Spain,
Galicia
- es/45
High Speed Railway
Open invitations to tender for
engineering design of three sections of the high-speed railway line planned
through the region, deadlines 23rd January, 2001 to 9th February, 2001. Fax
Ministerio de Fomento at +34 91 597 9342 or visit www.gif.es
05/01.
Open invitation to tender,
deadline 31st July, 2001, for design of railway line to include tunnels. Contact
Ministry of Works, Madrid, fax +34 91 5979341. Visit www.boe.es
28/01.
Tenders imminent for the Variante
de Bregua on the La Coruña-Santiago de Compostela section of the high speed
train in Galicia that will connect together Ferrol, La Coruña, Santiago, Pontevedra,
Vigo, and the Portuguese border. There will be a 2,834 m-long double-track tunnel.
Tender value will be €63 million with a time frame for construction of 28 months.
10/02.
Open tendering, deadline 1st
April, 2002 for the work supervision of the Variante de Bregua on the La Coruña-Santiago
de Compostela section of the high speed train. Includes a 2,834 m-long double-track
tunnel. Tender value of €2.3 million. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm,
OJ S 45, document 35365-2002 or contact ministry of development, Madrid, fax
+34 915979341/2/3. 11/02.
Open tendering, deadline 20th
May, 2002 for the construction of the Bregua variant between Boedo and Uxes
on the La Coruña-Santiago de Compostela high speed link. Includes a 2.8 km-long
double-track tunnel. Tender value of €63 million. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm,
OJ S 77, document 59846-2002 or contact Ministry of development, Madrid, fax
+34 915631574. 18/02.
Call for tenders imminent
further to government approval of the 7.7 km Portela-Portas subsection of the
Ferrol-La Coruña-Santiago-Pontevedra-Vigo-Portuguese border high speed line.
Includes the 4 km Lantaño tunnel. Cost of €77.6 million and construction time
of 34 months. Visit www.gif.es
23/02.
Call for tenders imminent
further to government approval of the 7.2 km Variante de Ordes on the Santiago-La
Coruña line. Includes two tunnels, 446 m and 570 metres in length. Cost of €54.5
million and construction time of three years. Already 20% of the 64.4 km line
is under construction. Visit www.gif.es
24/02.
Award to Euroconsult of the
Variante de Bregua work supervision on the La Coruña-Santiago de Compostela
section of the high speed train. Includes a 2.8 km double-track tunnel. Contract
value of €1.5 million. 26/02.
Open call for bids, deadline
22nd July, 2002 for construction of section 1 Portela-Portas of the Variante
de Portas in Pontevedra. The 4 km Lantaño tunnel will be built on this section.
Tender value €77.6 million. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini,
OJ S 122, document 94905-2002 or contact ministry of development, Madrid, fax
+34 915979942 or +34 915978470. E-mail vrpascual@mfom.es
and cpublic@mfom.es 27/02.
Open call for bids, deadline
25th July, 2002 for construction of the Variante de Ordes in La Coruña. Tender
value €54.5 million. Includes two tunnels, 446 m and 570 m. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini,
OJ S 124, document 96614-2002 or contact ministry of development, Madrid, fax
+34 915979942 or +34 915978470. E-mail vrpascual@mfom.es
and cpublic@mfom.es 28/02.
Two open call for bids, deadline
28th August, 2002 for work supervision. First is for the Portela-Portas section,
including a 4 km tunnel. Tender value €2.7 million. Second is for the Ordes
variant, including two tunnels totalling approximately 1 km. Tender value €2.6
million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=112289-2002
and http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=112297-2002,
OJ S 142, or contact Ministry of development, Madrid, fax +34 915979942 or +34
915979342. E-mail vrpascual@mfom.es and
cpublic@mfom.es 31/02.
Award by the ministry of development
to a jv of Sacyr, Construcciones Paraño and Cavosa of a €54.3 million contract
to build the Bregua bypass between La Coruña and Santiago de Compostela including
a single 2,834 m-long double-track tunnel. Drill/blast excavation. Visit www.sacyr.com
and www.cavosa.es. E-mail
marubio@mfom.es 40/02.
Award to a joint venture of
Aldesa Construcciones, Obras Subterráneas, Dicaminos, and Tableros y Puentes
of a €58.7 million contract to build the Portelas-Portas section of the Variante
de Portas in Pontevedra, including the 4 km Lantaño tunnel. E-mail marubio@mfom.es
41/02.
OHL and its subsidiary Guinovart
& Obras y Servicios Hispania have scooped a €46.8 million contract to dual
the 7.2 km Oroso-Ordes section in La Coruña, known as Variante de Ordes. Two
tunnels will be required, 446 m and 570 m in length. Time frame for construction
30 months. Visit www.ohl.es 45/02.
Award to Norcontrol of a €1.8
million contract for work control and supervision of the Portela-Portas section
in Pontevedra. Includes the 4 km Lantaño tunnel. Visit www.gif.es
48/02.
Public inquiry is open for
the León-Ponferrada high speed rail section. The inquiry is based on option
1 from the draft design study undertaken by Iberinsa. This 112.4 km-long option
has an estimated cost of €573.7 million. Ten tunnels will be necessary, the
longest of which being 3.4 km in length.
13/03.
The Ministry of development has requested the environment impact study to the
Ministry of environment for the Vigo-Pontevedra high speed section. Option 2
has been selected, 27.7 km in length for an estimated budget of €293.1 million.
There are 11 km of tunnels on the alignment. There will be one tunnel under
the Vigo-Pontevedra highway, two 5,910 m-long one-track tunnels near A Madroa,
a 1,225 m tunnel in Redondela, another two tunnels prior to arriving in Arcade
(2,155 m and 925 m) and a 720 m tunnel at the exit of Arcade. 13/03.
Open call for bids, deadline
3rd June, 2003 for engineering for section Cerceda-Meirama (8 km) on the high
speed train link in Galicia, including two tunnels (190 m and 1,770 m). Tender
value: €966,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=076913-2003,
OJ S 86, or contact Ministry of development, Madrid, fax +34 915979342. E-mail
vrpascual@mfom.es 20/03.
Open call for bids, deadline
30th June, 2003 for construction of the Queixas bypass on section Santiago-La
Coruña. Length is 6.1 km, whereof a 2,140 m double-track tunnel. Tender budget:
€43.9 million. Time frame for construction: 32 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087065-2003,
OJ S 97, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es and cpublic@mfom.es
22/03.
Open call for bids, deadline 30th June, 2003 for construction of the Portas-Vilagarcía
bypass, section II. The length is 6.6 km, whereof the El Pousadoiro double-track
tunnel (2,355 m). Tender budget: €43.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087070-2003,
OJ S 97, or contatc Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es and cpublic@mfom.es
22/03.
Open call for bids, deadline
30th July, 2003 for consultancy and assistance during work control and supervision
of section Portas-Vilagarcía de Arousa on the Portas bypass in Pontevedra province.
This section includes the Pousadoiro tunnel, 2,355 m in length, for a double
track. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=109945-2003,
OJ S 122, or contact Ministry of development, Madrid, fax +34 915979342 or 8470.
E-mail cpublic@mfom.es 28/03.
A €590,950 contract has been awarded to
Ginprosa for assistance to the design of the Cerceda-Meirama section of the high
speed train in La Coruña province. This section includes two tunnels, 190 m and
1,770 m in length. 32/03.
The ministry of development has awarded to Intecsa-Inarsa the
design of the Meirama-Bregua section of the high speed line that will link Ferrol,
La Coruña, Santiago, Pontevedra, Vigo and the Portuguese border. Includes a 3,390
m tunnel. Budget estimated at €71.5 million. Design will take 12 months. Visit
www.intecsa-inarsa.es
35/03.
A JV of Aldesa Construcciones, Dicaminos, Tableros y Puentes, and Obras Subterráneas
has won a contract to build the Queixas bypass, 6.1 km in length, including a
2,140 m-long 13.3 m-wide single-tube double-track tunnel. Contract value: €33.4
million. Time frame for construction: 32 months. The Queixas bypass is part of
the Santiago-La Coruña high speed link. Visit www.aldesaconstrucciones.es
and www.obrassubterraneas.es
42/03.
Coprosa in JV with Construcciones Sánchez Domínguez have secured a €52.8 million
contract to build the second section of the 6.6 km Portas bypass. This section
between Portas and Vilagarcía de Arousa includes the 2,355 m-long dual-track Pousadoiro
tunnel. Time frame for construction: 28 months. The Portas bypass is part of the
Santiago-Vigo high speed rail link. Visit www.coprosa.es
42/03.
GPO Ingeniería has secured a €1.2 million contract for work supervision and construction
management of the Queixas bypass, which includes a 2,140 m-long 13.3 m-wide dual-track
tunnel. Visit www.gpo.es
46/03.
Open call for bids, deadline 6th February, 2004 for design and construction of
subsection Silleda (Dornelas)-Vedra (6.4 km) and Vedra-Boqueixon (6.9 km) on section
Lalin-Santiago. There are six tunnels: O Portino (600 m), O Curro (870 m), Castro
(475 m), Caldelas (623 m), O Reboredo (810 m) and Ardilleiro (725 m). Tender budget:
174.4 million euros. Time frame: 36 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=000484-2004,
OJ S 1, or contact GIF, Madrid, fax +34 913198535. 03/04.
Open call for bids, deadline 28th January, 2004 for design and construction of
subsections Amoeiro-Maside (6.3 km) and Maside-Carballino (5.8 km) on section
Ourense-Lalin. There are three tunnels: the first is 1,140 m in length, Mundin
(1,112 m) and Os Palleiros (360 m). Tender budget: 154 million euros. Time frame:
24 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=001270-2004,
OJ S 2, or contact GIF, Madrid, fax +34 913198535.
