The JV Assignia Infraestructuras, SA (40 percent) Copcisa, SA (40 percent) and Velasco Obras y Servicios, SA (20 percent) secured the contract, value EUR61.12 million excluding VAT, for the construction of 5,369.9 m-long O Canizo tunnel (left tube) section on the Madrid-Galicia high speed line. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=093911-2012. 15/12.