Acciona Infraestructuras, SA (90 %) - CYES Infraestructuras, SA (10 %) secured the EUR79.22 million contract, excluding VAT, for construction of the platform of the right track 7 km-long Vilarino-Campobecerros section, including the 6.8 km right tube of Bolanos tunnel on the Madrid-Galicia high speed railway, North-North West corridor. Contattare Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=282001-2012. 36/12.