Open call for bids, deadline 28th January, 2004 for design and construction of
subsections Carballino-O Irixo (6.7 km) and O Irixo-Lalin (6.5 km) on section
Ourense-Lalin. There are three tunnels: Piteira (2,135 m), Barro (1,494 m) and
Outeiro (2,866 m). Tender budget: 196.5 million euros. Time frame: 34 months.
Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=003056-2004,
OJ S 4, or contact GIF, Madrid, fax +34 913198535. For other tunnels tendered,
read E-News Weekly
3/2004. 03/04.
Open call for bids, deadline 26th February, 2004 for design of the Das Maceiras-Redondela
section in Pontevedra province. This 4 km section includes a 1,225 m tunnel. Visit
http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=016390-2004,
OJ S 19, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470.
E-mail vrpascual@mfom.es
or cpublic@mfom.es
07/04.
Open call for bids, deadline 26th February, 2004 for design of the Redondela-Soutomaior
section in Pontevedra province. This 3.5 km section includes a 2,155 m tunnel.
Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=016364-2004,
OJ S 19, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470.
E-mail vrpascual@mfom.es
or cpublic@mfom.es
07/04.
Open call for bids, deadline 26th February, 2004 for design of the Vigo-Das Maceiras
section in Pontevedra province. This 9 km section includes a 5,910 m twin bore
tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=017269-2004,
OJ S 20, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470.
E-mail vrpascual@mfom.es
or cpublic@mfom.es
07/04.
Open call for bids, deadline 4th March, 2004 for design of the Uxes-Pocomaco section
in La Coruña province. This 4.3 km section includes two tunnels, 320 m in length
and 1,850 m under Mount do Espinle. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020232-2004,
OJ S 23, or contact Ministry of public works, Madrid, fax +34 915979342 or 8470.
E-mail vrpascual@mfom.es
or cpublic@mfom.es.
Read E-News
Weekly 34/2003. More tunnels tendered in E-News
Weekly 7/2004. 07/04.
Corsan-Corviam has pocketed a EUR90.8 million contract to build the 6.4 km Ourense-Amoeiro
section of the Ourense-Santiago line. Includes two tunnels, 679 m and 4,062 m
in length. Visit www.corsan-corviam.es
11/04.
OHL secured a EUR57.4 million contract for the design and construction of subsection
Boqueixon-Santiago de Compostela. This 5.84 km stretch runs entirely in La Coruna
province and requires the building of two tunnels in Marrozos (1,260 m) and Santiago
(620 m). Visit www.ohl.es
11/04.
Construction management and work control of the Ourense-Lalin line goes to Getinsa,
for EUR7.6 million. Visit www.getinsa.es
11/04.
FCC and Comsa have won a EUR117.8 million contract for the design and construction
of subsection Amoeiro-Maside-Carballino (12.1 km) on section Ourense-Lalín, including
three tunnels totalling 3.6 km (1,140 m, 1,112 m and 360 m). Time frame for design:
six months. Time frame for construction: 21 months. Visit www.fcc.es
and www.comsa.com
12/04.
Sacyr Vallehermoso, Cavosa and Obras y Servicios de Galicia y Asturias won a EUR115.7
million contract for the design and construction of subsection Carballino-O Irixo-Lalin
(13.2 km) on section Ourense-Lalin, including three tunnels totalling 6.5 km (2,135
m, 1,494 m and 2,866 m). Visit www.sacyr.com
and www.cavosa.es
12/04.
Construction management of section Lalin-Santiago has been awarded to a JV between
Idom Internacional and Geocontrol. Subsection Lalin (Baxan)-Lalin (Anzo)-Silleda
(Carboeiro), 14.4 km in length, includes five tunnels for a total of 4,725 m (810
m, 1,215 m, 490 m, 790 m and 1,420 m). Subsection Silleda (Dornelas)-Vedra-Boqueixon,
13.3 km in length, includes six tunnels totalling 4,103 m. Subsection Boqueixon-Santiago
incorporates two tunnels, 1.2 km and 620 m in length. There are also tunnels on
subsection Silleda (Carboeiro)-Silleda (Dornelas). Read E-News
Weekly 3/2004. Visit www.idom.es
and www.geocontrol.es
12/04.
Dragados and Tecsa won a EUR109.5 million contract to design and build subsection
Silleda (Dornelas)-Vedra (6.4 km) and Vedra-Boqueixon (6.9 km) on section Lalin-Santiago.
There are six tunnels in O Portino (600 m), O Curro (870 m), Castro (475 m), Caldelas
(623 m), O Reboredo (810 m) and Ardilleiro (725 m). Visit www.dragados.com
16/04.
Payma Cotas has been apppointed designer of the 4.3 km Uxes-Pocomaco section in
La Coruna province, which includes two tunnels, 320 m and 1,850 m in length. Contract
value: EUR448,900. Visit www.paymacotas.com
24/04.
Typsa won a EUR829,190 contract for the design of the 9 km Vigo-Das Maceiras section
in Pontevedra province. The section includes a 2 x 5,910 m-long single-track tunnel.
Visit www.typsa.es 24/04.
Proser won a EUR408,760 contract to design the 3.5 km Redondela-Soutomaior of
the high speed line in Pontevedra province. This 3.5 km section includes a 2,155
m tunnel. Visit www.proser.es
26/04.
GPO Ingenieria secured a EUR430,900 contrac to to design the 4 km Das Maceiras-Redondela
section in Pontevedra province, including the 1,225 m A Madroa tunnel. Visit www.gpo.es
26/04.
Open call for bids, deadline 19th August, 2004 for design of the Lalin (Baxan)-Lalin
(Anzo)-Silleda (Carboeiro) section, 14.4 km in length, which includes five tunnels
for a total of 4,725 m (810 m, 1,215 m, 490 m, 790 m and 1,420 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=107740-2004,
OJ S 127, or contact GIF, Madrid, fax +34 913198535. This is a rebid further to
the decision of the Ministry of public works to cancel a previous design and build
tender and to invite tenders separately for design and construction. 29/04.
Apia XXI will design the 7.5 km Puebla San Julian bypass, on the Orense-Monforte-Lugo
high speed line. The contract is worth EUR1 million. There will be a 570 m tunnel
under Mount Castelvelo and a 1,520 m tunnel under Mounts Chaia and Porqueiro.
Subscribe to E-News Weekly 19/2003.
Visit www.apiaxxi.es 41/04.
Apia XXI has secured a EUR1.3 million contract to design section Lalin (Baxan)-Lalin
(Anzo)-Silleda (Carboeiro) on the Ourense-Santiago line. This 14.4 km section
includes five tunnels (810 m, 1,215 m, 490 m, 790 m and 1,420 m). Visit www.apiaxxi.es
42/04.
Open call for bids, deadline 7th February, 2005 for construction of section Ordes-Queixas
(3.9 km), which includes two tunnels totalling 1 km. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=221251-2004,
OJ S 255, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es or cpublic@mfom.es
02/05.
Open call for bids, deadline 24th January, 2005 for work control and supervision
during construction of section Ordes-Queixas (3.9 km), which includes two tunnels
totalling 1 km. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213102-2004,
OJ S 247, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es or cpublic@mfom.es
02/05.
Norcontrol secured a EUR972,500 contract for work control and management of the
3.9 km Ordes-Queixas section, including two tunnels for a total length of 1 km.
Visit www.norcontrol.es
16/05.
Corsan-Corviam and Copasa won a EUR28.4 million contract for construction of the
4,298 m Ordes-Queixas section, which includes two twin-track tunnels (233 m and
1.023 m). This section connects the Ordes and Queixas bypasses. Visit www.corsan-corviam.es
21/05.
Open call for tenders, deadline 11th August, 2005 for construction management
of section Cerceda-Meirama (8 km) in La Coruna province. This section includes
two tunnels, 190 m and 1,770 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=125922-2005,
OJ S 127, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
28/05.
Open call for tenders, deadline 5th September, 2005 for work control and inspection
during construction of section Meirama-Bregua, including a 3,390 km tunnel. Visit
http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=137814-2005,
OJ S 139, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
30/05.
Open call for bids, deadline 8th September, 2005 for construction of the 9 km
Lalin (Baxan)-Lalin (Anzo) section. This section includes three tunnels: A Pena
(810 m), Vilar do Xestal (1.215 m) and Anzo (540 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148601-2005,
OJ S 149 or contact ADIF, Madrid, fax +34 917005751. 35/05.
Open call for bids, deadline 8th September, 2005 for construction of the 5.3 km
Lalin (Anzo)-Silleda (Carboeiro) section. This section includes two tunnels, 790
m and 1,420 m in length. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148592-2005,
OJ S 149 or contact ADIF, Madrid, fax +34 917005751. 35/05.
Open call for bids, deadline 19th September, 2005 for construction of the 5 km
Meirama-Bregua section. This section includes a 3,469 m tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=152716-2005,
OJ S 153 or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es or cpublic@mfom.es
35/05.
Open call for bids, deadline 28th September, 2005 for construction of the 8.1
km Cerceda-Meirama section. This section includes two tunnels, 1,735 m and 180
m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=155729-2005,
OJ S 156, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es or cpublic@mfom.es
36/05.
A consortium including Sacyr (35%), its affiliate Cavosa (30%), and GEA 21 (35%)
will build section Meirama-Bregua on the high speed line in La Coruna province,
for EUR75.65 million. The project will convert an existing non-electrified single-track
section into a dual track suitable for high speed. The new alignment spans 5.34
km, whereof 88% represents a tunnel and a viaduct. The 3.47 km Meirama tunnel
under Mounts Xalo will have two emergency exits (three galleries), advanced safety
equipment and plates on the tracks to facilitate the driving with rescue vehicles.
