Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Switzerland

Switzerland, Gotthard - ch/17

High Speed Railway

BASF MEYCO Fireshield 1350 fire protection mortar was used on this project   Sinking of 800 m-deep Sedrun shaft commenced February, 1999 by jv of Murer, Shaft Sinkers, Locher, Marti, Zschokke and CSC. April 1999.   Tenders invited for 2,646 m-long Faido access tunnel at Mairengo and Amsteg access tunnel. Also Bodio service tunnel 3,162 m-long and 5 m-diameter with two cut-and-cover tunnels at 380 m each. May 1999.   North portal to Sedrun is 21 km; Sedrun to Faido is 19 km; Faido to south portal is 16 km. Sedrun and Faido are construction accesses and will be retained as emergency exits during operation of the railway. At Sedrun there will be two crossovers together with passenger unloading facilities in separately-ventilated galleries to be excavated off-line. Amsteg access is for construction and maintenance purposes only. At this stage it is anticipated that the Sedrun section will be advanced by drill/blast on four faces off the shaft starting February, 2000. Two TBMs will drive from the north portal position towards Sedrun and another two TBMs will drive from the south portal; two TBMs will drive south from Amsteg commencing early-2002 and another TBM will drive from Bodio following on 400 m of preparatory cut-and-cover in blocky alluvial ground and 420 m drill/blast with grouting; two TBMs will drive north from Faido starting end-2002; and the final launch should be from Erstfeld in mid-2003. The south end of the tunnels will be segmentally or concrete lined, and elsewhere shotcrete, waterprooof membrane and in-situ concrete will be standard. The invert will be concreted in-situ throughout. Rock temperature will be 45 degrees C, provoking maximum air temperature of 35 degrees C and humidity of 70 %. Working temperature will be reduced by circulating cooling water to the faces from refrigeration plants on surface. Sedrun already has a 10 MW plant. Project has been divided into five main contract lots. Each of the three central lots will employ 500 men; the south lot 400 men; and the north lot 300 men. See also ch/20 – 22 below. October 1999. Shaft Sinkers of South Africa reported completion of a 800-metre vertical shaft at Sedrun. The contract also included a ventilation shaft and a cavern more than 2,000 metres below the surface. A new phase in the construction of the world's longest railway tunnel is about to begin now with the drill-and-blast of two pairs of tunnels from the cavern in both directions between the middle of next year to the end of 2007. Visit www.alptransit.ch 42/01. Click ch/19 and ch/22 To complete the first stage of AlpTransit and finance the second stage, further investment will be necessary for a total of CHF600 to 800 million. The Swiss Parliament has to approve the new funding next summer. The cost estimate for the first stage of AlpTransit - which includes a first phase with the Lötschberg and Gotthard base tunnels and a second phase with the Mount Ceneri and Zimmerberg tunnels - is CHF14.7 billion. However, unforeseen geological conditions in Faido at the Gotthard base tunnel and the decision to build a twin tube instead of a bidirectional tunnel under Mount Ceneri or safety improvements in the tunnels will cost an extra CHF520 million. Consequently, reserves dropped to CHF249 million as of 31st December, 2002. Another CHF50 million will also be submitted in Parliament for the second stage, which includes the underground crossing of the Uri valley. This stage, programmed for the 2010-2020 decade, will consist in lengthening the Gotthard base tunnel so that the line will run in tunnel on 75 km instead of 57, from Brunnen to Bodio. A final decision will be made in 2007. The Lötschberg base tunnel is 75% complete while the Gotthard base tunnel is 20% complete. Visit www.alptransit.ch and www.blsalptransit.ch 15/03.Following an out-of-court agreement between the project owner AlpTransit Gotthard and Schweizer Bahntechnik Konsortium and once the contract is signed, which is scheduled for spring 2008, Transtec Gotthard will draw up the implementation plans to begin installing railway technology in the Gotthard base tunnel in 2009. On 4th May, 2007, Transtec Gotthard was awarded the contract for railway technology but the decision was attacked in justice by the defeated consortium Schweizer Bahntechnik. Read E-News Weekly 24/2007. The order is worth CHF1.69 billion and construction is scheduled to last until 2016. Zurich-based Atel Installationstechnik leads the Transtec Gotthard consortium, whose other members are Alcatel-Lucent, Thales Rail Signalling Solutions (TRSS), Alpine Mayreder and Balfour Beatty Rail. Visit www.transtecgotthard.ch, www.atel.eu, www.thalesgroup.com, www.alpine.at and www.bbrail.comTranstec Gotthard is also aided by a number of other partners, among which Kummler+Matter, Pöyry Infra and Scheuchzer. Visit www.kuma.ch, www.ewi.ch or www.poyry.com and www.scheuchzer.chOnce the federal office of transport has granted its approval, work on installation of the railway technology systems is scheduled to begin at the south portal in Biasca around the beginning of 2009, and at the north portal in Erstfeld around 2012. The construction period is around seven years. The Gotthard base tunnel is scheduled to go into commercial operation in 2017. The work covers installation of railway technology facilities in the two one-track tunnel tubes, each 57 kilometres in length, and the outdoor routes connecting the existing rail network. The railway technology to be installed includes the track, power supply and cabling, lighting and power installations, overhead lines and switching stations, tunnel instrumentation and controls, data networks and operational communications, tunnel communication systems and signal boxes, process control systems and a new signalling and train security system.Before these systems can be installed in the tunnel, extensive systems for logistics and transport such as construction railway, workshops, storage depots, accommodation, ventilation and air conditioning systems, power supply, radio and telephone systems need to temporarily set up. Visit www.alptransit.ch 03/08.Pöyry has been awarded an engineering services contract in the Gotthard base tunnel project by the Swiss Transtec Gotthard consortium. The assignment comprises support of the operational management, technical coordination and planning integration. The value of the contract is about EUR10 million. AlpTransit Gotthard as owner awarded the Transtec Gotthard consortium the work contract for the installation of the railway technology in the Gotthard base tunnel. Transtec Gotthard comprises Atel Installationstechnik, Alcatel-Lucent Schweiz, TRSS Thales Rail Signalling Solutions, Alpine Bau and Balfour Beatty Rail. The consortium's contract is for implementation planning and installation of the railway installations and involves equipping the two single-track tunnels, each with a length of 57 km, as well as the overground lines to the north and south with a total length of around 11 km. Installation of the railway systems through the south entrance will start in the second half of 2009, and through the north entrance at Erstfeld at the end of 2011. Commercial operation of the world's longest railway tunnel with scheduled train services is planned to start at the end of 2017. Visit www.poyry.com, www.transtec-gotthard.ch and www.neat.ch/pages/e/index.php 20/08.



