The contract of the open call for bids to build new safety
tunnels for the Induspe (2205 m), Udalaitz-1 (3157 m), Mendigain (1035 m),
Olabarrie (1078 m), Ganzelai (1381 m), Galdaakao (1789 m) and Zaratamo (2709 m)
tunnels in the Vitoria-Bilbao section, of the Vitoria-Bilbao-San Sebastian high
speed line, was not awarded. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email mjmoro@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=234702-2018.
Ref. n. 3.18/20830.0008 (ON 002/18). 25/18.