Visit www.gruposyv.com, www.cavosa.es
and www.gea21.es 44/05.
In addition, ADIF awarded contracts worth EUR187.4 million for the construction
of sections Lalin (Baxan)-Lalin (Anzo) and Lalin (Anzo)-Silleda (Carboeiro), two
sections on the Ourense-Santiago high speed connection. The first bidding process
had been cancelled by the ministry of public works to separate design and construction
in different contracts. The first section, 9 km in length, will be built by Ferrovial
Agroman. It includes three tunnels: A Pena (810 m), Vilar do Xestal (1.215 m)
and Anzo (540 m). Visit www.ferrovial.com
44/05.
The second section between Lalin (Anzo) and Silleda (Carboeiro), 5.3 km in length,
has been awarded to Comsa. It includes two tunnels, 790 m and 1,420 m in length.
Visit www.comsa.com 44/05.
GPO secured a EUR1.6 million contract for work control and inspection of the 8.1
km Cerceda-Meirama section in La Coruna province, which includes two tunnels (1,735
m and 180 m). Visit www.gpo.es
47/05.
Apia XXI secured a EUR1.4 million contract for the work control and inspection
during construction of section Meirama-Bregua, including a 3,390 km tunnel. Visit
www.apiaxxi.es 48/05.
Ferrovial Agroman will construct, for EUR53.4 million, section Cerceda-Meirama
(8.1 km) in La Coruna province. This section includes two tunnels, 1,735 m and
180 m in length. Visit www.ferrovial.com
03/06.
Open call for tenders, deadline 23rd February, 2006 for construction of the Uxes-Pocomaco
section (4.3 km) in La Coruna province, including two tunnels, 1,880 m and 490
m long. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=08578-2006,
OJ S 8, or contact Ministry of public works, Madrid, fax +34 915979342 o 915978470.
E-mail vrpascual@mfom.es 05/06.
Open call for tenders, deadline 4th April, 2006 for control and work supervision
during construction of sections Uxes-Pocomaco and Pocomaco-San-Cristobal in La
Coruna province. Section Uxes-Pocomaco includes two tunnels (1,880 m and 490 m)
while section Pocomaco-San-Cristobal has two (387 m and 282 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=045618-2006,
OJ S 43, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es 11/06.
Open call for tenders, deadline 10th May, 2006 for design of the Vilargarcia de
Arousa-Catoira section (8.3 km) of the Atlantic coast high speed line in Pontevedra
province, including three tunnels (1,320 m, 950 m and 490 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077756-2006,
OJ S 74, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
18/06.
Open call for tenders, deadline 10th May, 2006 for design of the Rialino-Padron
section (8.7 km) of the Atlantic coast high speed line in La Coruna province,
including one tunnel (1,700 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077730-2006,
OJ S 74, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
18/06.
Open call for tenders, deadline 27th June, 2006 for safety equipment in a 2,140
m double-track tunnel on the Queixas bypass and in two tunnels totalling 1 km
on the Ordes-Queixas bypass on the Santiago-La Coruna high speed link. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105901-2006,
OJ S 99, or contact Ministry of public works, Madrid, fax +34 915979342. E-mail
vrpascual@fomento.es 23/06.
Open call for tenders, deadline 10th July, 2006 for work control and supervision
during installation of the safety equipment in a 2,140 m double-track tunnel on
the Queixas bypass and in two tunnels totalling 1 km on the Ordes-Queixas bypass
on the Santiago-La Coruna high speed link. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=116842-2006,
OJ S 109, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
25/06.
ACS, through its affiliated companies Dragados and Tecsa, has bagged a EUR51.11
million contract for the construction of section Uxes-Pocomaco on the Atlantic
corridor, the high speed link which will connect La Coruna, Santiago de Compostela,
Pontevedra and the Portuguese border. This is the first section, 4,346 metres
in length, of the two on the 8 km Uxes-La Coruna railway bypass, which will connect
the Bregua bypass with La Coruna San Cristobal station. The section includes two
tunnels, 490 metres and 1.8 km long. Visit www.dragados.com
and www.tecsa.es 27/06.
Open call for tenders, deadline 25th September, 2006 for supervision of construction
works of the Vigo-Das Maceiras section (9 km) on the Atlantic coast high
speed link between La Coruna and Vigo. This section includes the 2 x 6 km Das
Maceiras tunnel under Mount A Madroa. Both tubes will lie 30 metres apart and
be cross connected every 250 metres. Read E-News
Weekly 46/2004. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167256-2006,
OJ S 155, or contact Ministry of public works, Madrid, fax +34 91 5979342 or 915978470.
E-mail vrpascual@mfomento.es or cpublic@fomento.es
35/06.
Open call for tenders, deadline 27th September, 2006 for construction of the Redondela-Soutomaior
section (3.5 km) on the Atlantic coast high speed link between La Coruna and Vigo.
This section includes a 2,155 m tunnel in Arcade. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=168630-2006,
OJ S 156, or contact Ministry of public works, Madrid, fax +34 91 5979342 or 915978470.
E-mail vrpascual@mfomento.es or cpublic@fomento.es
35/06.
AEPO signed a EUR806,000 contract to design the Vilargarcia de Arousa-Catoira
section (8.3 km) of the Atlantic coast high speed line in Pontevedra province,
including three tunnels (1,320 m, 950 m and 490 m). Visit www.aepo.es
39/06.
Inocsa pocketed a EUR660,000 contract to design the Rialino-Padron section (8.7
km) of the Atlantic coast high speed line in La Coruna province, including one
tunnel (1,700 m). Visit www.inocsa.es
39/06.
GPO received a EUR1.6 million contract to control and supervise the construction
of sections Uxes-Pocomaco and Pocomaco-San-Cristobal in La Coruna province. Section
Uxes-Pocomaco includes two tunnels (1,880 m and 490 m) and section Pocomaco-San-Cristobal
has two as well (387 m and 282 m). Visit www.gpo.es
41/06.
The bidding process for supervision of construction works of the 3.5 km Redondela-Soutomaior
section on the Atlantic coast high speed link between La Coruna and Vigo has been
cancelled. This section includes a 2,155 m tunnel in Arcade. 41/06.
Dimetronic won a EUR5 million contract for safety equipment in a 2,140 m double-track
tunnel on the Queixas bypass and in two tunnels totalling 1 km on the Ordes-Queixas
bypass on the Santiago-La Coruna high speed link. Visit www.dimetronic.es
44/06.
Open call for tenders, deadline 20th November, 2006 for work control and supervision
during construction of the 9 km Vigo-Das Maceiras section on the Atlantic coast
high speed link between La Coruna and Vigo. This section includes the 2 x 6 km
Das Maceiras tunnel under Mount A Madroa. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=212891-2006,
OJ S 200, or contact Ministry of public works, Madrid, fax +34 91 5979342 or 915978470.
E-mail vrpascual@mfomento.es or cpublic@fomento.es
45/06.
Open call for tenders, deadline 18th December, 2006 for construction of the 2,540
m-long Soutomaior-Vilaboa section on the Atlantic coast high speed line, including
the Xesteira tunnel (782 m), the Pontesampaio tunnel (176 m) and a 243 m cut-and-cover
tunnel to cross the N-550 in Arcade. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231655-2006,
OJ S 216, or contact Ministry of public works, Madrid, fax +34 915979342 and 915978470.
E-mail vrpascual@fomento.es and cpublic@fomento.es
50/06.
Open call for bids, deadline 23rd January, 2007 for construction of the Redondela-Soutomaior
section in Pontevedra province. This 3.5 km section includes the 2,155 m-long
Arcade tunnel. This is a re-bid. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=256552-2006,
OJ S 240, or contact Ministry of public works, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@mfom.es or cpublic@mfom.es
01-02/07.
Ferrovial Agroman and Obras Subterraneas pocketed a EUR78 million contract to
build the Puebla de San Julian railway bypass on the new Orense-Monforte-Lugo
high speed line in Lugo province. The section includes three tunnels, of 300 m,
520 m y 1.450 m respectively. Visit www.ferrovial.es
and www.obrassubterraneas.es
01-02/07.
FCC and Acciona Infraestructuras
secured a EUR157.9 million contract to build the Vigo-Das Maceiras section on
the Atlantic coast high speed line. This 7,123 m-long section runs from the intersection
of the railway with Buenos Aires Avenue in Vigo up to Das Maceiras valley in Redondela.
A 6 km tunnel will be built, consisting of two single-track bores built 30 metres
apart and connected to each other by safety cross passages every 250 metres. Visite
www.fcc.es y www.acciona.es
01-02/07.
Applus Norcontrol secured a EUR159,352 contract for site supervision during installation
of the safety equipment in a 2,140 m double-track tunnel on the Queixas bypass
and in two tunnels totalling 1 km on the Ordes-Queixas bypass on the Santiago-La
Coruna high speed link. Visit www.appluscorp.com
03/07.
Sener and Geoconsult España secured a EUR3.1 million contract for site supervision
during construction of the 9 km Vigo-Das Maceiras section on the Atlantic coast
high speed link between La Coruna and Vigo. This section includes the 2 x 6 km
Das Maceiras tunnel under Mount A Madroa. Visit www.sener.es
and www.geoconsult.es 03/07.
Ineco pocketed a EUR1.7 million contract for site supervision during construction
of the Puebla de San Julian railway bypass on the new Orense-Monforte-Lugo high
speed line in Lugo province. The section includes three tunnels of 300 m, 520
m and 1,450 m respectively. Read E-News
Weekly 44/2006. Visit www.ineco.es
03/07.