Permalink

The JV TLT-Turbo/ABB, secured the EUR31 million ventilation contract lot C in Gotthard Base Tunnel. The contract includes the design and the development of operational ventilation as well as its realization and installation in Sedrun and Faido multifunction stations. Duration of work: mid-2012 to spring 2014. Visit www.alptransit.ch. 18/11.



Permalink

The consortium ETG (Implenia/Alpiq Infra AG) secured the EUR37.44 million contract (lot E) to equip multifunction stations Sedrun and Faido, ventilation stations and railway engineering buildings. The one-year contract includes project design, development, manufacture, installation and commissioning of mechanical and electromechanical equipment. Visit  http://www.alptransit.ch/it/stampa/comunicati-stampa/werkvertrag-fuer-ausruestung-der-multifunktionsstellen-sedrun-und-faido-unterzeichnet-783.html?cHash=ab265fd6896657eb554981ac9712ec87. 17/12.



Permalink

Open invitation to tender, deadline 12.11.2012, for delivery and installation of MT cables in Gotthard Base Tunnel. Bid is in two lots. Contact Achats du groupe prestations de services du groupe achats de biens de consummation, Bern. For more http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=748603. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=

312972-2012
. 41/12.



Permalink

Nexans Suisse SA of Cortaillod secured the EUR4.18 million contract (lot 1) and the EUR3.7 million contract (lot 2) for delivery and installation of MT cables in Gotthard Base Tunnel. Contact Achats du groupe prestations de services du groupe achats de biens de consummation, Bern. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=030415-2013 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=030416-2013. 05/13.



Permalink

The joint venture EB-GBT, composed of Bruegger HTB GmbH from Frutigen and Implenia from Zurich, secured the EUR3.09 million contract, including 8% VAT, for the cleaning work in the Gotthard Base tunnel, the underground access tunnels and secondary buildings. The duration of the works is from 01.10.2017 to 31.12.2022. Contact SBB, Berna, email einkauf.dienstleistungen@sbb.ch.  Visit http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=982485 and http://www.rsi.ch/news/ticino-e-grigioni-e-insubria/Ecco-chi-pulir%C3%A0-Alptransit-9492637.html. 35/17.



Permalink


Open invitation to tender, deadline 09/11/2022, for the supply of maintenance and troubleshooting on the jet fans in the Gotthard Base Tunnel (GBT) and Ceneri Base Tunnel (CBT), each fan must be dismantled and replaced with a functioning fan. A logistical concept is required for dismantling and assembly in the tunnel, which makes it possible to load the fans onto the maintenance train and transport them from the maintenance and intervention center (EIZ) into the tunnel, exchange them, bring them back to the EIZ and for inspection or repair unload.

For further information please click here (German) and/or here (Italian). The duration of the contract is from 01/04/2023 to 31/03/2028.  Contact Schweizerische Bundesbahnen SBB, attn Hans-Peter Luethi, Berna, email hans-peter.luethi2@sbb.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=522519-2022. Ref. n. 220002. 39/22. 

 

Switzerland-Berne: Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment


2022/S 184-522519

Contract notice – utilities

Supplies

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Schweizerische Bundesbahnen SBB Division Produktion Personenverkehr PP-F-EK-PTF
Postal address: Wylerstrasse 123/125
Town: Bern 65
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 3000
Country: Switzerland
Contact person: Hans-Peter Lüthi
E-mail: hans-peter.luethi2@sbb.ch
Internet address(es):
Main address: https://www.simap.ch
Address of the buyer profile: www.sbb.ch
I.3)Communication
Access to the procurement documents is restricted. Further information can be obtained at: http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1280437
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the following address:
Official name: Schweizerische Bundesbahnen SBB Division Produktion Personenverkehr PP-F-EK-PTF Vermerk: "Erhaltungsmittel Strahlventilatoren GBT & CBT" und "NICHT ÖFFNEN"
Postal address: Wylerstrasse 123/125
Town: Bern 65
Postal code: 3000
Country: Switzerland
Contact person: Hans-Peter Lüthi
E-mail: hans-peter.luethi2@sbb.ch
NUTS code: CH0 Schweiz / Suisse / Svizzera
Internet address(es):
Main address: https://www.simap.ch
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Erhaltungsmittel Strahlventilatoren GBT & CBT


II.1.2)Main CPV code
34630000 Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
II.1.3)Type of contract
Supplies
II.1.4)Short description:


Um Instandhaltungen und Störungsbehebungen an den Strahlventilatoren im Gotthard-Basistunnel (GBT) und Ceneri-Basistunnel (CBT) durchführen zu können, muss jeder Ventilator demontiert und durch einen funktionierenden Ventilator ersetzt werden können. Für die De- und Montage im Tunnel ist ein logistisches Konzept erforderlich, das es ermöglicht, die Ventilatoren auf den Erhaltungszug zu verladen und vom Erhaltungs- und Interventionszentrum (EIZ) in den Tunnel zu transportieren, auszutauschen, zum EIZ zurückzubringen und zur Revision oder Reparatur abzuladen.


II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: CH0 Schweiz / Suisse / Svizzera
Main site or place of performance:


Siehe Ausschreibungsunterlagen


II.2.4)Description of the procurement:


Um Instandhaltungen und Störungsbehebungen an den Strahlventilatoren im Gotthard-Basistunnel (GBT) und Ceneri-Basistunnel (CBT) durchführen zu können, muss jeder Ventilator demontiert und durch einen funktionierenden Ventilator ersetzt werden können. Für die De- und Montage im Tunnel ist ein logistisches Konzept erforderlich, das es ermöglicht, die Ventilatoren auf den Erhaltungszug zu verladen und vom Erhaltungs- und Interventionszentrum (EIZ) in den Tunnel zu transportieren, auszutauschen, zum EIZ zurückzubringen und zur Revision oder Reparatur abzuladen.


