Elecnor SA from Madrid secured the EUR27.31 million contract, excluding VAT,
for the design and maintenance of civil
protection and safety equipment in the tunnels of the Pedralba-Vilarino
section, on the Madrid-Galicia high-speed railway. Contact Adif - Alta
Velocidad, Madrid, tel +34 917744804, fax +34 917674490, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=111179-2019.
Ref.n. 4.18/20830.0283 – OM 001/18. 11/19.