Open call for tenders, deadline 20th February, 2007 for construction of the Das
Maceiras-Redondela section on the Atlantic coast high speed line from Ferrol to
the Portuguese border through La Coruña, Santiago de Compostela, Pontevedra and
Vigo. This 3,922 m-long subsection, in Pontevedra province, requires to construct
the 1,220 m-long 88 sq m twin-track Novelle tunnel and cut-and-cover tunnels in
Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=18199-2007,
OJ S 16, or contact Ministry of public works, Madrid, fax +34 915979342 o 915979938.
E-mail vrpascual@fomento.es or cpublic@fomento.es
06/07.
Open call for tenders, deadline 16th April, 2007 for on-site supervision and work
control during construction of the 2.5 km Soutomaior-Vilaboa section on the Atlantic
coast high speed line, including the Xesteira tunnel (782 m), the Pontesampaio
tunnel (176 m) and a 243 m cut-and-cover tunnel to cross the N-550 in Arcade.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=50463-2007,
OJ S 41, or contact Ministry of Development, Madrid, fax +34 915979342 and 915978470.
E-mail vrpascual@fomento.es and cpublic@fomento.es
12/07.
Open call for tenders, deadline 8th May, 2007 for work control and on-site supervision
on the Atlantic coast high speed link between Vigo and Pontevedra for the 3.9
km Das Maceiras-Redondela section, including the 1.2 km Novelle tunnel and cut-and-cover
tunnels in Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length, and
for the 3.5 km Redondela-Soutomaior section, including a 2,155 m tunnel in Arcade.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=70472-2007,
OJ S 57, or contact Ministry of Development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
14/07.
Comsa bagged a EUR34.1 million contract to construct the 2,540 m-long Soutomaior-Vilaboa
section on the Atlantic coast high speed line, including the 782 m Xesteira tunnel,
the 176 m Pontesampaio tunnel and a 243 m cut-and-cover tunnel to cross the N-550
in Arcade. Visit www.comsa.com
22/07.
Construction of the 3.9 km Das Maceiras-Redondela section on
the Atlantic coast high speed line from Ferrol to the Portuguese border through
La Coruña, Santiago de Compostela, Pontevedra and Vigo has been awarded to Vias
y Construcciones and Corsan-Corviam. This EUR39.9 million subsection includes
the 1,220 m-long 88 sq m twin-track Novelle tunnel and cut-and-cover tunnels in
Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length. Visit www.vias.es
and www.corsan-corviam.es
23-24/07.
A EUR37.8 million contract has been awarded to Copasa and Tableros y Puentes to
construct the Redondela-Soutomaior section in Pontevedra province. This 3.5 km
section includes the 2,155 m-long Arcade tunnel. Visit www.copasa.es
and www.tapusa.es
23-24/07.
Saitec pocketed a EUR2.3 million contract for on-site supervision and work control
during construction of the 2.5 km Soutomaior-Vilaboa section on the Atlantic coast
high speed line, including the Xesteira tunnel (782 m), the Pontesampaio tunnel
(176 m) and a 243 m cut-and-cover tunnel to cross the N-550 in Arcade. Visit www.saitec.es
27-28/07.
Open call for tenders, deadline 4th September, 2007 for site supervision and work
inspection during construction of the 6.2 km Cerponzons-Portela section on the
Atlantic coast high speed line in Pontevedra province. This section includes the
1.3 km San Amaro tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167802-2007,
OJ S 136, or contact Ministry of Development, Madrid, fax +34 915979342. E-mail
vrpascual@fomento.es and cpublic@fomento.es
30/07.
Open call for tenders, deadline 6th September, 2007 for construction of the 6.2
km Cerponzons-Portela section on the Atlantic coast high speed line in Pontevedra
province, including the 1.3 km San Amaro tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=174770-2007,
OJ S 141, or contact Ministry of Development, Madrid, fax +34 915979342 or 5978470.
E-mail vrpascual@fomento.es and cpublic@fomento.es
31/07.
Typsa signed a EUR3 million contract for supervision of construction works on
the Das Maceiras-Redondela and Redondela-Soutomaior sections, respectively 3.9
km and 3.5 km long, on the Atlantic coast high speed link between La Coruna and
Vigo. The first section includes the 1.2 km Novelle tunnel and cut-and-cover tunnels
in Sampaio de Abajo and Anselle de Abajo, 100 m and 60 m in length. The second
section includes the 2,155 m Arcade tunnel. Visit www.typsa.es
31/07.
Open call for bids, deadline 13th September, 2007 for design of the safety and
telecommunication equipment for the Vilagarcía de Arousa-Padrón section on the
Atlantic coast high speed link. The Vilagarcía de Arousa-Catoira subsection includes
three tunnels, of 1,320, 950 and 490 metres in length. The A Vacariza-Rialiño
subsection includes two tunnels, of 300 and 650 metres in length. The Rialiño-Padrón
subsection includes a 1.7 km tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=184135-2007,
OJ S 148, or contact ADIF, fax +34 915979342 or 915978470. E-mail vrpascual@fomento.es
or cpublic@fomento.es 33/07.
Enmacosa secured a EUR2 million contract for site supervision and work inspection
during construction of the 6.2 km Cerponzons-Portela section on the Atlantic coast
high speed line in Pontevedra province. This section includes the 1.3 km San Amaro
tunnel. Visit www.enmacosa.com
45/07.
Ardanuy scooped a EUR374,500 contract to design the safety and telecommunication
equipment for the Vilagarcía de Arousa-Padrón section on the Atlantic coast high
speed link. The Vilagarcía de Arousa-Catoira subsection includes three tunnels,
of 1,320, 950 and 490 metres in length. The A Vacariza-Rialiño subsection includes
two tunnels, of 300 and 650 metres in length. The Rialiño-Padrón subsection includes
a 1.7 km tunnel. Visit www.ardanuy.com
47/07.
Open call for tenders, deadline 14th March, 2008 for construction of the 8.6 km
Rialiño-Padrón section on the Atlantic coast high speed line. This section includes
the 1,460 m-long 85 sq m Bustelo tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=46794-2008,
OJ S 34, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
09/08.
Open call for tenders, deadline 22nd April, 2008 for construction of the Vilagarcia
de Arousa-Catoira section in Pontevedra province on the Atlantic coast high speed
link. This 8.3 km section includes the 1,970 m Quinteiro tunnel, the 1,335 m Valicobas
tunnel, the 625 m Abalo tunnel and the 560 m Outeiro cut-and-cover tunnel. All
will accommodate two tracks and feature a minimum cross-section of 85 square metres.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=74297-2008,
OJ S 55, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
14/08.
Open call for tenders, deadline 22nd April, 2008 for construction of the A Vacariza-Rialiño
section in La Coruña province on the Atlantic coast high speed link. This 8 km
section includes the 372 m Monte Ceán tunnel and the 866 m Monte Pozas tunnel.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=74296-2008,
OJ S 55, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
14/08.
Open call for tenders, deadline 13th May, 2008 for construction supervision of
the 8 km A Vacariza-Rialiño and 8.6 km Rialiño-Padrón sections in La Coruña province
on the Atlantic coast high speed link. This includes the 372 m Monte Ceán tunnel,
the 866 m Monte Pozas tunnel and the 1,460 m Bustelo tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=78663-2008,
OJ S 58, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
14/08.
Open invitation to tender, deadline 12th June, 2008 for execution of works to
install the safety systems on the Cerceda-Meirama-Bregua section. The 8.1 km Cerceda-Meirama
section includes two tunnels (1,735 m and 180 m) and the 5 km Meirama-Bregua section
includes a 3,469 m tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105360-2008,
OJ S 78, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
18-19/08.
Open invitation to tender, deadline 17th June, 2008 for work management during
installation of the safety systems on the Cerceda-Meirama-Bregua section on the
Atlantic coast high speed line. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=110301-2008,
OJ S 81, or contact Ministry of development, Madrid, fax +34 915979342 or 915978470.
E-mail vrpascual@fomento.es or cpublic@fomento.es
19/08.
The Ministry of development has awarded a joint venture of FCC and Convensa the
construction of the A Vacariza-Rialiño section, in La Coruña province, at a price
of EUR91.4 million and a time frame for execution of 36 months. This 8 km section
forms part of the Atlantic coast line that goes from Ferrol to the border with
Portugal. Of particular interest are the Monte Cean and Monte Pozas tunnels, 372
and 866 m in length respectively. Visit www.fcc.es
29/08.
The Ministry of development has awarded a joint venture of Acciona Infraestructuras
and Obras Subterraneas the construction of the Vilagarcia de Arousa-Catoira section,
in Pontevedra province, at a contractual price of EUR126.4 million and a time
period for execution of 36 months. This 8.3 km section forms part of the Atlantic
coast high speed line from Ferrol to the Portuguese border. The project includes
the construction of several tunnels: Quinteiro (1,970 m), Valicobas (1,335 m),
Abalo (625 m) and a cut-and-cover tunnel in Outeiro (560 m), all of them being
dual-track tunnels. The new line abandons the route followed by the current line,
which runs along the Arousa estuary and the Vilagarcia urban area, to adopt an
hinterland path across the hills of Monte Xiabre to connect with the Ulla river.
South of Vilagarcia de Arousa, it connects with the Portas railway bypass, which
is going to be put in service soon, and in the north with a viaduct on the Ulla
river, which will be awarded soon. Visit www.acciona-infraestructuras.es
and www.obrassubterraneas.es
29/08.
Ferrovial Agroman scooped a EUR82.1 million construction contract for the 8.6
km Rialiño-Padrón section on the Atlantic coast high speed line. This section
includes the 1,460 m-long 85 sq m Bustelo tunnel. Visit www.ferrovial.es
31/08.Ineco pocketed a EUR2.9
million contract for construction supervision of the 8 km A Vacariza-Riali?o
and 8.6 km Riali?o-Padr?n sections in La Coru?a province on the Atlantic coast
high speed link. This includes the 372 m Monte Ce?n tunnel, the 866 m Monte
Pozas tunnel and the 1,460 m Bustelo tunnel. Visit www.ineco.es
34-35/08.