II.2.5)Award criteria
Criteria below
Cost criterion - Name: 1. WIRTSCHAFTLICHKEIT / Weighting: 45%
Cost criterion - Name: 1.1 Preisdifferenz Investitionskosten zu den konkurrierenden Angeboten / Weighting: 88% von 45%
Cost criterion - Name: 1.2 Preisdifferenz Betriebskosten zu den konkurrierenden Angeboten / Weighting: 12% von 45%
Cost criterion - Name: 2. GESAMTKONZEPT / Weighting: 40%
Cost criterion - Name: 2.1 Anforderungskatalog / Weighting: 50% von 40%
Cost criterion - Name: 2.2 Realisierung des Projektes & Qualitätsmanagement / Weighting: 30% von 40%
Cost criterion - Name: 2.3 Wandhalterungen / Feinjustierungswagen / Weighting: 20% von 40%
Cost criterion - Name: 3. UMWELT / Weighting: 10%
Cost criterion - Name: 3.1 Eco Vadis / Weighting: 50% von 10%
Cost criterion - Name: 3.2 Allgemeiner Umgang mit Umweltthemen / Weighting: 50% von 10%
Cost criterion - Name: 4. AKZEPTANZ VERTRAGSVORLAGE / Weighting: 5%
Cost criterion - Name: 4.1 Akzeptanz Vertragsvorlage / Weighting: 100% von 5%
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/04/2023
End: 31/03/2028
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:


Gemäss Preisblatt Teil 5 der Ausschreibungsunterlagen


II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.2)Economic and financial standing
List and brief description of selection criteria:


NACHWEIS ZU EIGNUNGSKRITERIUM 1.1


2 Referenzen der letzten 5 Jahre, die mit dem vorliegenden Auftrag hinsichtlich Komplexität (Technik, Dauer und Termineinhaltung etc.) vergleichbar sind. Die Projekte müssen in der Schweiz, EFTA Staaten, Vereinigtes Königreich oder EU-Länder im Bereich des Öffentlichen Verkehrs oder in der Schienenfahrzeugindustrie erbracht und erfolgreich abgeschlossen sein. Die SBB ist berechtigt, die ordnungsgemässe Erbringung der Leistungen zu überprüfen und entsprechende Auskünfte einzuholen.


NACHWEIS ZU EIGNUNGSKRITERIUM 2.1


(*) Nachweis eines unternehmensbezogenen Qualitätsmanagements (Zertifikat ISO 9001 oder gleichwertig) oder Beschreibung der Massnahmen des Unternehmens zur Gewährleistung der Qualität sowie der Untersuchungsmöglichkeiten und Projektentwicklungen des Unternehmens. (*) Bei fehlenden Qualitätszertifikaten kann ein Prozessaudit zur Eignungsprüfung durchgeführt werden. Dies gilt für den Anbieter sowie allfällige Sublieferanten


NACHWEIS ZU EIGNUNGSKRITERIUM 2.2


Angaben über die technische Leitung oder die technischen Stellen, unabhängig davon, ob diese dem Unternehmen angeschlossen sind oder nicht, zwar insbesondere über diejenigen, die mit der Qualitätskontrolle beauftragt sind. Bestätigung der notwendigen Fertigungskapazität.


NACHWEIS ZU EIGNUNGSKRITERIUM 2.3


Angaben über die technische Leitung oder die technischen Stellen, unabhängig davon, ob diese dem Unternehmen angeschlossen sind oder nicht, zwar insbesondere über diejenigen, die mit der Qualitätskontrolle beauftragt sind. Bestätigung der notwendigen Fertigungskapazität.


NACHWEIS ZU EIGNUNGSKRITERIUM 2.4


(*) Unternehmensstruktur Aktuelles Organigramm Aufbau und Organisation des Anbieters Standorte, Niederlassungen, Vertretungen oder Handelspartner in Europa


NACHWEIS ZU EIGNUNGSKRITERIUM 3.1


(*) Handelsregisterauszug oder Abschrift des Berufsregisters oder des Firmenbuches des Herkunftslandes des Anbieters


NACHWEIS ZU EIGNUNGSKRITERIUM 3.2


Erklärung bezüglich eines laufenden oder abgeschlossenen Insolvenzverfahrens oder eines vergleichbaren gesetzlich geregelten Verfahrens über das Vermögen der Unternehmung (ohne Betreibungsregisterauszug).


NACHWEIS ZU EIGNUNGSKRITERIUM 3.3


Erklärung über den Gesamtumsatz des Unternehmens sowie im Detail über den Umsatz im Bereich des Ausschreibungsgegenstandes, jeweils bezogen auf die der Ausschreibung vorangegangenen drei Jahren


NACHWEIS ZU EIGNUNGSKRITERIUM 3.4


Für die letzten drei Geschäftsjahre vor der Ausschreibung: Jahresrechnung bestehend aus Bilanz, Erfolgsrechnung, Anhang (Gliederung gemäss dem zweiunddreissigsten Titel des OR, insb. OR 958, 959a und 959b sowie 959c oder analog) sowie Mittelflussrechnung falls vorhanden inkl. letzter Prüfungsbericht der Revisionsstelle des anbietenden Unternehmens (nicht Mutterhaus).


NACHWEIS ZU EIGNUNGSKRITERIUM 3.5


Bankerklärung welche garantiert, dass im Falle einer Zuschlagserteilung die finanziellen Sicherheitsleistungen wie gemäss Publikation Ziffer 3.2 sowie gemäss Vertragsentwurf gefordert ausgestellt und dem Anbieter die entsprechenden Kredite gewährt werden.


NACHWEIS ZU EIGNUNGSKRITERIUM 3.6


Nachweis einer Betriebshaftpflichtversicherung (Höhe 20 Mio CHF für Sach- und Personalschäden)


NACHWEIS ZU EIGNUNGSKRITERIUM 4.1


(*) Erklärung des Anbieters für die Dauer der Vertragserfüllung, dass eine Vertretung in deutscher und französischer Sprache mit einer maximalen Reaktionszeit von 3 Arbeitstagen vor Ort zur Verfügung steht.



Permalink

Switzerland, Gorgier - ch/16

Highway

Twin tunnel to be bored by Marti jv using Herrenknecht ex Pomy. May 1998.  North tube breakthrough by Herrenknecht 11.7 m-diameter TBM achieved May, 1999 by contractors GTG, a jv of Marti, CSC, Comina and Pierre Freiburghaus. TBM dismantled and taken back to start for south tube to complete by October, 2000. Maximum daily advance 21.6 m with average of 13 m. Steelcord muck conveyor from TBM to portal with 400 m cassette. Korfmann fans and Grindex Matador pumps. Segment prefabrication at site produces six 1.8 m rings/day using forms supplied by Bernold and CBE. 28 cm-thick ring comprises 5 x 9 t segments plus key. Sept 1999.



