The JV Inocsa Ingenieria SL (50 percent)/Prointec SA (50 percent) secured the EUR3.53 million contract, VAT not included, for engineering and planning services during the construction of 5,369.9 m-long O Canizo tunnel (left and right tubes) section on the Madrid-Galicia high speed line. Contact Adif, Madrid, tel +34 917744837, fax +34 917745814, e-mail mjmoro@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=053016-2012. 09/12.