos de ingeniería para instalaciones de seguridad
45221240 Trabajos de construcción de túneles
II.2.3)Lugar de ejecución
Código NUTS: ES España
II.2.4)Descripción del contrato:


PROYECTO DE CONSTRUCCIÓN DE INSTALACIONES DE PROTECCIÓN CIVIL Y SEGURIDAD EN LOS TÚNELES DE LA LAV VELOCIDAD VITORIA-BILBAO-SAN SEBASTIÁN.TRAMO: VITORIA-BILBAO


II.2.5)Criterios de adjudicación
El precio no es el único criterio de adjudicación, y todos los criterios figuran únicamente en los pliegos de la contratación
II.2.6)Valor estimado
Valor IVA excluido: 15 000 000.00 EUR
II.2.7)Duración del contrato, acuerdo marco o sistema dinámico de adquisición
Duración en meses: 12
II.2.10)Información sobre las variantes
II.2.11)Información sobre las opciones
II.2.13)Información sobre fondos de la Unión Europea
El contrato se refiere a un proyecto o programa financiado con fondos de la Unión Europea: sí
Identificación del proyecto:


Podrá ser cofinanciado por el Plan de Recuperación, Transformación y Resiliencia - Financiado por la Unión Europea – NextGenerationEU


II.2.14)Información adicional
II.3)Fecha estimada de publicación del anuncio de licitación:
30/06/2023

Apartado IV: Procedimiento

IV.1)Descripción
IV.1.3)Información sobre un acuerdo marco o un sistema dinámico de adquisición
IV.1.8)Información acerca del Acuerdo sobre Contratación Pública
El contrato está cubierto por el Acuerdo sobre Contratación Pública: sí
IV.2)Información administrativa
IV.2.2)Plazo para la presentación de solicitudes para una invitación a licitar o para negociar / Plazo para la recepción de manifestaciones de interés
IV.2.5)Fecha prevista para el inicio de los procedimientos de adjudicación:

Apartado VI: Información complementaria

VI.2)Información sobre flujos de trabajo electrónicos
Se aceptará la facturación electrónica
VI.3)Información adicional:
VI.4)Procedimientos de recurso
VI.4.1)Órgano competente para los procedimientos de recurso
Nombre oficial: Tribunal Administrativo Central de Recursos Contractuales (TACRC)
Dirección postal: Avda General Perón nº 38 - 8ª Planta
Localidad: Madrid
Código postal: 28071
País: España
Correo electrónico: tribunal_recursos.contratos@hacienda.gob.es
Fax: +34 913491319
VI.4.2)Órgano competente para los procedimientos de mediación
Nombre oficial: ÓRGANO DE CONTRATACIÓN DE ADIF
Dirección postal: Avda. Pío XII, 110 – Caracola 16
Localidad: Madrid
Código postal: 28036
País: España
Fax: +34 917674490
VI.5)Fecha de envío del presente anuncio:
10/03/2023



Permalink

Prior information notice for civil protection and safety installations in the tunnels Vitoria/Gasteiz-Bilbao-Donostia/San Sebastian High Speed Railway, Mondragon-Elorrio-Bergar section. Contact Adif-Alta Velocidad, Madrid, tel +34917744804, email comprasycontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/101260-2024. 16/24. 



Permalink