Prior information notice without call for competition for the project to build new emergency exits in the tunnels on the Bergara-Astigarraga section, on the Vitoria-Bilbao-San Sebastian high speed line. The 58.67km section includes 18 cut&cover tunnels and the 23 rock tunnels Kortatxo – Sakon (3706 m) with safety tunnel (2.720 m), Zumarraga (5455 m), Atsusain (555 m), Sorozarreta (1730 m), Arriaran (479 m), Itola (219 m), Loinaz (370 m), Beasain Este (1967 m), Ordizia Itsasondo (2832 m), Legorreta (2941 m), n.1 (1518 m), n.2 (1455 m), Aldaba Txiki (687 m), Auzo Txikia (210 m), Montezkue (1544 m), Anoeta (1372 m), Asteasu (2576 m), Zizurkil (845 m), Aduna (4718 m), Andoain (1939 m), Urnieta (2157 m), Hernani (770 m). Duration of the contract is 18 months from the award. Value of the contract is about EUR11.7 million, excluding VAT. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=143369-2017. 17/17.