Periodic indicative notice for construction of new safety exits in the tunnels of the Vitoria-Bilbao-San Sebastian/Donostia high-speed line, Vitoria-Bilbao section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR25.2 million, excluding VAT. Duration of the contract will be 22 months. Estimated date of publication of contract notice: 31/12/2022. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123083-2022. 13/22.
Spain-Madrid: Railway construction works
Periodic indicative notice – utilities
This notice aims at reducing time limits for receipt of tenders
Legal Basis:
Directive 2014/25/EU
Section I: Contracting entity
I.6)Main activity
Railway services
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
PROYECTO DE CONSTRUCCIÓN DE NUEVAS SALIDAS DE EMERGENCIA EN LOS TÚNELES DE LA LÍNEA DE ALTA VELOCIDAD VITORIA - BILBAO - SAN SEBASTIÁN. TRAMO: VITORIA - BILBAO
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 25 200 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES España
II.2.6)Estimated value
Value excluding VAT: 25 200 000.00 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 22
II.3)Estimated date of publication of contract notice:
31/12/2022
Section IV: Procedure
IV.2)Administrative information
IV.2.2)Time limit for the receipt of applications for an invitation to tender or to negotiate / Time limit for receipt of expressions of interest
IV.2.5)Scheduled date for start of award procedures:
31/12/2022
Section VI: Complementary information
VI.5)Date of dispatch of this notice:
03/03/2022