Open invitation to tender, deadline 22.08.2011, for construction of the 6.6 km-long O Canizo tunnel section, through A Mezquita and A Gudina municipalities, Ourense province, on Madrid-Galicia high speed railway. The tender includes the right tube of the 5,372.2 m O Canizo tunnel and the platforms of Puerta de Galicia/Porta de Galicia station at A Gudina. Contract value EUR75.6 million excluding VAT, duration 35 months. Time limit for access to documents 16.08.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210772-2011. 28/11.
Open invitation to tender, deadline 03.08.2011, for trackbed installation on Tunnel de la Canda-Vilavellala sub-section, Zamora-Ourense section, on high-speed line Madrid-Galicia, including Vilavella tunnel (902 m). Contract duration 28 months, value EUR49,907,724.73 excluding VAT. Time limit for access to documents 26.07.2011. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179923-2011 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185499-2011. 28/11.
Open invitation to tender, deadline 21.09.2011, for the construction of 5,369.9 m-long O Canizo tunnel (left tube) section on the Madrid-Galicia high speed line. Contract value EUR75.9 million excluding VAT, duration 35 months. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=249534-2011 and http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/21EF6FA512BB7545C12578D100314910?Opendocument. 35/11.
Open invitation to tender, deadline 25.10.2011, for construction of 2.3 km Portocamba-Cerdedelo section, including 1.7 km-long Cerdedelo tunnel, on Madrid-Galicia high speed railway. Contract value EUR98,873,481 excluding VAT, duration 35 months. Time limit for access to documents 18.10.2011. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285434-2011. 40/11.Closing Date: 25.10.2011Open invitation to tender, deadline 25.10.2011, for construction of 4.2 km Campobecerros-Portocamba section, including 3,745 m-long Portocamba tunnel, on Madrid-Galicia high speed railway. Contract value EUR88,628,240 excluding VAT, duration 30 months. Time limit for access to documents 18.10.2011. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285433-2011. 40/11.Closing Date: 26.10.2011Open invitation to tender, deadline 26.10.2011, for engineering services during construction of 4.2 km Campobecerros-Portocamba section, including 3,745 m-long Portocamba tunnel, on Madrid-Galicia high speed railway. Contract value EUR3,000,347 excluding VAT, duration 34 months. Time limit for access to documents 19.10.2011. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro,adif.es. Click here and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286074-2011. 40/11.
The JV Copasa Obras y Servicios/Tableros y Puentes/Imathia Construccion secured the EUR73.56 million contract for construction of the 6.6 km-long O Canizo tunnel section through A Mezquita and A Gudina municipalities, Ourense province, on the Madrid-Galicia high speed railway. The tender includes the right tube of the 5,372.2 m O Canizo tunnel and the platforms of Puerta de Galicia/Porta de Galicia station at A Gudina. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Click here and visit www.adif.es .46/11.
The JV SA de Obras y Servicios Copasa (60%), Tableros y Puentes, SA (30%) and Imathia Construcción SI (10%) secured the EUR62.34 million, VAT not included, for construction of the 6.6 km-long O Canizo tunnel section, through A Mezquita and A Gudina municipalities, Ourense province, on Madrid-Galicia high speed railway. The contract includes the right tube of the 5,372.2 m O Canizo tunnel and the platforms of Puerta de Galicia/Porta de Galicia station at A Gudina. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=393287-2011. 02/12.
The JV COMSA SAU (85%) and Anchelergues & Asociados SL (15%) secured the EUR43.68 million contract, VAT not included, for trackbed installation on Tunnel de la Canda-Vilavellala sub-section, Zamora-Ourense section, on high-speed line Madrid-Galicia, including Vilavella tunnel (902 m). Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=375383-2011. 02/12.
The JV Inocsa Ingenieria SL (50 percent)/Prointec SA (50 percent) secured the EUR3.53 million contract, VAT not included, for engineering and planning services during the construction of 5,369.9 m-long O Canizo tunnel (left and right tubes) section on the Madrid-Galicia high speed line. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=053016-2012. 09/12.
JV Petisa Servicios de Ingeniería/Applus Norcontrol secured the EUR2,655,141 contract for engineering services during construction of 2.3 km-long Portocamba-Cerdedelo section, including 1,700 m-long Cerdedelo tunnel, on Madrid-Galicia high speed railway. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument and www.applus.com. 10/12.
JV Getinsa Ingenieria y Control Total secured the EUR2,495,933 contract for engineering services during construction of 4.2 km-long Campobecerros-Portocamba section, including 3,745 m-long Portocamba tunnel, on Madrid-Galicia high-speed railway. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument and www.getinsa.es. 10/12.
JV Petisa Servicios de Ingeniería/Applus Norcontrol secured the EUR2,655,141 contract for engineering services during construction of 2.3 km-long Portocamba-Cerdedelo section, including 1,700 m-long Cerdedelo tunnel, on Madrid-Galicia high speed railway. Contact Adif, Madrid, tel +34 91774-4837, fax -5814, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/CB272AB7D500824AC12579B5002D4F6B?Opendocument and www.applus.com. 10/12.
The JV Assignia Infraestructuras, SA (40 percent) Copcisa, SA (40 percent) and Velasco Obras y Servicios, SA (20 percent) secured the contract, value EUR61.12 million excluding VAT, for the construction of 5,369.9 m-long O Canizo tunnel (left tube) section on the Madrid-Galicia high speed line. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=093911-2012. 15/12.
Open invitation to tender, deadline, 21.06.2012, for construction of the platform of the right track 8.1 km long Espino tunnel section, on Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR121.02 million, VAT not included, duration 33 months. Time limit for accessing documents 14.06.2012. Contact Adif, C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142758-2012. 19/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.3 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR105.14 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142756-2012. 19/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the right track 7.4 km-long tunnel de la Canda section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR110.9 million, VAT not included, duration 35 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142757-2012. 19/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.9 km-long Vilarino-Campobecerros section, on Madrid-Galicia high-speed railway, North-North West corridor. The section includes the Bolanos tunnel (right track 6,800 m, left track 6,780 m) and two viaducts. Contract value EUR107.03 million, VAT not included, duration 38 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=146143-2012. 20/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 7.6 km Prado tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR107.98 million, VAT not included, duration 34 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=147971-2012. 20/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the right track 7 km-long Vilarino-Campobecerros section, including the 6.8 km right tube of Bolanos tunnel on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR102.06 million, VAT not included, duration 38 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=148003-2012. 20/12.
Open invitation to tender, deadline 21.06.2012, for construction of the platform of the left track 8.2 km-long Espino tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contract value EUR131.84 million, VAT not included, duration 33 months. Time limit for accessing documents 14.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=148004-2012. 20/12.
Open invitation to tender, deadline 26.06.2012, for engineering services during construction of the platform of the right and left tunnel de la Canda section, on Madrid-Galicia high-speed railway, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense. Contract value EUR9.98million excluding VAT, duration 39 months. Time limit for accessing documents, 19.06.2012. Contact Adif, C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154251-2012. 21/12.
Open invitation to tender, deadline 26.06.2012, for engineering services during the construction of the platform of the left and right tracks Espino tunnel section, on the Madrid-Galicia high speed railway, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense. Contract value EUR9.47 million excluding VAT, duration 37 months. Time limit for accessing documents, 19.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154257-2012. 21/12.
Open invitation to tender, deadline 26.06.2012, for architectural, engineering and planning services during construction of the platform of the Prada-Porto and left track Prado tunnel section on the Madrid-Galicia high-speed railway, North-North West corridor. Contract value EUR4.86 million, VAT not included, duration 38 months. Time limit for accessing documents 19.06.2012. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154250-2012. 22/12.
The JV Ginprosa Ingenieria (40 percent)/Inzamac Asistencias Tecnicas (30 percent)/SERS Consultores en Ingenieria y Arquitectura (30 percent) secured the EUR3.8 million contract, VAT not included, for assistance services during the construction of the tunnel El Corno (right-hand bore) and Cerdedelo-Prado (left-hand bore) sections of the Madrid-Galicia, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense line. Contact Adif C/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=275329-2012. 36/12.
The JV Euroestudios SL, Geocontrol, SA/Geoconsult Espana Ingenieros Consultores, SA/Investigacion y Control de Calidad SA secured the EUR3.2 million contract, VAT not included, for engineering services during the construction of the platform of the left and right tracks Espino tunnel section, on the Madrid-Galicia high speed railway, Olmedo-Medina-Zamora-Puebla de Sanabria-Lubian-Ourense. Contact Adif C/Titan, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=275333-2012. 36/12.
The JV Obrascon Huarte Lain SA (70 percent)-Construcciones Adolofo Sobrino SA (15 percent) - Asfaltos y Cnes Elsan SA (15 percent) secured the EUR95.68 million contract, VAT not included, for construction of the platform of the left track 8.2 km-long Espino tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288094-2012. 38/12.
The JV Rover Alcisa SA (20 percent)-Construcciones Sanchez Dominguez Sando SA (29 percent)-Construred Obras y Servicios SA (19 percent)-Conacon (10 percent)-Ogensa (22 percent) secured the EUR79.35 million contract, VAT not included, for construction of the platform of the right track 7.4 km-long tunnel de la Canda section, on Madrid-Galicia high-speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288095-2012. 38/12.
The JV Dragados/Tecsa secured the EUR78.3 million contract, VAT included, for construction of the platform of the left track 7.6 km Prado tunnel section on the Madrid-Galicia high speed railway, North-North West corridor. Contact Adif C/Titan, Madrid, tel +34 917744837, e-mail mjmoro@adif.es. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/C41CF24C869C49E1C1257AC9002D0F7F?Opendocument. 03/13.
