The JV Ayesa Ingenieria y Arquitectura SAU (60 %)/Geoconsult Espana Ingenieros Consultores SAU (40 %) secured the EUR348,649.60 contract, excluding VAT, for consulting and technical assistance services for the construction design of civil protection and safety facilities in the tunnels of the Vitoria-Bilbao-San Sebastian high-speed line, Vitoria-Bilbao section. For tender documents please click here. Contact Adif - Alta Velocidad, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. Ref. n. CON 034/19- 3.19/30830.0281. 03/21.