Permalink

Switzerland, Ceneri - ch/14

High Speed Railway

Will drive 3.1 km over next three years to explore geological conditions for the 15 km Mt Ceneri base tunnel. Has advanced more than 2 km at 6 m/day. April 1999.   Mt Ceneri is on southern access to Gotthard base tunnel. Sigrino exploration drive underway on a 30 sq m single face to one side of the main tunnel alignment and should be completed end-2000. Contractor LGU using Tamrock drillrig for drill/blast with rockbolt support and steel arches in places. Main drive should start in 2005. Visit www.alptransit.ch April 2000.  Public hearings into the 2 x 15.4 km Ceneri base tunnel will be held from 2nd April to 16th May, 2003. The main worksite will start in Sigirino where a launch cavern for each tube is planned to start tunnelling. The full lengths of both tubes will be driven with two TBMs except a section in the Valcolla area to be blasted. The alignment on the north side bifurcates from the Bellinzona-Locarno line shortly after the Giubiasco station to enter in tunnel in Vigana between Camorino and San Antonino. On the south side, connection to the existing line will be in Vezia. Around 4 millions cubic metres of spoil will be removed and recycled. The CHF2.2 billion tunnel is part of the second phase of AlpTransit. Work to commence in 2006 for opening in 2016. Visit www.alptransit.ch 14/03.CHF1.3 billion has been allocated to the 15.4 km Ceneri base tunnel, which will be constructed as two single-track tubes, fully equipped. A scheduled building in phases has been discarted because, although this would have saved CHF155 million in the short term, extra costs of CHF334 million would have been necessary later to equip the second tube. Also, a building in phases would have reduced the capacity of the tunnel by 60%. The federal department for environment, transport, energy and communication (DETEC) is expected to approve the designs in mid August. Preliminary works could start next fall and the main works in 2006-2007. The Ceneri tunnel is part of the Gotthard AlpTransit line, since its approval at a referendum vote in 1992 confirmed in 1998. The cost is estimated at CHF2 billion (1998 price). Visit www.bav.admin.ch and www.alptransit.ch/pages/img/aktuell/Info_Ceneri_f.pdf 26/05.On 30th April, 2007, AlpTransit San Gottardo and CMC (Consorzio Monte Ceneri), a consortium whose partners are Swiss contractors CSC, Frutiger, and Rothpletz, Lienhard + Cie, signed a contract for the first underground works at the Ceneri base tunnel. The contract is worth CHF85 million (VAT not included) and encompasses tunnelling of the Sigirino access adit and an operating cavern. The contract has been signed slightly less than one year after the first stone of the Ceneri tunnel was laid on 2nd June, 2006 and further to 12 months of preparatory work for the Ceneri base tunnel, at Camorino and Sigirino construction sites. Tunnelling will commence next autumn and will last a bit more than two years. The 15.4 km-long Ceneri base tunnel connects Camorino with Vezia and is one of the key links of the plain line. It is scheduled to open in 2019. Read E-News Weekly 18/2003. Visit www.alptransit.ch, www.csc-sa.ch, www.frutiger.ch and www.rothpletz.ch 19/07.The contract for the construction of the Ceneri base tunnel from the northern portal, in Camerino, has been awarded to the Matro sud consortium headed by Pizzarotti teaming up with Ennio Ferrari, LGV, Cossi Costruzioni and Rodio Geotechnik. The consortium presented an offer of CHF103 million for the main northern lot consisting of a tunnel that will emerge on the Vigana hill under highway A2 where a double portal for three tracks will be constructed (two tracks for the new Alptransit railroad and one for the Locarno-Lugano line). Construction is programmed to commence on 6th October, 2008. Visit www.pizzarotti.it, www.ennio-ferrari.ch, www.lgv-sa.ch, www.cossi.com and www.rodio.chThe project will take place in three phases. First, an approach trench will be built in the slope that, from the valley, will lead to the tunnel site. Then, once the portal area is ready, some 50 metres will be excavated in soft ground just under the A2. From that point, crews will cut the rock through Mount Ceneri on an overall length of about 700 metres consisting of two tubes and a cavern system. The three large caverns, with width up to 23 m and height of 14 m, will be excavated by traditional methods. They will accommodate tracks for the south-north line, the north-south line and the Vigana connection that will be the interchange between north-south high speed lines and the local traffic. Click here for more details. Excavation will take place in soft soil using jet grouting and in rock using explosives. The supports will mainly consist of anchoring bolts, shotcrete, welded mash and steel arches. The final lining will be an inner concrete ring. Visit www.alptransit.ch 29/08.



Permalink

The CPV consortium, formed by CSC SA (Lugano) and Pizzarotti SA (Bellinzona), signed the EUR43 million contract for the construction of Lot 854 at Vezia, the main lot of Ceneri Base Tunnel, including the south portal, 200 m of cut-and-cover tunnel, as well as drilling, blasting and lining both tunnels along a length of 300 m. Works at Vezia will continue until 2016. Commercial operation of the Ceneri Base Tunnel with scheduled train services is planned to start at the end of 2019. Of the total of 40.19 km of the Ceneri Base Tunnel, at the end of February 2010, 7,673 m, or 19.1%, had been excavated. Visit www.alptransit.ch, www.csc-sa.ch and www.pizzarotti.ch. 10/10.



Permalink

Open invitation to tender, deadline 03.09.2012, for counselling and assistance during security analysis for ventilation, smoke ventilation, safety exits and underground stations in the following railway tunnels: Gotthard base tunnel (ch/17) from 2014 to 2017, 800 hours; Ceneri Base Tunnel (ch/14) from 2012 to 2017, 850 hours; Loewenstrasse station and Weinberg tunnel (ch/37) on cross link in Zurich (DML) from 2013 to 2015, 350 hours; tunnel on CEVA line (ch/40) at Geneva from 2013 to 2017, 900 hours. For more, visit http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=741257. Contact BAV, Safety Dept, Berna, e-mail beschaffung@bav.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231258-2012. 30/12.



Permalink

On 14.03.2104 the Swiss Federal Administrative Court has partly upheld both of the appeals against the awards made by AlpTransit Gotthard Ltd of the railway systems lots "Railway Track & Logistics" and "Railway Systems & Overall Coordination". The contested awards have been annulled and returned to AlpTransit Gotthard Ltd for reconsideration. AlpTransit Gotthard Ltd will analyse these decisions and decide how it will proceed in the next few days. Visit http://www.alptransit.ch/en/media/press-releases/vergaben-bahntechnik-am-ceneri-basistunnel-bundesverwaltungsgericht-heisst-beschwerden-teilweise-gut-986.html?cHash=ba68fd7817d795d431f0a610d7dfea31. 14/14.



Permalink

The Swiss Federal Supreme Court has upheld two appeals against decisions of the Swiss Federal Administrative Court of March, 2014 in connection with the award of railway infrastructure systems for the Ceneri Base Tunnel. The judgements of the Federal Administrative Court have been annulled. The original decisions of AlpTransit Gotthard Ltd for the awards are confirmed: Railway Track & Logistics lot to the Mons Ceneris Consortium, under the lead management of Mancini&Marti AG, Bellinzona ; the Railway Systems & Overall Coordination lot to the CPC Consortium, under the lead management of Cablex AG, Berne.

The formerly planned date for opening the Ceneri Base Tunnel to commercial traffic along with the revised railway timetable in December, 2019 therefore remains the goal of AlpTransit Gotthard Ltd. Click ch/14 for tunnelbuilder archive. Visit http://www.alptransit.ch/en/media/press-releases/bahntechnik-am-ceneri-basistunnel-1019.html. 38/14.



