Prior information notice without call for competition for the ACO (Asistencia para el Control de las Obras) for installation of civil protection and safety equipment in the tunnels of the Pedralba-Vilarino section, on the Madrid-Galicia high-speed railway. The contract value is
EUR805,785.12 EUR, VAT not included. Duration of the contract is 15 months. Contact Adif-Alta Velocidad, Madrid, tel +34 915066671, email subirecciongestionadministrativa@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188924-2018.
25/18.