The JV Luso Galaica de Traviesas SA (50 %) /Traviesas del Norte SA (50 %) was provisionally awarded the EUR 662,817.85 contract, excluding VAT, for the supply, transport and unloading of twin-block reinforced concrete ties for the construction of the 1804 m Oural tunnel on the Monforte-Lugo section. Duration of the contract is 6 months. If the administrative documentation is not in order within 10 days, a new tender will be published. Contact Adif, Madrid, tel +34 913007689, fax +34 913006623, email rcabrerizo@adif.es. For further tender information, please click here. Ref.n. 3.20/27510.0106. 19/21.