Permalink

Open invitation to tender, deadline 14.09.2015, for supply, installation, operation and test of ventilation equipment in Ceneri basis Tunnel, lot 890 C. Duration of contract from 01.06.2016 to 31.08.2019. Contact AlpTransit Gotthard AG, Lucerne, tel +41 (0)41 226 06 97-00; specs and docs from Ingenieurgemeinschaft ITC (Itecsa – Toscano), attn Eng Davide Merlini, Lugano, e-mail davide.merlini@piniswiss.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=121227-2015, GU S 067. 25/15.



Permalink

Open invitation to tender, deadline 22.03.2019, for test drives to be done in Ceneri Base Tunnel. Duration of the contract is from 01.03.2020 to 31.08.2020. Further information from

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1061297 (german) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1062359

(french).Contact CFF Voyageurs P-OP-FSE-PTF-SEF, attn. Markus Roethlisberger, Bern, tel  +41 79 223 14 29,  email roethlisberger.markus@sbb.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=092004-2019.

09/19.



Permalink


Open invitation to tender, deadline 13/09/2021, for the general management for the Sigirino access adit. For tender documents click here (Italian) and/o here (French). Tenders must be sent to Ferrovie Federali svizzere FFS Infrastruttura, acquisti, supply chain e produzione,  attn Elisa Bartesaghi,  Bellinzona, email elisa.bartesaghi@sbb.ch. Duration of the contract is from from  17.01.2022 to  31.12.2024. Contact Infrastruttura - Progetti di ampliamento e rinnovo - Gestione progetti -Regione Sud, attn Cristian Reveruzzi , Bellinzona, email cristian.reveruzzi@sbb.ch . For further on the tender please click here30/21. 

 

 




Permalink


Open invitation to tender, deadline 09/11/2022, for the supply of maintenance and troubleshooting on the jet fans in the Gotthard Base Tunnel (GBT) and Ceneri Base Tunnel (CBT), each fan must be dismantled and replaced with a functioning fan. A logistical concept is required for dismantling and assembly in the tunnel, which makes it possible to load the fans onto the maintenance train and transport them from the maintenance and intervention center (EIZ) into the tunnel, exchange them, bring them back to the EIZ and for inspection or repair unload.

For further information please click here (German) and/or here (Italian). The duration of the contract is from 01/04/2023 to 31/03/2028.  Contact Schweizerische Bundesbahnen SBB, attn Hans-Peter Luethi, Berna, email hans-peter.luethi2@sbb.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=522519-2022. Ref. n. 220002. 39/22. 

 

Switzerland-Berne: Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment

2022/S 184-522519

Contract notice – utilities

Supplies

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Schweizerische Bundesbahnen SBB Division Produktion Personenverkehr PP-F-EK-PTF
Postal address: Wylerstrasse 123/125
Town: Bern 65
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 3000
Country: Switzerland
Contact person: Hans-Peter Lüthi
E-mail: hans-peter.luethi2@sbb.ch
Internet address(es):
Main address: https://www.simap.ch
Address of the buyer profile: www.sbb.ch
I.3)Communication
Access to the procurement documents is restricted. Further information can be obtained at: http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1280437
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted to the following address:
Official name: Schweizerische Bundesbahnen SBB Division Produktion Personenverkehr PP-F-EK-PTF Vermerk: "Erhaltungsmittel Strahlventilatoren GBT & CBT" und "NICHT ÖFFNEN"
Postal address: Wylerstrasse 123/125
Town: Bern 65
Postal code: 3000
Country: Switzerland
Contact person: Hans-Peter Lüthi
E-mail: hans-peter.luethi2@sbb.ch
NUTS code: CH0 Schweiz / Suisse / Svizzera
Internet address(es):
Main address: https://www.simap.ch
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Erhaltungsmittel Strahlventilatoren GBT & CBT

II.1.2)Main CPV code
34630000 Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
II.1.3)Type of contract
Supplies
II.1.4)Short description:

Um Instandhaltungen und Störungsbehebungen an den Strahlventilatoren im Gotthard-Basistunnel (GBT) und Ceneri-Basistunnel (CBT) durchführen zu können, muss jeder Ventilator demontiert und durch einen funktionierenden Ventilator ersetzt werden können. Für die De- und Montage im Tunnel ist ein logistisches Konzept erforderlich, das es ermöglicht, die Ventilatoren auf den Erhaltungszug zu verladen und vom Erhaltungs- und Interventionszentrum (EIZ) in den Tunnel zu transportieren, auszutauschen, zum EIZ zurückzubringen und zur Revision oder Reparatur abzuladen.

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: CH0 Schweiz / Suisse / Svizzera
Main site or place of performance:

Siehe Ausschreibungsunterlagen

II.2.4)Description of the procurement:

Um Instandhaltungen und Störungsbehebungen an den Strahlventilatoren im Gotthard-Basistunnel (GBT) und Ceneri-Basistunnel (CBT) durchführen zu können, muss jeder Ventilator demontiert und durch einen funktionierenden Ventilator ersetzt werden können. Für die De- und Montage im Tunnel ist ein logistisches Konzept erforderlich, das es ermöglicht, die Ventilatoren auf den Erhaltungszug zu verladen und vom Erhaltungs- und Interventionszentrum (EIZ) in den Tunnel zu transportieren, auszutauschen, zum EIZ zurückzubringen und zur Revision oder Reparatur abzuladen.

II.2.5)Award criteria
Criteria below
Cost criterion - Name: 1. WIRTSCHAFTLICHKEIT / Weighting: 45%
Cost criterion - Name: 1.1 Preisdifferenz Investitionskosten zu den konkurrierenden Angeboten / Weighting: 88% von 45%
Cost criterion - Name: 1.2 Preisdifferenz Betriebskosten zu den konkurrierenden Angeboten / Weighting: 12% von 45%
Cost criterion - Name: 2. GESAMTKONZEPT / Weighting: 40%
Cost criterion - Name: 2.1 Anforderungskatalog / Weighting: 50% von 40%
Cost criterion - Name: 2.2 Realisierung des Projektes & Qualitätsmanagement / Weighting: 30% von 40%
Cost criterion - Name: 2.3 Wandhalterungen / Feinjustierungswagen / Weighting: 20% von 40%
Cost criterion - Name: 3. UMWELT / Weighting: 10%
Cost criterion - Name: 3.1 Eco Vadis / Weighting: 50% von 10%
Cost criterion - Name: 3.2 Allgemeiner Umgang mit Umweltthemen / Weighting: 50% von 10%
Cost criterion - Name: 4. AKZEPTANZ VERTRAGSVORLAGE / Weighting: 5%
Cost criterion - Name: 4.1 Akzeptanz Vertragsvorlage / Weighting: 100% von 5%
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/04/2023
End: 31/03/2028
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:

Gemäss Preisblatt Teil 5 der Ausschreibungsunterlagen

II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.2)Economic and financial standing
List and brief description of selection criteria:

NACHWEIS ZU EIGNUNGSKRITERIUM 1.1

2 Referenzen der letzten 5 Jahre, die mit dem vorliegenden Auftrag hinsichtlich Komplexität (Technik, Dauer und Termineinhaltung etc.) vergleichbar sind. Die Projekte müssen in der Schweiz, EFTA Staaten, Vereinigtes Königreich oder EU-Länder im Bereich des Öffentlichen Verkehrs oder in der Schienenfahrzeugindustrie erbracht und erfolgreich abgeschlossen sein. Die SBB ist berechtigt, die ordnungsgemässe Erbringung der Leistungen zu überprüfen und entsprechende Auskünfte einzuholen.