Open invitation to tender, deadline 10.06.2013, for delivery and installation of safety equipment in tunnels longer than 1 km on the section Vigo-Santiago di Compostela on the Atlantic coast high-speed link. The equipment includes emergency signalling and lighting systems, power and hydraulic systems, detection, fire fighting and control systems. The main tunnels are Redondela (2,491 m), Quinteiro (1,970 m), Bustelo (1,486 m), San Amaro (1,190 m) and Valicobas (1,351 m). Tender value EUR9.35 million, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 06.06.2013. Contact Adif, att.n Ramon Cabello Alvarez, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=112182-2013 and http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/F6116C0CD40B9073C1257B39005C46D1?Opendocument. 15/13.
Open invitation to tender, deadline 05.09.2013, for safety and control equipment in tunnel Da Maceiras (2 x 6 km) on Vigo-Das Maceiras section of the Atlantic high-speed line. Contract value EUR9.65 million contract, excluding VAT. Time limit for receipt of requests for documents or for accessing documents: 04.09.2013. Contact Adif, att.n Ramon Cabello Alvarez, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=236875-2013. 30/13.
The JV Tuneles Eje Atlantico (Sociedad Iberica de Construcciones Electricas, S.A. – Enclavamientos y Senalizacion Ferroviaria Enyse, S.A.) of Alcobendas secured the EUR4.98 million contract, excluding VAT, for delivery and installation of safety equipment in tunnels longer than 1 km on the section Vigo-Santiago di Compostela on the Atlantic coast high-speed link. The equipment includes emergency signalling and lighting systems, power and hydraulic systems, detection, fire fighting and control systems. The main tunnels are Redondela (2,491 m), Quinteiro (1,970 m), Bustelo (1,486 m), San Amaro (1,190 m) and Valicobas (1,351 m). Contact Adif, att.n Ramon Cabello, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=290695-2013. 36/13.
Sacyr Construccion and Neopul secured the EUR33.6 million contract for superstructure works on the 25.7 km-long section between Vilagarcia de Arousa (Pontevedra) and Padron (A Coruna) on the Atlantic coast high-speed link, including the tunnels Quinteiro (1,970 m), Valicobas (1,351 m) and Bustelo (1,486 m) for a 7.6 km total. Visit http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/C3A0256960B3F4C7C1257BF6002D02CE?Opendocument, http://www.sacyr.com/syv/repositorio/syv/gestion/gestorAcc_noticias_es/20/montajeviaVilagarciaaPadron.pdf and http://www.somague.pt. 42/13.
FCC Servicios Industriales y Energeticos secured the EUR5,843,084 contract, VAT included, for safety and control equipment in tunnel Da Maceiras (2 x 6 km) on Vigo-Das Maceiras section of the Atlantic high-speed line. Duration of contract 8 months. Contact Adif, att.n Ramon Cabello Alvarez, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit
http://prensa.adif.es/ade/u08/GAP/Prensa.nsf/Vo000A/1A31FC17E670ABA5C1257C1200350082?Opendocument. 45/13.
FCC Servicios Industriales y Energeticos di Madrid secured the EUR4,828,995 contract, excluding VAT, for safety and control equipment in tunnel Da Maceiras (2 x 6 km) on Vigo-Das Maceiras section of the Atlantic high-speed line. Contact Adif, att.n Ramon Cabello, Madrid, tel +34 913007629, fax +34 913006104, e-mail cfernandez@adif.es, rcabello@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=387285-2013. 47/13.
The JV Tuneles Galicia, Sociedad Iberica de Construcciones Electricas SA (75 %) — Sociedad Iberica de Construcciones Electricas de Seguridad SI (25 %) from Alcobendas, Madrid, secured the EUR1,437,072 contract, excluding VAT, for maintenance of civil defense and safety equipment in the Galicia tunnels on the sections which include Orense-Santiago de Compostela on the High-speed North-North West Corridor and the Vigo-La Coruna Atlantic Axis. Contact Adif, Madrid, tel +34 913007450, fax +34 913007692, e-mail contrataciondgdi@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=390351-2015. Ref.n. 2.15/28520.0003. 46/15.
Open invitation to tender, deadline 18.01.2016, for the design of civil protection and safety equipment in the tunnels of the Vilarino-Taboadela section, on Madrid-Galicia high-speed railway. The section includes the tunnels Corno (8.5 km, 8.5 km) and Prado (7.6 km, 7.6 km). The contract value is EUR 437,710.98, VAT not included, and the duration of the contract is 12 months. Time limit for accessing documents is up until the 11.01.2016. Contact Adif C/Hiedra, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422606-2015. Ref.n. 3.15/20830.0196 - P011/15. 49/15.
Open invitation to tender, deadline 18.01.2016, for the design of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The section includes the tunnels Espino (7.9 km and 7.8 km), O Canizo (5.4 km and 5.4 km), A Canda (7.3 km and 7.3 km) as well as the Padornelo-Lubian (7.3 km and 7.3 km). The contract value is EUR 457,201.03, VAT not included, duration of the contract is 12 months. The time limit for accessing documents is until the 11.01.2016. Contact Adif C/Hiedra, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422603-2015. Ref.n. 3.15/20830.0195 - P 010/15. 49/15.
Acciona Infraestructuras, SA (90 %) - CYES Infraestructuras, SA (10 %) secured the EUR79.22 million contract, excluding VAT, for construction of the platform of the right track 7 km-long Vilarino-Campobecerros section, including the 6.8 km right tube of Bolanos tunnel on the Madrid-Galicia high speed railway, North-North West corridor. Contattare Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=282001-2012. 36/12.
FCC Construccion, SA (60 %) - Contratas y Ventas, SA (30 %) - Collosa (10 %) secured the EUR82.94 million contract, excluding VAT, for construction of the platform of the left track 7.9 km-long Vilarino-Campobecerros section, on Madrid-Galicia high-speed railway, North-North West corridor. The section includes the Bolanos tunnel (right track 6,800 m, left track 6,780 m) and two viaducts. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=282000-2012. 36/12.
Prior information notice without call for competition for
the provision of protection and safety equipment in the tunnels of the
Vilarino-Taboadela section, on Madrid-Galicia high-speed railway. The section
includes the tunnels Corno (8.5 km, 8.5 km) and Prado (7.6 km, 7.6 km). The
contract value is EUR867,768.60, VAT not included, and the duration of the
contract is 15 months from award. Contact Adif-Alta Velocidad, Madrid, tel +34
915066671, email subirecciongestionadministrativa@adif.es.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=190792-2018.
25/18.
Prior information notice without call for competition for
the civil protection and safety equipment in the tunnels of the
Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The
contract value is EUR805,785.12 EUR, VAT not included. Duration of the contract
is 15 months. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188924-2018.
25/18.
Prior information notice without call for competition for the ACO (Asistencia para el Control de las Obras) for installation of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The contract value is
EUR805,785.12 EUR, VAT not included. Duration of the contract is 15 months. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188924-2018.
25/18.
Prior information notice without call for competition for
the project to provide protection and safety equipment in the tunnels of the
Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. Value of
the contract is EUR32.23million, excluding VAT. Duration of the contract 15
months from award.
Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185758-2018.
27/18.
Prior information notice without call for competition for
the design of refurbishment and upgrading protection and safety installations
in the Atlantic Axis tunnels on the Santiago de Compostela-A Coruna section. Value
contract EUR400,00, excluding VAT. Duration contract 9 months.
Contact Adif, Madrid, email gestionadministrativaAV@adif.es.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=081104-2019.
08/19.
Elecnor SA from Madrid secured the EUR27.31 million contract, excluding VAT,
for the design and maintenance of civil
protection and safety equipment in the tunnels of the Pedralba-Vilarino
section, on the Madrid-Galicia high-speed railway. Contact Adif - Alta
Velocidad, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111179-2019.
Ref.n. 4.18/20830.0283 – OM 001/18. 11/19.
Open invitation to tender, deadline 18.03.2019, for the
maintenance of civil protection and safety equipment in tunnels in Galicia,
on the Ourense-Santiago de Compostela section of the North-North West Corridor
high speed line and on Vigo-A Coruna section on the Atlantic Aje. For bid
documents please visit http://www.adif.es/es_ES/empresas_servicios/licitaciones/licitaciones.shtml.
The value of the contract is EUR5.94 million, excluding VAT. The duration of the contract is 24 months. Contact Adif, attn Rosa Cabrerizo Ruiz, Madrid, tel +34
913007689, fax +34 913006623, email rcabrerizo@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103152-2019.
Ref.n. 2.18/28520.0146. 11/19.
Postponed from 18.03.2019 to 21.03.2019, the deadline of the
open invitation to tender, for the
maintenance of civil protection and safety equipment in the tunnels in Galicia.
Located on the Ourense-Santiago de Compostela section of the North-North West Corridor high speed line and
on Vigo-A Coruna section on the Atlantic Aje. For bid documents http://www.adif.es/es_ES/empresas_servicios/licitaciones/licitaciones.shtml.
Value of the contract is EUR5.94 million, excluding VAT.
Duration contract 24 months. Contact Adif, attn Rosa Cabrerizo Ruiz, Madrid,
tel +34 913007689, fax +34 913006623, email
rcabrerizo@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118002-2019.
Ref.n. 2.18/28520.0146. 11/19.
The JV Tuneles Galicia II from Alcobenda, which includes
SICE - Sociedad Iberica de Construcciones Electricas SA (75 %) and SICE
Seguridad SL (25%) secured the EUR2.21 million contract, excluding VAT, for the
maintenance of civil protection and safety equipment in tunnels in Galicia, on
the Ourense-Santiago de Compostela section of the North-North West Corridor
high speed line and on Vigo-A Coruna section on the Atlantic Aje. Contact Adif,
attn Rosa Cabrerizo Ruiz, Madrid, tel +34 913007689, fax +34 913006623,
email rcabrerizo@adif.es.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399242-2019.