NACHWEIS ZU EIGNUNGSKRITERIUM 2.1

(*) Nachweis eines unternehmensbezogenen Qualitätsmanagements (Zertifikat ISO 9001 oder gleichwertig) oder Beschreibung der Massnahmen des Unternehmens zur Gewährleistung der Qualität sowie der Untersuchungsmöglichkeiten und Projektentwicklungen des Unternehmens. (*) Bei fehlenden Qualitätszertifikaten kann ein Prozessaudit zur Eignungsprüfung durchgeführt werden. Dies gilt für den Anbieter sowie allfällige Sublieferanten

NACHWEIS ZU EIGNUNGSKRITERIUM 2.2

Angaben über die technische Leitung oder die technischen Stellen, unabhängig davon, ob diese dem Unternehmen angeschlossen sind oder nicht, zwar insbesondere über diejenigen, die mit der Qualitätskontrolle beauftragt sind. Bestätigung der notwendigen Fertigungskapazität.

NACHWEIS ZU EIGNUNGSKRITERIUM 2.3

Angaben über die technische Leitung oder die technischen Stellen, unabhängig davon, ob diese dem Unternehmen angeschlossen sind oder nicht, zwar insbesondere über diejenigen, die mit der Qualitätskontrolle beauftragt sind. Bestätigung der notwendigen Fertigungskapazität.

NACHWEIS ZU EIGNUNGSKRITERIUM 2.4

(*) Unternehmensstruktur Aktuelles Organigramm Aufbau und Organisation des Anbieters Standorte, Niederlassungen, Vertretungen oder Handelspartner in Europa

NACHWEIS ZU EIGNUNGSKRITERIUM 3.1

(*) Handelsregisterauszug oder Abschrift des Berufsregisters oder des Firmenbuches des Herkunftslandes des Anbieters

NACHWEIS ZU EIGNUNGSKRITERIUM 3.2

Erklärung bezüglich eines laufenden oder abgeschlossenen Insolvenzverfahrens oder eines vergleichbaren gesetzlich geregelten Verfahrens über das Vermögen der Unternehmung (ohne Betreibungsregisterauszug).

NACHWEIS ZU EIGNUNGSKRITERIUM 3.3

Erklärung über den Gesamtumsatz des Unternehmens sowie im Detail über den Umsatz im Bereich des Ausschreibungsgegenstandes, jeweils bezogen auf die der Ausschreibung vorangegangenen drei Jahren

NACHWEIS ZU EIGNUNGSKRITERIUM 3.4

Für die letzten drei Geschäftsjahre vor der Ausschreibung: Jahresrechnung bestehend aus Bilanz, Erfolgsrechnung, Anhang (Gliederung gemäss dem zweiunddreissigsten Titel des OR, insb. OR 958, 959a und 959b sowie 959c oder analog) sowie Mittelflussrechnung falls vorhanden inkl. letzter Prüfungsbericht der Revisionsstelle des anbietenden Unternehmens (nicht Mutterhaus).

NACHWEIS ZU EIGNUNGSKRITERIUM 3.5

Bankerklärung welche garantiert, dass im Falle einer Zuschlagserteilung die finanziellen Sicherheitsleistungen wie gemäss Publikation Ziffer 3.2 sowie gemäss Vertragsentwurf gefordert ausgestellt und dem Anbieter die entsprechenden Kredite gewährt werden.

NACHWEIS ZU EIGNUNGSKRITERIUM 3.6

Nachweis einer Betriebshaftpflichtversicherung (Höhe 20 Mio CHF für Sach- und Personalschäden)

NACHWEIS ZU EIGNUNGSKRITERIUM 4.1

(*) Erklärung des Anbieters für die Dauer der Vertragserfüllung, dass eine Vertretung in deutscher und französischer Sprache mit einer maximalen Reaktionszeit von 3 Arbeitstagen vor Ort zur Verfügung steht.




Permalink

Switzerland, Zurich-Thalwil - ch/13

Railway

To be driven in opposite directions from two shafts by 12.3 m-diameter Herrenknecht TBMs: one a hard rock, the other a dual-mode Mixshield slurry machine. First machine launched at Allmend Brunau shaft towards Thalwil, Sept 1998. 9.4 km long to connect with proposed Gotthard AlpTransit tunnel at Nidelbad. Contracting jv of Prader, Locher, Wayss & Freytag. Nov 1998.   Two TBMs now at work, with 12.29 m-diameter south drive machine 3 km into its 5.6 km drive having recorded a best day of 39.1 m or 23 rings while completing 673.2 m of tunnel in June, 1999. First 330 m of north drive being undertaken by second TBM in rock mode using disc cutters and conveyor belt. Following 150 m will be in slurry mode using hydraulic spoil pipelines to surface separation plant. Machine will then complete the bulk of the 2.7 km drive in rock mode in molasse. The final 700 m will be in soft mixed ground with extra drag picks on the cutterhead. Lining comprises seven bolted segments and key, 12.04 m outside diameter and 11.44 m internal diameter. Aliva pumps are used at both TBMs to pump pea gravel into the annulus. Segments are transported by converted Kiruna trucks. There are vehicle turntables behind each TBM. Zimmerberg will connect with AlpTransit Gotthard in a continuous tunnel, possibly using the same machines. Sept 1999.   South section TBM driving 5.6 km from Allmend Brunau to Nidelbad in typical Sweetwater molasse has passed the halfway point and completed 673.2 m in June, 1999 with a best day of 39.1 m or 23 rings. Conveyor capacity is 1,100 t/h using 1 m-wide belt at 2.2 m/sec. Major constraint is the rate at which spoil can be removed from site because only 13 trains/day can be handled. However, 100,000 t surface stockpile will smooth rockflow. First 330 m of 2.7 km north drive was in hard rock, then TBM was converted to slurry mode for 150 m following which it will revert to hardrock configuration. Visit www.herrenknecht.com November 1999.  Rail 2000 Thalwil junction and 900m/1,300m branch tunnels completed using drill/blast to connect with advancing cut and cover. TBM face in main tunnel left ready for AlpTransit drive to Nidelbad when finances are available. Herrenknecht TBMs completed drives in both directions from Allmend Brunau shafts and removed for storage. 27/02.



Permalink

Basler & Hofmann AG Ingenieure Planer und Berater from Zurich secured the EUR642,536 Euro, excluding VAT, for the concept study for the 11 km Zimmerberg II base tunnel and the Meilibach tunnel. Duration of the contract is from 01.07.2018 to   31.03.2020. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1020197. Contact SBB, attn Jogchem Dieleman, Lucerne, email jogchem.dieleman@sbb.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229993-2018. Ref.n. 1149877. 22/18.



Permalink


Open invitation to tender, deadline 16/03/2022, for general management and coordination of technical services - Pre-project phase – for the Zimmerberg 2 base tunnel, Nidelbad-Litti. The contract includes the Nidelbad widening work, the ZBT2 tunnel system with two 10.8km single-track tunnels and the cross connections, as well as the Litti connection with the tunnel portals, the connection to the existing track network and the turnaround facility. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1237183 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1237201 (French). Tenders must be sent to CFF, attn Reto Braegger, Olten, email reto.braegger@sbb.ch. Duration of the contract is from 01/06/2022 to 31/12/2023. Contact CFF, attn Benjamin Karli, Olten, email benjamin.karli@sbb.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=016642-2022. Ref.n. 1161142. 03/22. 

Switzerland-Olten: Engineering services

2022/S 008-016642

Contract notice – utilities

Services

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Chemins de fer fédéraux suisses CFF Infrastructure, Projets d'aménagement et de renouvellement, Région Centre
Postal address: Bahnhofstrasse 12
Town: Olten
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 4600
Country: Switzerland
Contact person: Benjamin Karli
E-mail: benjamin.karli@sbb.ch
Internet address(es):
Main address: https://www.simap.ch
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Planificateur général - Phase d’avant-projet - Tunnel de base du Zimmerberg 2, Nidelbad-Litti

II.1.2)Main CPV code
71300000 Engineering services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: CH0 Schweiz / Suisse / Svizzera
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/06/2022
End: 31/12/2023
This contract is subject to renewal: yes
Description of renewals:

Les dates indiquées ci-dessus sont des dates approximatives. Le calendrier sur lequel repose l'appel d'offres est déterminant.

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 11/03/2022
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
German, French, Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
07/01/2022



Permalink


PG ZBT2+ c/o AFRY Schweiz AG from Zurich have secured the CHF4.36 million contract, excluding VAT, for general management and coordination of technical services - Pre-project phase – for the Zimmerberg 2 base tunnel, Nidelbad-Litti. The contract includes the Nidelbad widening work, the ZBT2 tunnel system with two 10.8km single-track tunnels and the cross connections, as well as the Litti connection with the tunnel portals, the connection to the existing track network and the turnaround facility. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR= 1266931.Contact Schweizerische Bundesbahnen SBB Infrastruktur, attn Benjamin Karli, Olten, email benjamin.karli@sbb.ch. Visit https://ted.europa.eu/en/notice/-/detail/317022-2022. Ref.n. 1161142. 24/22.



Permalink


Open invitation to tender, deadline 12/09/2024, for general planning services from construction to commissioning for the Zimmerberg Base Tunnel 2 (ZBT2) project. The tunnel is approximately 10.8 km long and consists of two single-track tubes. It connects to the Zimmerberg Base Tunnel 1 and extends to the south portal Litti near Baar. The project is divided into the following areas: Nidelbad, tunnel and Deinikon/Litti. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1419621. Duration of the contract is from 31/01/2025 to 31/12/2037. Contact SBB, att.ne Benjamin Karli, Zurigo, email einkauf.bauprojekte.ost@sbb.ch. Visit  https://ted.europa.eu/en/notice/-/detail/391919-2024. Ref.n. 1161142. 27/24.





Permalink


ILF Beratende Ingenieure AG from Zurich secured the EUR 87.32 million (CHF81.30 million) contract for general planner services from the construction to commissioning of the Zimmerberg Base Tunnel 2 (ZBT2) project. The tunnel is approximately 10.8 km long and consists of two single-track tubes. It connects to the Zimmerberg Base Tunnel 1 and extends to the south portal Litti near Baar. The project is divided into the following areas: Nidelbad, tunnel and Deinikon/Litti. Contact SBB, att.ne Benjamin Karli, Zurigo, tel +417900000, email einkauf.bauprojekte.ost@sbb.ch. Visit  https://ted.europa.eu/en/notice/-/detail/707548-2024. Ref.n. 1161142. 48/24.



Permalink

Open invitation to tender, deadline 24/01/2025, for landscape conservation planning in the Zimmerberg Base Tunnel 2 (ZBT2) construction project. For bid documents please click here. Duration of the contract is from 01/04/2025 to 31/12/2028. Contact SBB, Zurigo, email einkauf.bauprojekte.ost@sbb.ch. Visit  https://ted.europa.eu/en/notice/-/detail/681005-2024. 45/24. 



Permalink

DE planikum AG from  Zurich secured the EUR 2.02 million (CHF1.93 million) contract, excluding VAT, for landscape conservation planning in the Zimmerberg Base Tunnel 2 (ZBT2) construction project. Contact SBB, Zurigo, tel +417900000, email einkauf.bauprojekte.ost@sbb.ch. Visit https://ted.europa.eu/en/notice/-/detail/147420-2025. 10/25. 



Permalink

DE_B + S AG from Bern secured the EUR1.79 million (CHF1.67million) contract, excluding VAT, for civil engineering experts for the Zimmerberg Base Tunnel 2 (ZBT2). The tunnel is approximately 10.8 km long and consists of two single-track tubes. It connects to the Zimmerberg Base Tunnel 1 and extends to the south portal Litti near Baar. The project is divided into the following areas: Nidelbad, tunnel and Deinikon/Litti. Contact SBB, Zurich, tel +41790000000, email einkauf.bauprojekte.ost@sbb.ch. Visit https://ted.europa.eu/en/notice/-/detail/408548-2025. 26/25.