Ref.n. 2.18/28520.0146. 35/19.
Open invitation to tender, deadline 21/01/2021, for the construction of the new 1804 m Oural tunnel on the Monforte-Lugo section, of Line 800. Value of the contract is EUR53.59 million, excluding VAT. Duration of the contract 29 months. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 913007005, email cfernandez@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0319. 51/20.
Open invitation to tender, deadline 15/02/2021, for the supply, transport and unloading of bi-block reinforced concrete ties for the construction of the 1804 m Oural tunnel on the Monforte-Lugo section. Click here for tender documents and here where tenders must be sent. Value of the contract is EUR718,705.50, excluding VAT. Duration of the contract 6 months. Contact Adif, Madrid, tel +34 913007689, fax +34 913006623, email rcabrerizo@adif.es. For further tender information, please click here. Ref.n. 3.20/27510.0106. 02/21.
Open invitation to tender, deadline 02/03/2021, for the treatment of infrastructure, bridges, tunnels and earthworks on the Monforte-Lugo section (km375 + 305 - km379 + 750) of Line 800. Value of the contract is EUR7.46 million, excluding VAT. Duration of the contract 9 months. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 913007661, email jmartinezfuentes@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0246. 06/21.
Open invitation to tender, deadline 02/03/2021, for the treatment of infrastructure (bridges, tunnels and earthworks) on the Monforte-Lugo section (km379 + 750 - km386 + 474) of Line 800. Value of the contract is EUR7.69 million, excluding VAT. Duration of the contract 11 months. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 913007661, email jmartinezfuentes@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0250. 06/21.
Open invitation to tender, deadline 02/03/2021, for the treatment of infrastructure features (bridges, tunnels and earthworks) on the Monforte-Lugo section (km386 + 474 - km396 + 299) of Line 800. Value of the contract is EUR11.55 million, excluding VAT. Duration of the contract 12 months. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 913007661, email jmartinezfuentes@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0320. 06/21.
Prior information notice for the treatment of infrastructure features (bridges, tunnels and earthworks) on the Monforte-Lugo section (km375+305 - km379+750) of Line 800. Value of the contract is EUR 11.55 million, excluding VAT. Duration of the contract 12 months. Click here for tender documents and here where tenders or requests to participate must be sent. Estimated date of publication of contract notice: 30/06/2021. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. For further tender information please click here. 17/21.
The JV Luso Galaica de Traviesas SA (50 %) /Traviesas del Norte SA (50 %) was provisionally awarded the EUR 662,817.85 contract, excluding VAT, for the supply, transport and unloading of twin-block reinforced concrete ties for the construction of the 1804 m Oural tunnel on the Monforte-Lugo section. Duration of the contract is 6 months. If the administrative documentation is not in order within 10 days, a new tender will be published. Contact Adif, Madrid, tel +34 913007689, fax +34 913006623, email rcabrerizo@adif.es. For further tender information, please click here. Ref.n. 3.20/27510.0106. 19/21.
Prior information notice for the supply, transport and unloading of twin -block reinforced concrete ties for the construction of the 1804 m Oural tunnel on the Monforte-Lugo section. Click here for tender documents where tenders/requests to participate must be sent. Value of the contract is EUR 718,705.50, excluding VAT. Duration of the contract is 3 months. Estimated date of publication of the contract notice will be :31/12/2021. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, email contrataciondcc@adif.es. For further tender information, please click here. 21/21.
Ferrovial Construccion SA from Madrid secured the EUR 41.95 million contract, excluding VAT, for the construction of the new 1804 m Oural tunnel on the Monforte-Lugo section, of Line 800. Contact Adif, Madrid, tel +34 913007005, email cfernandez@adif.es. For further tender information please click here. Ref.n. 3.19/27507.0319. 27/21.
Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections:
- Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT;
- Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT;
- Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT;
- Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
- Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
- Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
- Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT;
- Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT;
- Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT.
Contact Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788, email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.
Prior information notice for technical assistance for the waterproofing works on the Vigo das Maceiras tunnel (2 x 6 km), Line 850 bifurcation Arcade - Vigo Urzaiz, km 0+658 – km 8+937, Vigo Urzaiz - Redondela HS (Pontevedra) section. Click here for tender documents and here for requests to participate. Value of the contract is EUR3 million, excluding VAT. Estimated date of publication of the contract notice will be 31/12/2024. Contact Adif, Madrid, tel +34 913007260, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/129025-2024. 10/24.
Spain,
Cordoba-Malaga
- es/41
High Speed Railway
Feasibility studies approved for 155 km-long railway with 7 tunnels of total length 18 km. Proceeding to design. Visit www.gif.es November 2000.
Award of contract for 40 boreholes totalling 14,000 m and geotechnical investigation for 25 km-long, twin-tube, 8.5 m-diameter base tunnel to consortium of Geoconsult, Ineco and CGS. Alignment and construction methods will be established. Visit www.geoconsult.at December 2000.
Tenders imminent after government approval for the 1.8 km double-track Gobantes tunnel worth Ptas6.5 billion and the 2 x 7 km Abdalajís tunnels with diameters between 8.5 and 9 m, to be connected by safety cross passages every 350 metres. Stretch including single-track east tunnel worth Ptas20.8 billion with time frame of 45 months. Work to be completed in 2006. Stretch including single-track west tunnel worth Ptas21.8 billion with same time frame. Visit www.gif.es 43/01.
Three tenders invited for tunnelling. First is for the east Abdalajís tunnel for Euro125.3 million, deadline 29th November, 2001. Visit http://ted.eur-op.int, document S 210-144184. Second is for the west Abdalajís tunnel for Euro131.3 million, dealine 28th November, 2001. Visit http://ted.eur-op.int, document S 210-144185. Third is for the Gobantes tunnel for Euro39 million, deadline 28th November, 2001. Visit http://ted.eur-op.int, document S 210-144190. Visit www.gif.es 46/01.
Call for bids imminent further to government approval for sections 17, 18 and 19 between ílora and Cí¡rtama including five tunnels in ílora (800 m), El Espartal (2 km), Tevilla (927 m), Gibralmora (3.2 km), and Cí¡rtama (2.5 km). Budget of €200 million. Visit www.gif.es 01/02.
Three construction contracts awarded by GIF. First subsection including the 1,792 m Gobantes tunnel has been awarded to Ploder for Ptas5.5 billion. Time frame of 21 months. Second subsection with the 7 km west Abdalajís tunnel has been secured by a jv of Sacyr and Somague Engenharia for Ptas20.4 billion. Time frame of 45 months. Third contract with 7 km east Abdalajís tunnel scooped by a jv of Dragados, Tecsa, SELI of Italy, and Jäger Baugesellschaft of Austria for Ptas19.6 billion. Time frame of three years. Visit www.gif.es 02/02.
Three calls for bids for construction of the ílora-Cí¡rtama section. First is for the 2.5 km Cí¡rtama tunnel worth €54.2 million. Deadline 11th February, 2002. Second is for the 927 m-long Tevilla tunnel and the 3.2 km Gibralmora tunnel, worth €65.2 million. Third is for the 800 m-long ílora tunnel and the 2 km El Espartal tunnel worth €80.6 million. Deadline 4th February, 2002 for the last two bids. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 5, documents 3801-, 3806- and 3808-2002 or contact GIF, Madrid, tel. +34 917004755. Also visit www.gif.es 03/02.
Four bids invited for work supervision. The first is for the Cí¡rtama tunnel. Tender value of €2.3 million. The second is for the Tevilla and Gibralmora tunnels. Tender value of €2.3 million. The third is for the Alora and El Espartal tunnels. Tender value of €2.7 million. Deadline 5th April, 2002 for all. The fourth is for the Gobantes tunnel. Tender value of €1.2 million. Deadline 11th April, 2002. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 33, documents 25453-, 25454-, 25455- and 25456-2002 or contact GIF, Madrid, tel. +34 917004755. 09/02.
GIF has awarded a €56.5 million contract to a jv of Obras Subterrí¡neas and Salvador Rus Lí³pez Construcciones to build the section which includes the 927 m Tevilla tunnel and the 3,187 m Gibralmora tunnel. Time frame for construction of 32 months. To date, 127.4 km out of the total 155 km have been awarded (82%). Visit www.gif.es 11/02.
Two work supervision contracts have been awarded. The first, for the 1.8 km Gobantes tunnel, goes to a jv of Idom and Geocisa for €1.28 million. The second, for the 7 km east and west Abdalajís tunnels, has been secured by a jv of Ayesa and Geocontrol for €3.2 million. Visit www.gif.es 16/02.
The 3.6 km ílora-Cí¡rtama section, comprising the 842 m ílora tunnel and 2 km El Espartal tunnel, has been awarded to Ferrovial-Agromí¡n for €72.65 million. Time frame of 39 months. Visit www.ferrovial.es. A second ílora-Cí¡rtama section, 3 km in length, with the 2.4 km Cí¡rtama tunnel has been commissioned to FCC and Convensa for €50.25 million. Time frame of 32 months. Visit www.fcc.es and www.gif.es 18/02.
Two work supervision contracts awarded. First has been scooped by Iberinsa for the Tevilla and Gibralmora tunnels, 927 m and 3.2 km in length respectively. Value €1.57 million. Visit www.iberinsa.es. Second secured by a jv of Idom and Geocisa for the Alora and El Espartal tunnels, 842 m and 2 km. Value €1.83 million. Visit www.idom.es and www.geocisa.com 26/02.