Permalink

Open invitation to tender, deadline 30/04/2025, for Civil Engineering Experts for Zimmerberg Base Tunnel 2 (ZBT2). The tunnel is approximately 10.8 km long and consists of two single-track tubes. It connects to the Zimmerberg Base Tunnel 1 and extends to the south portal Litti near Baar. The project is divided into the following areas: Nidelbad, tunnel and Deinikon/Litti. Click here https://www.simap.ch/de/redirect?context=eyJwYWdlIjoicHJvamVjdCIsInJvbGUiOm51bGwsIm9yZ0lkIjpudWxsLCJwcm9qZWN0SWQiOiI2OGZhMzc4MC01NDZjLTQxNmMtYjA1Mi0xNzNiMTgyMzBlYjkiLCJsb3RJZCI6bnVsbCwic3Vic2NyaXB0aW9uSWQiOm51bGx9 for bid documents. Value of contract EUR 1.79 million (CHF1.67million), excluding VAT. Duration of the contract is from 01/09/2025 al 31/12/2043. Contact SBB, Zurich, tel +41790000000, email einkauf.bauprojekte.ost@sbb.ch. Visit https://ted.europa.eu/en/notice/-/detail/136909-2025. Ref.n. 1161142. 10/25.



Permalink

Switzerland, Thurgau - ch/12

Highway N7 Girsberg

3.3 m pilot bore followed by 1.2 km roadheader excavation as top heading and bench. For completion end-2001. August 1998.



Permalink

Switzerland, Geneva - ch/11

CERN Large Hadron Collider

Three contracts awarded worth over $160 million: Teerag-Asdag/Baresel/Locher for two caverns and two shafts; Dragados/SELI for two caverns; and Taylor Woodrow/Amec/Spie Batignolles for two tunnels total length 5 km and several caverns. Completion for 2005. February 1998. Work progressing well at three projects involving six shafts, 32 caverns and 6 km of tunnels. At point 1, the larger of two new experimental halls is UX15 with a span of 35 m. The second is USA15 with a span of 23 m which will be supported by 36 anchor tendons, each with 235 t breaking strain. At point 5, the 70 m-deep shafts are being sunk through 45 m of waterbearing moraine by freezing using recirculating brine at -25 degrees C. There are also two large caverns of widths 26.5 and 18 m with 250 m of connecting tunnels. In the vicinity of point 1 the first of two 2.5 km-long, 12 sq m tunnels is under construction as part of package 3 using an Alpine Westfalia WAV 50 roadheader with 100 t/h conveyor with best day performance of 12.5 m and average of 6 m. The second tunnel will be driven using a 3.8 m-diameter TBM. The rest of package 3 work is spread throughout the 27 km-long circular LEP ring and includes 700 m of minor tunnels, two shafts and 15 chambers. Total value $220 million. The existing LEP collider will close in October, 2000 to facilitate the upgrading work and will reopen as LHC in 2005. The new ring will then carry out some of the experiments for which the ill-fated Supercollider in the U.S. and the Protvino collider in Russia had been designed. Visit the world's first website, opened in 1989 at www.cern.ch May 2000.  Spie Batignolles/Sotrabas has purchased a SM 130-C roadheader from IBS of Germany with cutting performance 150kW, machine-integral slewing belt conveyor, and attachments for rockbolting. The machine will join the two modified AM 50 roadheaders already supplied. Visit www.cern.com July 2000.



Permalink

Syria

Syria, Al Rouj - sy/12

Water Conveyance

4.14 km-long, 8 sq m horseshoe section advanced from both ends at 122 m/month/face beneath Ante Lebanon mountains from Aen Zarka to Al Balaa by contractors Banske Stavby of Prievidza, Slovakia and Takla-Weavers of Guernsey, UK. Holed 16th November, 1998. Generally in competent limestone of 9 – 62 Mpa using resin encapsulated rockbolts, steel arches, mesh and lagging. Some dry karst caverns encountered. Maximum overburden 200 m. One 10 m section was supported by micropiles and compensation grouted. Final lining of 20-30 cm-thick monolithic concrete under installation using 10 m telescopic slip formwork. Two vent shafts of 800 mm diameter by 58 m-deep and 108 m-deep installed for emergency escape. December 1999.



Permalink

Syria, Damascus - sy/11

Metro

Feasibility study under way by Tehran Urban & Suburban Railway Company. March 1998.Restricted call for tenders, deadline 5th May, 2006 for technical assistance intended to make a recommendation on the preferred option for the implementation of the Green Line of the Damascus metro project in physical, technical, organizational and financial terms. This is the first metro line for Damascus, running on the busiest southwest to northeast axis of the city from Mezzeh to Qaboun, a distance of some 15 kilometres with some expected 22 stations. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=062916-2006, OJ S 61, or contact European Investment Bank, Mr Stefan Kerpen, OPS B/FEMIP/Special Operations Division, Technical Assistance Unit (TAU), 100 boulevard Konrad Adenauer, L-2950 Luxembourg. 15/06.The six shortlisted candidates for the technical assistance intended to make a physical, technical, organizational and financial recommendation on the preferred option for the implementation of the Green Line of the Damascus metro are BCEOM / Semaly; C. Lotti & Associati / Geodata / Stipe; Italferr / Metropolitana Milanese; Sener / Mott MacDonald; Systra / Khatib & Alami Offshore; and WSP Group / DE-Consult / OPTIM Obermeyer Proje. The Green Line is the first metro line for Damascus, running on the busiest southwest to northeast axis of the city from Mezzeh to Qaboun, a distance of some 15 kilometres with some expected 22 stations. 42/06.The Governorate of Damascus and the Municipalities Ministry have awarded an engineering contract the first metro line to France's Systra and Khatib & Alami of Lebanon. The 14.8 km line will connect Mezzeh to Qaboun. The 18-month study will be financed by the European Investment Bank (EIB). The consultants will also look into the possibility to integrate three other lines to form a 52 km network in Damascus. Click sy/11. Visit www.systra.com and www.khatibalami.com 25/07.



Permalink

Taiwan

Taiwan, Taiwan Strait - tw/16

Freight

Memorandum of understanding signed on 18th November, 2001 with contractors Daewoo, Hyundai, New Japan Steel, Vinci, and Spain's Global Champion to evaluate the feasibility of a US$100 billion project including an intercontinental transshipment centre and an undersea tunnel connecting central Taiwan to the Penghu islands in the Taiwan Strait. 49/01.



Permalink

Taiwan, Wu-Chien - tw/15

Hydropower

  Kumagai-Gumi to use 6.2 m-diameter Robbins TBM ex-Hong Kong Quarry Bay congestion relief works. Visit www.robbinstbm.com May 2000.  Breakthrough reported on 7th June, 2002 on a 6.5 km water tunnel, 6.2 m in diameter, for a hydroelectric project. Client is Taiwan Power. Contractors are New Asia and Kumagai Gumi. Excavation with a Robbins TBM. Support with steel rings, mesh and shotcrete. Geology consisted in sandstone and laminated mudstone. Construction started in April 2000. Stripping out of the TBM is underway, setting up of the concrete shuttering. Completion expected in 18 months. Cost of NT$ 12.4 billion. Visit www.taipower.com.tw and www.robbinstbm.com 27/02.



Permalink