Award to Eptisa of the work supervision of the 2.5 km Cí¡rtama tunnel. Contract value €1.5 million. Visit www.eptisa.es and www.gif.es 32/02.The Ministry of development and the City of Malaga have signed a technical agreement for the penetration of the high speed line in Malaga. The trains will run 2.6 km underground from the Cortijo de Torres trade fair area, near the west ring road, to the central station. Putting underground the existing railtracks will cost €132 million. Construction to end before 2007. 14/03.Open call for bids, deadline 5th November, 2004 for designing the underground cross city section of the high speed train in Malaga (section 22). A 2.4 km section must be put underground from the west ring road to Juan XXIII Avenue. The project will cost EUR115 million, financed by the central government (64%), the Andalusian government and the city of Malaga (18% each). If all goes as planned, construction may commence before the end of 2005. Tender budget: EUR1.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=163918-2004, OJ S 192, or contact GIF, Madrid, fax +34 917005751. 42/04.The company in charge of the design of section 22, the last on the Cordoba-Malaga high speed line, will be Ayesa, for EUR950,000. This 4.5 km section requires to transfer underground 2.4 km. Visit www.ayesa.es 53/04-01/05.Open call for bids, deadline 6th June, 2005 for technical management and support to specialised teams during construction of the Cordoba-Malaga high speed link (second phase). The assignment deals with coordination of specialised teams (geology, geotechnics, structures, urbanism and machinery for the construction of tunnels). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074569-2005, OJ S 77, or contact ADIF, Madrid, fax +34 917005751. 17/05.Open call for tenders, deadline 28th November, 2005 for construction of the final section of the high speed link in Malaga. The contract corresponds to the urban penetration of the high speed line in Malaga and the upgrading of the conventional line, for a total length of 3 km. Noticeable structures include two parallel cut-and-cover tunnels, with a length of 1,932 m, one for two IUC tracks and the other for two Spanish gauge tracks. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=196021-2005, OJ S 199, or contact the Ministry of public works, Madrid, fax +34 917005751. 44/05.The Ministry of public works awarded the high speed train section in Malaga, the last section which will finalise the new Cordoba-Malaga high speed link, to Sacyr (80%) and its subsidiary Cavosa (20%). The section spans three kilometres and will cost EUR144.6 million to build, making it the most expensive section of the Cordoba-Malaga high speed line. The cost per kilometre amounts to EUR48 million. The project consists in transferring underground the tracks on a distance of 2.2 km. The section begins in the vicinity of the Cortijo de Torres congress centre and ends at Renfe railway station. The section below ground will start before the west ring road to end after the flyover at Juan XXIII avenue. The scheme requires the construction of twin cut-and-cover tunnels, 1,932 m in length. Time frame for construction is 31 months, although a maximum of 20 months will be necessary to ensure the arrival of high speed services to the city. The project will be finished at the end of 2007. The Ministry of public works will finance 64% of the total cost, while the Andalusian government and the City of Malaga will equally share the remaining 36%. Visit www.gruposyv.com and www.cavosa.es 02/06.Open call for tenders, deadline 23rd January, 2006 for work supervision during construction of the high speed section in Malaga and upgrading of the conventional line. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=241768-2005, OJ S 245, or contact ADIF, Madrid, fax +34 917005751. 02/06.Getinsa received a EUR2.2 million contract for work supervision during construction of the high speed section in Malaga and the upgrading works of the conventional line. Visit www.getinsa.es 19/06.
The JV Tuneles Abdalajis at Bilbao secured the EUR1.94 million contract, excluding VAT, for the management of civil protection installations in the Cordoba (1.8 km) and Malaga (1,932 m) urban tunnels and in the 7km Abdalajis tunnels on the Cordoba-Malaga High Speed Railway. Duration of the contract is 48 months. Contact Adif, att.n Mercedes Lopez de la Fuente, Madrid, tel +34 913007260, fax +34 913006623, e-mail mlfuente@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=403665-2015. Ref.n. 2.14/20506.0067. 47/15.
Prior information to tender for the comprehensive management service of the protection and security equipment in the 1.8 km ad 1.9.km urban tunnels in Cordoba and Malaga and in the 15 tunnels for 33 km in total of the Cordoba-Malaga and Antequera-Granada high-speed lines. Value of the contract is EUR7.13 million, excluding VAT. Duration of the contract is 48 months. Estimated date of publication of the contract notice: 30/06/2021. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-contrataciondcc@adif.es. For further on TED tender, please click here. 19/21.
Open invitation to tender, deadline 31/05/2021, for the comprehensive management service of the protection and security equipment in the 1.8 km ad 1.9.km urban tunnels in Cordoba and Malaga and in the 14 tunnels for 33 km in total of the Cordoba-Malaga and Antequera-Granada high-speed lines. Value of the contract is EUR8.94 million, excluding VAT. Duration of the contract is 48 months. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 913007567, email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=222897-2021. 18/21.
The Joint Venture Mantenimiento tuneles LAV Sur - composed of Cobra Instalaciones y Servicios SA, Cobra Sistemas de Seguridad SA and Moncobra SA - from Madrid secured the EUR 6.24 million contract, excluding VAT, for the comprehensive management service of the protection and security equipment in the 1.8 km ad 1.9.km urban tunnels in Cordoba and Malaga and in the 14 tunnels for 33 km in total of the Cordoba-Malaga and Antequera-Granada high-speed lines. Contact Adif, Madrid, tel +34 913007567, email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=647063-2021. 50/21.
Restricted invitation to tender, deadline 28/01/2022, for the control and monitoring of the coating lining of the twin tube and single track Abdalajis tunnels on the Antequera-Malaga section, Cordoba-Malaga High Speed Railway. The 7246 m East tube from km108/588 to km115/834 and the 7324 m West tube from km108/557 to km115/881 are connected by 17 bypasses. Value of the contract is EUR721,222.86, excluding VAT. Duration of the contract is 48 months. Contact Adif, Madrid, tel +34 913007453, email jrodrigo@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=656791-2021. Ref.n. 2.21/27506.0026. 51/21.
Spain-Madrid: Technical inspection services
2021/S 248-656791
Contract notice
Services
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority
I.1)Name and addresses
Official name: ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS
National registration number: Q2801660H
Postal address: AVENIDA PIO XII, 110 - EDIFICIO 16 (ESTACION DE CHAMARTIN)
Town: Madrid
NUTS code: ES300 Madrid
Postal code: 28036
Country: Spain
E-mail: jrodrigo@adif.es
Telephone: +34 913007453
Internet address(es):
Main address: www.adif.es
Address of the buyer profile: https://contrataciondelestado.es/wps/portal/perfilContratante
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://contrataciondelestado.es/wps/portal/perfilContratante
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://elicitadores.adif.es
I.4)Type of the contracting authority
Body governed by public law
I.5)Main activity
Other activity: INFRAESTRUCTURAS
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
SERVICIOS PARA EL CONTROL Y AUSCULTACIÓN DEL REVESTIMIENTO ESTANCO DE LOS TÚNELES DE ABDALAJÍS (MÁLAGA). LÍNEA DE ALTA VELOCIDAD CÓRDOBA – MÁLAGA
Reference number: 2.21/27506.0026
II.1.2)Main CPV code
71631000 Technical inspection services
II.1.3)Type of contract
Services
II.1.4)Short description:
SERVICIOS PARA EL CONTROL Y AUSCULTACIÓN DEL REVESTIMIENTO ESTANCO DE LOS TÚNELES DE ABDALAJÍS (MÁLAGA). LÍNEA DE ALTA VELOCIDAD CÓRDOBA – MÁLAGA
II.1.5)Estimated total value
Value excluding VAT: 721 222.86 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ES61 Andalucía
Main site or place of performance:
MÁLAGA
II.2.4)Description of the procurement:
SERVICIOS PARA EL CONTROL Y AUSCULTACIÓN DEL REVESTIMIENTO ESTANCO DE LOS TÚNELES DE ABDALAJÍS (MÁLAGA). LÍNEA DE ALTA VELOCIDAD CÓRDOBA – MÁLAGA
II.2.5)Award criteria
Criteria below
Quality criterion - Name: Criterios evaluables mediante un juicio de valor. Ponderación (PCJV) / Weighting: 49%
Cost criterion - Name: Criterios cuantificables mediante fórmulas. Ponderación (PCCF) / Weighting: 51%
II.2.6)Estimated value
Value excluding VAT: 721 222.86 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 48
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: no
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: yes
Identification of the project:
Podrá ser cofinanciado por el fondo Europeo de Desarrollo Regional (FEDER).
II.2.14)Additional information
Section III: Legal, economic, financial and technical information
III.1)Conditions for participation
III.1.2)Economic and financial standing
Selection criteria as stated in the procurement documents
III.1.3)Technical and professional ability
Selection criteria as stated in the procurement documents
Section IV: Procedure
IV.1)Description
IV.1.1)Type of procedure
Restricted procedure
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 28/01/2022
Local time: 11:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Spanish
Section VI: Complementary information
VI.1)Information about recurrence
This is a recurrent procurement: no
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Tribunal Administrativo Central de Recursos Contractuales
Postal address: Avenida General Perón, 38, 8ª planta
Town: Madrid
Postal code: 28020
Country: Spain
E-mail: tribunal_recursos.contratos@hacienda.gob.es
Telephone: +34 913491319
VI.4.4)Service from which information about the review procedure may be obtained
Official name: ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS (SUBDIRECCIÓN DE CONTRATACIÓN DE MANTENIMIENTO)
Postal address: AVENIDA PIO XII, 110 - EDIFICIO 16
Town: Madrid
Postal code: 28036
Country: Spain
E-mail: efgonzalez@adif.es
Telephone: +34 913007762
Internet address: www.adif.es
VI.5)Date of dispatch of this notice:
17/12/2021